Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink R.R.

Slides:



Advertisements
Similar presentations
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Advertisements

Federal Aviation Administration 1 Collaborative Decision Making Module 2 Developing A Collaborative Framework.
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
Ground Human Machine Interface (GHMI): trends and the future
1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL.
Total Airport Management CARE Innovative Study
Total Airport Management Systems
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A Slot Swapping Applications for CDM P.R. de Waal, NLR M.H. van den.
European ATFM From current operation towards the future Patrick Ky
Imperial College 1 Towards a Controller Pilot Collaborative Decision Making Methodology A. Majumdar, W.Y. Ochieng, J.W. Polak Centre for Transport Studies.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Architecture and institutional issues for AeroMACS.
27 June Report on two themes: Airport Management Weather & Environment by: Jan Terlouw (NLR) ATM 2003 Seminar, Budapest June 27, 2003.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A AI Planning at airports:Departure Management PLANET Industry Day.
Air Traffic Management
- European CDM - Collaborative Departures Sequencing Optimising departure sequence according to the priorities of Airline and Airport as well as Tower.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A The Transition Towards Free Flight: A Human Factors Evaluation of.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Designing for Safety: the Free Flight ATM concept Jacco Hoekstra.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Overview of NLR Free Flight project ‘97 - ‘99 Jacco Hoekstra
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Page 1 The ONESKY (Single-Sky) project and what it means for ASAS.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A The Free Flight Deck Society of Automotive Engineers (SAE) S-7, “Flight.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A “Free Flight with Airborne Separation will result in an uncontrolled,
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A “Free Flight with Airborne Separation will result in an uncontrolled,
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Free Flight with Airborne Separation will result in an uncontrolled,
Mission Trajectory Step 1 From planning to deployment.
ASAS TN 6-8 October 2003 GS applications in Kiruna A Swedish ADS-B validation site Göran Hasslar CNS/ATM Applications Systems Engineer.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Runway Incursion’s Affect on FAA Approved Pilot Training and Pilot and Flight Instructor Certification and Part 121 Pilot Checking – Andy Edwards – Manager.
The European Organisation for the Safety of Air Navigation BORYSPIL ACE & PLANNING STUDY Mariia Naumenko.
Applications from packages I to III
Sense & Avoid for UAV Systems
BNAIC, Oct, Temporal Plans and Resource Management Pieter Buzing & Cees Witteveen TU Delft.
The ATM and ASAS challenges ahead Fred Abbink NLR General Director ASAS-TN2 workshop, April 2007, NLR, Amsterdam, The Netherlands.
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
1SWIM-SUIT Public Launch – 23 April 2007 System Wide Information Management in OATA Bert Nijhof OATA Technical Manager EUROCONTROL DAS/SAS/OCA.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
SESAR Single European Sky Air traffic management Research
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH COLLABORATIVE DECISION MAKING (CDM) Testimony before the National Civil Aviation Review Commission Testimony.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
DeSIRE Workshop, Pisa, 25-26/11/2002 1/7 A Case Study in Air Traffic Control Alberto Pasquini Deep Blue Srl.
A Technology Partnership for the New Millennium Anne Harlan, Director William J. Hughes Technical Center 68th NASAO Annual Convention September 20, 1999.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Mr. Lagomarsino Money Power with Technology Applications.
Nationaal Lucht- en Ruimtevaartlaboratorium – National Aerospace Laboratory NLR Towards a paperless Air Traffic Control Tower Tanja Bos, National Aerospace.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A l Humans smarter, meaner, more strategic, emotional, variable, etc.
Report on two themes: Airport Management Weather & Environment by: Jan Terlouw (NLR) ATM 2003 Seminar, Budapest June 27, June 2003.
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
The Role of Air Traffic Control in A CDM ENVIRONMENT
SIP/2012/ASBU/Nairobi-WP/19
Ground System implication for ASAS implementation
Aviation Innovation for Regional Integration
Air Traffic Control the Netherlands
Collaborative Decision Making “Developing A Collaborative Framework”
Presentation transcript:

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink R.R. Seljée 2nd Gap-Bridging Seminar PLANSIG 2002 TU Delft 21 November 2002

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR NLR is a non-profit foundation since 1937/1919 NLR provides technical and scientific contributions to activities in aerospace related areas NLR will independently serve public and private organisations NLR

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR NLR - Civil aerospace: 65%- Military aerospace: 35% - Aeronautics: 85%- Space: 15% - Operations: 60%- Development: 40% (non-aerospace: < 2%) Turn over: 70 MEuro.

