Enforcement Market consultation information meeting September 10 th, 2012.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
1 System Engineers Toolbox 1 Compliance Automation, Inc. INCOSE: NM Enchantment Chapter By Cheryl Hill August 12, 2009.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Membership & Roster Maintenance September 2013 ASTM Officers.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Federal Ministry of Transport, Building and Urban Affairs 1 The German Tolling Prospects Edith Buss Ministry of Transport, Building and Urban Affairs.
SOA for EGovernment 1 Emergency Services Enterprise Framework: A Service-Oriented Approach Sukumar Dwarkanath COMCARE Michael Daconta Oberon Associates.
Interoperability of electronic road toll systems in the EU The European Electronic Toll Service (EETS) Directive 2004/52/EC & Decision 2009/750/EC Charles.
1 ITU Interconnection Workshop 17 August 2001 Role of the Regulator K S Wong Office of the Telecommunications Authority Hong Kong, China.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
1 Ben Pierce, Battelle March 2, 2010 US DOT IntelliDrive SM Program.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
606 CMR 14.00: Background Record Checks What you need to know!
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Making the System Operational
ZMQS ZMQS
Gaining Senior Leadership Support for Continuity of Operations
1 WSG Oct 2005 MDSS Stakeholder Meeting Boulder, CO October 21, 2005 Road Weather Information System Environmental Sensor Station Siting Guidelines Ed.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
EMS Checklist (ISO model)
The importance of the service catalogue to the service desk
ABC Technology Project
On-Board-Unit September 10 th, Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 2 Summary User responsibility.
Information meeting – Legal framework and tendering procedure Kaat Leus September 10 th, 2012.
Road pricing Belgian Regions Market consultation information meeting September 10 th, 2012.
Road vignette for light vehicles Market consultation information meeting September 10 th, 2012.
Key Performance Indicators Market consultation information meeting September 10 th, 2012.
Contractual Structure Alain François September 10 th, 2012.
VOORBLAD.
Piedmont Regional Voice over IP Pilot Project Law Enforcement Information Management Conference Greensboro, N. C. May 21-24, 2007 Major Dean Hairston,
Checking & Corrective Action
Squares and Square Root WALK. Solve each problem REVIEW:
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
© 2012 National Heart Foundation of Australia. Slide 2.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
ENGLISH – LEVEL VI Week IV – Lesson
1. 2  One-stop reporting of landings and production to multiple agencies electronically  Increases timeliness and accuracy of fisheries data entry 
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
REGISTRATION OF STUDENTS Master Settings STUDENT INFORMATION PRABANDHAK DEFINE FEE STRUCTURE FEE COLLECTION Attendance Management REPORTS Architecture.
Week 1.
Number bonds to 10,
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
inter-regional road charging project in Belgium
Business and organization model Market consultation information meeting September 10 th, 2012.
The Roadpricing System for Germany
Toll Collection. One of the early widespread adopters of ITS Some of the most obvious benefits from ITS adoption.
Regional organization model Market Information Meeting- september 10th, Brussels.
The German GNSS Toll System on Motorways and on Main Roads
Intelligent Transportation System (ITS) ISYM 540 Current Topics in Information System Management Anas Hardan.
Tolling system for lorries in Germany Federal Ministry of Transport, Building and Housing Distance-related motorway user charges for heavy goods vehicles.
Presentation transcript:

Enforcement Market consultation information meeting September 10 th, 2012

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 2 Content Purpose of enforcement Enforcement principles Legal framework for enforcement Organization of enforcement Enforcement equipment Km Charge Road Vignette Enforcement performance

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 3 The goal of enforcement Main goal: minimization of ‘leakage’ Increase customer acceptance of the toll system Maximize rate of compliant users Identification and registration of non-payers and wrong-payers Aspects influencing leakage Perceived capture rate Level of sanctions Perceived profit of not paying Threat

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 4 System architecture Physical enforcement Complaints NB-345 Enforcement

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 5 Enforcement principles Enforcement responsibility Each Region is responsible for the public enforcement tasks within their Region. Integrated enforcement approach (kilometer charge & road vignette) Enforcement stakeholders SSP: availability and performance of operational enforcement equipment SSP: installation and transport of flexible roadside equipment SSP: documentation of violations REA (Regional enforcement authority): mobile enforcement teams REA: determination of positions of the flexible roadside equipment RASA (Regional administrative sanctioning authority): imposing administrative sanctions

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 6 Legal Framework for the Enforcement Concept Three Levels of Enforcement: 1. Violation detection 2. Voluntary Settlement (toll + “transactional sum”) 3. Administrative sanction For each level, the three regional legislators have to define and approve: Regional decree Executing decrees Entities involved and responsible in enforcement: SSP REA’s (Regional Enforcement Agency or service of each of the 3 Regions) RASA’s (public officers of each of the 3 Regions)

