New Terminal Program Lafayette Regional Airport

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Comprehensive Development Plan Sea-Tac International Airport Briefing to: Mediated Role Determination Committee April 20, 2006.
Presentation to SEC-AAAE Annual Conference Chicago Department of Aviation April 19, 2010.
Sustainability and the Airfield – What’s in Store for Airports FAA Eastern Region Conference March 4 - 6, 2009 – Hershey, PA.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
Feasibility Study Schemes: · Scheme 1—Renovating and expanding the meetinghouse. This scheme moves the meetinghouse about 20 ft. west, converts it to.
A Long Term Solution Oak Ridge Addition. NPD117’ s Core Values Visionary Leadership Learning-Center Education Organizational and Personal Learning Managing.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
University of Toronto Mississauga Campus: UTM Master Plan Update Campus and Facilities Planning | March University of Toronto Mississauga Campus.
John F. Kennedy High School – Science Wing, Richmond, CA Progress Report POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING March 12,
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Kelowna International Airport 2010 Development Program September 17, 2007.
TRB Session January 23, 2007 Transportation Research Board Session Lessons Learned from Large Airport Development “Orlando Airport Experience”
2010 FAA Worldwide Airport Technology Conference Chicago Department of Aviation April 20, 2010.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Successfully Diverse Partnerships = Economic Impact ACEC Indiana 10 th Annual Diversity Network Fair Shannetta Griffin, P.E.
North Augusta High School Design Development Presentation.
Transportation Projects City Council Workshop May 14, 2013.
SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.
PRESENTATION TO: CITRUS COUNTY BOARD OF COUNTY COMMISSIONERS 11 AUGUST 2015 INVERNESS AIRPORT MASTER PLAN UPDATE.
San Francisco Fire Department Facilities Update.
Columbus Airport Authority We’re Really Taking Off! November 6, 2002.
North Terminal Project Overview July 16, North Terminal Program Schedule.
H IGHWAY Pavement Structure  Sub grade: is usually the natural material located along the horizontal alignment of pavement and serves as the foundation.
The 14-Gate Replacement Terminal Project at Hollywood Burbank Airport Presentation to the Construction Management Associates of America (CMAA) May 26,
1 Federal Aviation Administration AirTAP Fall Forum Wednesday, October 11, Airport Funding Status AirTAP Fall Forum Bob Huber Federal.
Teterboro Airport Part 150 Noise/Land Use Compatibility Study
Dallas Fort Worth International Airport: Travel. Transformed
Airport Rental Car Facility Planning Trends
Parallel Taxiway and Apron Expansion Project Open House
Northern Colorado Regional Airport Commission
Charlotte Douglas International Airport
Huntington Convention Center of Cleveland &
Wilkes-Barre/Scranton International Airport Taxiway B Extension to the Runway 22 End By: Steve Mykulyn, PE and Rick Holes, PE September 28, 2017.
Airport Planning.
Airport Design Introduction
HXD Project Update 8/10/2016.
Kerr Tar Project Update – June 2016
21st Century School Buildings Plan
Transportation Research Board
Board of Trustees Meeting
Lafayette New Terminal Program Update
Shanghai/Pudong Airport
Shanghai/Pudong Airport
Fort Worth Alliance Airport Runway Extension/
McKinney Airport Master Plan Update April 3, 2018
Issaquah-Fall City Road
McKinney Airport Master Plan Update June
CH 42 & TH 13 Construction Update
McKinney Airport Master Plan Update May 1, 2018
Board of Regents Capital Projects Review & Approval Process
Lafayette New Terminal Program Update
Lafayette New Terminal Program Update
Lafayette New Terminal Program Update
Lafayette New Terminal Program Update
Shanghai/Pudong Airport
NAVIGATING THE NEPA PROCESS Prepared by: Janet Flynn, PennDOT’s Bureau of Aviation Sue McDonald, Federal Aviation Administration September 18, 2018.
Lafayette New Terminal Program Update
North Augusta High School – Phase 2A and 2B
Lafayette New Terminal Program Update
Pierre Regional Airport Master Plan Update
The New Leavelle McCampbell Middle School
Lafayette New Terminal Program Update
Lafayette New Terminal Program Update
Short and mid-term project needs for MSFD implementation
Lafayette New Terminal Program Update
Lafayette Airport Commission New Terminal Program Update
Lafayette Airport Commission New Terminal Program Update
Project/program update
Presentation transcript:

New Terminal Program Lafayette Regional Airport Program Update November 8, 2017

Agenda Airside & Landside Site Analysis Terminal Facilities Cost / Budget Update Schedule

Terminal program: site

OVERALL SITE PLAN

Quick Turn Around

Preferred location

QTA Site Plan

QTA Floor Plan

QTA Floor Plan

Perspective Looking North

Perspective Looking South

QTA Floor Plan

Perspective Southeast

Terminal program: RTR Cable

RTR Update Signal Analysis FAA Coordination Next Steps

RTR CABLE RELOCATION QTA FACILITY CHAPLIN DR SURREY ST SHEPARD DR BLUE BLVD DETENTION POND EXISTING RTR CABLE BORMAN DR LONG TERM LOT TAXIWAY B PROPOSED RTR CABLE SHORT TERM LOT TERMINAL DR NEW TERMINAL VIP LOT READY RETURN LOT RUNWAY 11-29 EMPLOYEE LOT TAXIWAY A NEW AIRFIELD PAVEMENT EXISTING RTR CABLE RTR CABLE RELOCATION

Terminal program: building

FIRST FLOOR LAYOUT

SECOND FLOOR LAYOUT

EXTERIOR PERSPECTIVE - CURBSIDE

EXTERIOR PERSPECTIVE - LANDSIDE

EXTERIOR PERSPECTIVE - AIRSIDE

INTERIOR PERSPECTIVE – LOBBY/TICKETING

Terminal program: budget and schedule

Schematic Design - Terminal Estimate Terminal Building* Construction $61.8M Program $79.0M *Terminal Building cost does not include Landside or Airside Civil Site or Costs associated with the Quick Turn Around Facility Update with new information

Schedule* *Schedule is based on receiving FAA discretionary funding starting in year 2018 and no impacts related to the RTR Facility

QUESTIONS?