De PROFIBUS, PROFINET & IO-Link dag 2011 Share our Vision for Automation.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
:. A. B. C. D. A. 92% 90% 60 P S.. ~ ~
1 UNIT I (Contd..) High-Speed LANs. 2 Introduction Fast Ethernet and Gigabit Ethernet Fast Ethernet and Gigabit Ethernet Fibre Channel Fibre Channel High-speed.
Fill in missing numbers or operations
Ozone Level ppb (parts per billion)
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
1 1  1 =.
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Year 6 mental test 10 second questions
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
How fractions, decimals and percentages work together.
ZMQS ZMQS
Year 6/7 mental test 5 second questions
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
The VARAN Bus, the Real-Time Ethernet Bus System 1 / 23 The VARAN Bus.
ABC Technology Project
Look at This PowerPoint for help on you times tables
Multiple dependency activity on node (AoN) networks ( lecture )
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
We are learning how to read the 24 hour clock
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Sets Sets © 2005 Richard A. Medeiros next Patterns.
Least Common Multiples and Greatest Common Factors
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
25 seconds left…...
Subtraction: Adding UP
Test B, 100 Subtraction Facts
Week 1.
Number bonds to 10,
Beat the Computer Drill Divide 10s Becky Afghani, LBUSD Math Curriculum Office, 2004 Vertical Format.
2 x0 0 12/13/2014 Know Your Facts!. 2 x1 2 12/13/2014 Know Your Facts!
We will resume in: 25 Minutes.
Connecting LANs, Backbone Networks, and Virtual LANs
1 Unit 1 Kinematics Chapter 1 Day
VPN AND REMOTE ACCESS Mohammad S. Hasan 1 VPN and Remote Access.
Chapter 30 Induction and Inductance In this chapter we will study the following topics: -Faraday’s law of induction -Lenz’s rule -Electric field induced.
Presentation transcript:

De PROFIBUS, PROFINET & IO-Link dag 2011 Share our Vision for Automation

De PROFIBUS, PROFINET & IO-Link dag 2011 V 2 Determinisme in Mixed Networks People | Power | Partnership Peter Van Passen Product Manager ICPN/AutomationIT HARTING nv Pushing Performance

De PROFIBUS, PROFINET & IO-Link dag Mixed netwerken ?!? Eén Netwerk voor alle applicaties: Bureautica; Productie; Fabriek en Machine Office IT Automation IT Industrial Automation Ethernet IEEE Pushing Performance

De PROFIBUS, PROFINET & IO-Link dag Huidige topologie industriële automatisering Pushing Performance Fieldbus: Profibus DP, Interbus, Devicenet … Drive Real-Time plus Determinism I/O Field Level Voice over IP Core Level SCADA HMI PLC Real-Time Control Level

De PROFIBUS, PROFINET & IO-Link dag Beperkingen „mixed“ automation netwerken Pushing Performance Line topology met PROFINET RT standaard Switchen cascade of more than 10 Switches in line X Requirements: - Determinisme - cycle time ~ 1ms X X X

De PROFIBUS, PROFINET & IO-Link dag Performantie Standaard Ethernet (IEEE 802.3) Pushing Performance Switches Standard switching delay [ μ sec] Field bus (bus-cycle) PLC I/O Drive (voorbeeld met 16 Switches)

De PROFIBUS, PROFINET & IO-Link dag Ethernet IEEE 802.1p & 802.1q Pushing Performance PriorityType 7Network critical 6Voice 6Automation 5Video 4Business critical 0-3Datatransfer 0-3Web 0-3TCP acknowledge Preamble SFD Destination Source VLANType 7 Byte 1 6 Byte Byte 8100 Ethernet Header Data FCS 4 Byte Example of priorization of automation protocols Automation-frames en IT-frames hebben dezelfde prioriteit! Ontoereikend! xx