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 7 Enforcement Concept Belgium for KMH & e-vignette Main Components: Central System SRSE Back Office SRSEVFRSEFRSEVOBUEMVCaddy SRSE (Stationary Road Side Equipment) SRSEV (Stationary Road Side Equipment Video) FRSE (Flexible Road Side Equipment) FRSEV (Flexible Road Side Equipment) EMV (Enforcement Mobile Vehicle) OBU On-Board-Unit

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 8 Enforcement

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 9 Organization of enforcement Stationary Roadside Equipment Flexible Roadside Equipment Mobile teams Infrastructure SSP Regional personnel Back Office SSP truck registrations Fining collection coercive collection SSP Regions Fast response Belgian vignettes (EETS) user registrations SSP vignette registrations

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 10 Roadside equipment SRSEVFRSEFRSEV Roadside equipment SRSE SRSE: Stationary Roadside Equipment SRSEV: Stationary Roadside equipment Vignette FRSE: Flexible Roadside Equipment FRSEV: Flexible Roadside Equipment Vignette

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 11 SRSE (Stationary Road Side Equipment) - Function fixed installed gantries to enforce kilometre charge and road vignette video equipment with ANPR DSRC beacons for communication with OBU IR-flash for night use tbc. laser scanner fixed power connection data connection (wire or wireless) SRSE SRSEVFRSEFRSEV Example: Equipment used in Austria Roadside equipment

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 12 SRSE - Positioning of stationary enforcement stations

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 13 SRSEV (Stationary Road Side Equipment Video) - Function fixed installed equipment to enforce road vignette video equipment with ANPR IR-flash for night use Fixed power connection and fixed or wireless communication Recognition of license plates of all vehicles and compare with the data base to verify whether the vehicle has been registered or has a violation entry (kilometre charge) Example: Equipment used in London SRSEV SRSEFRSEFRSEV Roadside equipment

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 14 SRSEV - Positioning of stationary vignette enforcement stations

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 15 FRSEV & FRSE - Function Example: Equipment used in Germany FRSEV SRSESRSEV Roadside equipment FRSE

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 16 Flexible Road Side Equipment (FRSE) Functions Video, ANPR and DSRC to enforce both kilometre charge and road vignette IR-flash for night use Installable within 15 – 30 minutes by one operator Easily moveable every 4 hours 24/7 Transportable by a small transporter vehicle Data communication to back office via wireless communication Battery: 4-5 hours usage per battery circle Replacement batteries in transport vehicle

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 17 Flexible Road Side Equipment Video (FRSEV) Function Video and ANPR to enforce both road vignette and (limited) kilometre charge IR-flash for night use Installable within 15 – 30 minutes by one operator Easily moveable every 4 hours 24/7 Transportable by a small transporter vehicle Data communication to back office via wireless communication Battery: 4-5 hours usage per battery circle Replacement batteries in transport vehicle FRSEV to be used on the secondary road network or complementary to FRSE on left and middle lanes on highways

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 18 Enforcement equipment Roadside equipment Mobile enforcement teams 40 equipped vehicles Mobile teams for spot checks and through rapid response stop repeat offenders Direct communication of detected repeat offenders from SRSE(V) SSP is responsible for availability of equipment stationaryflexible Kilometer charge 40 stations (SRSE) 22 stations (FRSE) Road vignette800 stations (SRSEV)44 stations (FRSEV)

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 19 Mobile Enforcement Vehicles Equipped to enable all enforcement actions by mobile officers DSRC Video Data Communication Payment Channels On-line data base access etc. Brussels: 5 Flanders: 22 Wallonia: 13

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 20 Structure and centres for Mobile Enforcement Functional coordination Flanders Aalst Brugge Antwerp Hasselt Leuven Wallonia Liege Charleroi Arlon Brussels

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 21 Enforcement equipment KPIs 1.Detections 2.Classification 3.ANPR 4.DSRC link Of all vehicles detected by DSRC using enforcement equipment, at least 99% shall have been detected by the equipment's other functions Of all vehicles detected by DSRC using enforcement equipment, at least 80% shall be correctly classified as a vehicle liable for the kilometre charge Of all vehicles detected by DSRC using enforcement equipment, at least 95-98% shall be correctly identified by ANPR Of all vehicles identified by ANPR using enforcement equipment, the journey of which is recorded in the BO (through direct communication from the OBU), at least 99.99% shall be correctly identified through the DRSC link

Het Fairway consortium bestaat uit KPMG Advisory burg. CVBA, Eubelius burg. CVBA en Collis BV 22 Summary Road side equipment Mobile enforcement teams Flexible equipment Enforcement centre Regional officers Threat