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR NLR Large Wind Tunnels (2 low speed, 2 transonic, 1 supersonic, 50% shared in DNW) Simulators (flight, air traffic control, tower) Aircraft (Fairchild Metro II, Cessna Citation II) Computing environments (supercomputer, Network, middleware)

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR NLR NLR undertakes studies and implementations for Schiphol Safety cases Policy studies Simulator trials Implementations Co-operation with Dutch Industry (HITT) TCM (Taxiway Collision Monitoring) Triple-I: Intelligence Instead of Infrastructure Co-operation with Eurocontrol

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR MADS:Departure Planning Decision Support at Airports Runway Use Advisory and Inspection Systems: BGAS & BGCS Tools for Route Planning and Manoeuvre Planning Crew Assistant is a decision support system for a pilot Mission Support System Campal (MSS/C) is a powerful tool for military mission planning Planning in Air Traffic Management (ATM): the Big Picture Projects with AI Planning and Scheduling

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR ATM Planning: the Problem

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR Artificial Intelligence and Planning The traffic increase gives the operational need Problem not recognised by controllers (the end users) Academia wants to experiment new techniques Academia wants complex methods for operator modelling S ide effects: Establishing better collaboration Acceptance of new technology in an organisation Studying other solutions, e.g. use trains in case of Air Traffic Growth

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR The Problem: Division of ATM Arrival management Departure management Surface movement Stand allocation Flight management

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR The Problem: Many Actors Many actors involved: Airlines/AOC Pilots Air Traffic Controllers En-route ATC Approach ATC ATC Departure/Tower Other Airports ATC Apron Controllers Ground Movement Controllers CFMU Meteo Service Providers

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR Each airport is different but the same

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR Airport traffic management control loop Guidance control surveillance aircraft planning

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR Collaborate Decision Making (CDM)

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR How from FCFS to planning RESEARCH planning more advanced technology talk to operators increase efficiency OPERATORS first heard first served conservative (safety) no time / no interest one aircraft vs cowboys The GAP

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR How to bridge this gap? Start with foundations of the bridge Finances Interest from operators prototypes

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR Foundation: finances Contributions from research (NLR itself) Contributions from subsidiary projects (EC) Contributions from Eurocontrol Where is industry to subsidise this work?

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR Foundation: interest Make operators aware of their problem Make operators aware of solutions Convince operators that they will not be replaced (by automation) Convince operators of new challenges Convince airport managers of the need

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR Foundation: prototypes Build realistic prototypes Give operators the possibility to interact Large simulators, with controller-n-the-loop

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR The bridge Integration projects Demonstrations Emotional response to new things must be broken => give the operator a “positive feeling” about our work

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR Where is industry? Industry is waiting for results (to sell) Operators are waiting (if at all)...

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR NLR work to demonstrate to planners Introduce a planning and scheduling function at airports for scheduling traffic and assist traffic controllers Evaluate the use and benefit of the tool We build a planner with constraint reasoning (ILOG Solver and Scheduler) Symbolic representation of the problem based on the “flight”abject Constraints: separation, meteo, runway length, traffic distribution,...

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR Simplified model runway assignment runway SID structure 2 min. 5 min. exit A runway holdingA 2 min. 5 min. intersection take-off take-off time (sequences) SID allocation

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR HMI

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR The result of our work Operators start to understand the idea of planning Operators are willing to express their knowledge Industry has been invited to participate and show their operational products (radars and HMIs) Industry was invited for a “picnic day” => We brought industry in contact with end users

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR And further... More experiments in our tower simulator More demonstrations in real control towers Bring results to airport decision makers (presentations) Bring results to industry (software and design) … and sell it!

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR Questions ?