De PROFIBUS, PROFINET & IO-Link dag Traffic-jam ondanks Priorization (IEEE 802.1q) Pushing Performance 120 µsec Automation-frame IT-frame 10 µsec PLCDriveSwitch 1Switch 2Switch 3 Automation-frames moeten wachten, totdat het volledige IT-frame is verstuurd! 60 µsec (voorbeeld met 3 Switchen)

De PROFIBUS, PROFINET & IO-Link dag Pushing Performance μsec Store & forward Switch 1Switch 2Switch 3Switch 4Switch 5 Traffic-jam ondanks Priorization (IEEE 802.1q) (voorbeeld met 5 Switchen)

De PROFIBUS, PROFINET & IO-Link dag Pushing Performance Switching Technologie: Operating Modes Huidige Switch Technologie: Store and Forward Store & forward

De PROFIBUS, PROFINET & IO-Link dag Pushing Performance Switching Technologie: Operating Modes Oudere Switch Technologie: Cut through / Modified Cut through cut through

De PROFIBUS, PROFINET & IO-Link dag Acceleratie met „Cut-through“ Pushing Performance μsec cut through Store & forward Switch 1Switch 2Switch 3Switch 4Switch 5 (zonder network load)

De PROFIBUS, PROFINET & IO-Link dag Identificatie van automatiseringsprofielen? Pushing Performance VLAN Tag 0,00,641,61,791,92 time (µsec) … Ether- type 2 2,24 Ethernet headerIP header Port 2222 UDP headerFCS UDP Data Ethernet headerIP header Port 502 TCP DataFCS TCP header Ethernet/IP Modbus TCP/IP Profinet Automation-frames en IT-frames kunnen nu apart behandeld worden, maar de vertraging zal nog steeds voorkomen!

De PROFIBUS, PROFINET & IO-Link dag Acceleratie van geidentificeerde frames Pushing Performance cut through EN network load μsec cut through Store & forward Switch 1Switch 2Switch 3Switch 4Switch 5

De PROFIBUS, PROFINET & IO-Link dag Hoe determinisme bekomen? Pushing Performance Automation frame IT-frame 4. Resend of the NRT-frame 1. Identify the automaion frame 2. Suspend the NRT-frame 3. Direct transmission of the automation frame

De PROFIBUS, PROFINET & IO-Link dag De oplossing: FAST TRACK Switching Pushing Performance Naadloos Ethernet tot in de machine Industrial Automation Office IT Fast Track Switch 3.Overtake: Onderbreking van IT-frames indien nodig overtakeidentify 1.Identify: Identificatie van automatiseringspakketten accelerate 2.Accelerate: Versnelling door gebruik van cut-through

De PROFIBUS, PROFINET & IO-Link dag Mixed Automation Netwerk Limitations Pushing Performance μsec Switch 1Switch 2Switch 3Switch 4Switch 5 Fast Track Switching Store & forward

De PROFIBUS, PROFINET & IO-Link dag FAST TRACK Switching Pushing Performance Switches Store & Forward Switching Delay [μ sec] Field bus (bus-cycle) Fast Track Switching Determinisme & Hoge Performantie Industrial Automation Office IT

De PROFIBUS, PROFINET & IO-Link dag Mixed Automation Netwerk Pushing Performance 19 Pushing Performance Line topology met PROFINET RT, Fast Track Switchen Requirements: - Determinisme - cycle time ~ 1ms    cascade of more than 10 Switches in line 

De PROFIBUS, PROFINET & IO-Link dag FAST TRACK Switching WORKSHOP Pushing Performance 20 Pushing Performance FAST TRACK WORKSHOP

De PROFIBUS, PROFINET & IO-Link dag FAST TRACK Switching WORKSHOP Pushing Performance 21 Pushing Performance See HARTING Tabletop

De PROFIBUS, PROFINET & IO-Link dag Pushing Performance 22 Pushing Performance Bedankt voor de aandacht !