GEMİ YAPISI TARİFİ VE NOTLAR (SHIP CONSTRUCTION SKETCHES AND NOTES) Prepared by Selçuk NAS
GEMİ YAPISI TARİFİ VE NOTLAR (SHIP CONSTRUCTION SKETCHES AND NOTES) 1. GEMİ ÖLÇÜLERİ ( SHIP DIMENSIONS) 2. GEMİ YÖNLERİ VE GÜVERTELERİ ( SHIP DIRECTIONS AND DECKS ) 3. GEMİ GENEL YAPISI ( SHIP GENERAL STRUCTURE ) 4. BASİT AMBAR PLANI (BASIC HOLD PLAN) 5. SU ÇEKİMİ VE TRİM ( DRAFT AND TRIM ) 6. YÜKLEME MARKALARI (TONNAGE MARKS)
GEMİ YAPISI TARİFİ VE NOTLAR (SHIP CONSTRUCTION SKETCHES AND NOTES) GEMİ ÖLÇÜLERİ ( SHIP DIMENSIONS) TAM BOY ( OVERALL LENGHT ) KARİNA (BOTTOM OF THE VESSEL) GENİŞLİK ( BREADTH ) FAÇA (BOOT TOP) BORDA (BOARD)
GEMİ YAPISI TARİFİ VE NOTLAR (SHIP CONSTRUCTION SKETCHES AND NOTES) GEMİ YÖNLERİ VE GÜVERTELERİ ( SHIP DIRECTIONS AND DECKS ) CAN FİLİKASI (LIFE BOAT) İSKELE (PORT) PORT SIDE MİYAR GÜVERTE (STANDARD COMPASS DECK) ALT GÜVERTE (LOWER DECK) FİLİKA GÜVERTE BOAT DECK KÖPRÜÜSTÜ GÜVERTE (BRIDGE DECK) OMUZLUK (BOW) PUPA (AFT) PRUVA (HEAD) SANCAK (STARBOARD) STARBOARD SIDE BAŞÜSTÜ (FORE CASTLE DECK) KIÇ ÜSTÜ (POP DECK) ANA GÜVERTE (MAİN DECK)
GEMİ YAPISI TARİFİ VE NOTLAR BAŞ DİREK GRANDİ DİREĞİ (MAIN MAST) AMBAR (HOLD) AMBAR AĞZI (HATCH) AMBAR KAPAĞI (HATCH COVER) BAŞ TARAF KÖPRÜÜSTÜ (BRIDGE) YAŞAM MAHALİ (ACCOMMODATION) BACA (FUNNEL) KIÇ TARAF BAŞALTI BULP BAŞ BODOSLAMA BAŞ ÜSTÜ PERVANE (PROPELLER) DÜMEN YELPAZESİ (RUDDER FRAME) KIÇ ÜSTÜ 1 2 3 4 5 SU SEVİYESİ BAŞ PİK TANKI (FORE PEAK TANK) BALLAST TANKI KIÇ PİK TANKI (AFT PEAK TANK) FUEL OIL TANKI DIESEL OIL TANKI LUB. OIL TANKI ANA MAKİNE (MAIN ENGINE) GEMİ GENEL YAPISI ( SHIP GENERAL STRUCTURE )
GEMİ YAPISI TARİFİ VE NOTLAR (SHIP CONSTRUCTION SKETCHES AND NOTES) BASİT AMBAR PLANI (BASIC HOLD PLAN) AMBAR KAPAĞI (HATCH COVER) KAPAK PİSTONU MANİKA (WIND CATCHER) AMBAR MERDİVENİ (HOLD LADDER) GLADORA (TWEENDECK) İSKANDİL DELİĞİ (SOUNDING HOLE) KEMERE (BEAM) ASMA TANK (TOP SIDE) ALABANDA (WING) KATLANIR KAPAK İSKANDİL BORUSU (SOUNDING PIPE) DİP AMBAR (HOLD) POSTA (FRAME) HAVALANDIRMA BORUSU (VENT. PUMP) AMBAR SİNTİNESİ İSKANDİL KUYUSU (WIND CATCHER) ÇİFT DİP (DOULE BOTTOM) OMURGA (KEEL) DÖŞEK (FLOOR)
GEMİ YAPISI TARİFİ VE NOTLAR (SHIP CONSTRUCTION SKETCHES AND NOTES) SU ÇEKİMİ VE TRİM ( DRAFT AND TRIM ) Gemilerdeki Free board değerleri INTERNATIONAL CONVENTION ON LOAD LINE’da belirlenmiştir. Ø FREE BOARD AFT DRAFT MEAN DRAFT FORE DRAFT KEEL CLEARANCE TRIM = AFT DRAFT - FORE DRAFT MEAN DRAFT = (AFT DRAFT + FORE DRAFT) / 2 ? LINE OF DEEP REFERENCE
GEMİ YAPISI TARİFİ VE NOTLAR (SHIP CONSTRUCTION SKETCHES AND NOTES) YÜKLEME MARKALARI (TONNAGE MARKS) TF : TROPICAL FRESH WATER F : FRESH WATER T : TROPICAL WATER S : SUMMER WATER W : WINTER WATER WNA : WINTER NORTH ATLANTIC L : LUMBER
THIS PRESENTATION WAS PREPARED BY SELÇUK NAS E MAIL : snas@deu.edu.tr Mobile Phone : 0 532 331 51 31 Phone : 0 90 232 278 22 30 Address : Dokuz Eylul Universitesi, Deniz Isletmeciligi ve Yonetimi Yuksekokulu, Kaynaklar Yerleskesi, Buca, Izmir, TURKEY You can use all my product where ever you want.