Knowledge requirements for rolling stock maintenance TU Eindhoven – 19th of June 2007 by Bob Huisman NedTrain - Fleet Management.

Slides:



Advertisements
Similar presentations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Railcar 101 The Basics of Railcars: Car Types, Components and Rules
Advanced Piloting Cruise Plot.
Operations Management Maintenance and Reliability Chapter 17
Copyright © 2002 Pearson Education, Inc. Slide 1.
Copyright © 2002 Pearson Education, Inc. Slide 1.
Inventory Systems for Dependent Demand
Operations Scheduling
10-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Membership & Roster Maintenance September 2013 ASTM Officers.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
RECORD KEEPING Cooperative Development of Operational
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 Introduction to Transportation Systems. 2 PART I: CONTEXT, CONCEPTS AND CHARACTERIZATI ON.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
Jeremy Siviter, IBI Group, Project Manager May 18th, 2011
ABC Technology Project
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Understanding Pricing 13.
Chapter foundations of Chapter M A R K E T I N G Understanding Pricing 13.
Galit Haim, Ya'akov Gal, Sarit Kraus and Michele J. Gelfand A Cultural Sensitive Agent for Human-Computer Negotiation 1.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Squares and Square Root WALK. Solve each problem REVIEW:
Do you have the Maths Factor?. Maths Can you beat this term’s Maths Challenge?
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Chapter 11 Software Evolution
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Synchronous Technology A Perspective from a User and CAD Manager Scott Wertel, P.E. Principal Wertel Enterprises, LLC
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
From ILL to online ordering? An improved service for OCLC and British Library users Katie Birch – OCLC Samantha Tillett – British Library.
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
A SMALL TRUTH TO MAKE LIFE 100%
PSSA Preparation.
How Cells Obtain Energy from Food
Traktor- og motorlære Kapitel 1 1 Kopiering forbudt.
Presentation transcript:

Knowledge requirements for rolling stock maintenance TU Eindhoven – 19th of June 2007 by Bob Huisman NedTrain - Fleet Management Strategic Development

Pagina 2TU Eindhoven - 19th of June 2007 NedTrain is part of the NS Group NedTrain provides Rolling Stock Maintenance, Cleaning and Overhauling

Pagina 3TU Eindhoven - 19th of June 2007 Questions & Challenges 1.How to preserve knowledge and experience? Older people retire, but older systems (should) remain operational. 2.How to obtain knowledge about reliable complex technical systems? Configuration, condition, use, contracts, performance? What should be done and when? How? Better system performance means less diagnostic experience! 3.How to share knowledge in a highly flexible organisation? How to deal with different systems over time, at different locations? 4.How to exchange knowledge between companies across borders? Many companies are involved in the life time of a technical system. How to communicate between different local (national) cultures?

Pagina 4TU Eindhoven - 19th of June 2007 Double goal: effectiveness and efficiency

Pagina 5TU Eindhoven - 19th of June 2007 Goal 1: to maintain system functionality (effectiveness) 100% Time YesterdayTodayTomorrow? How do functions evolute?When is a functional failure to be expected? What maintenance is required? When?

Pagina 6TU Eindhoven - 19th of June 2007 Goal 2: to minimize means of production (efficiency) 100% Fleet availability Use of maintenance means of production Past Future

Pagina 7TU Eindhoven - 19th of June 2007 Effective maintenance: derive required maintenance from technical condition of individual systems by intelligent reasoning

Pagina 8TU Eindhoven - 19th of June 2007 Component Function Use How to predict degradation and failure? 100% Time New Time Functionality Dimension, quantity - Time Cycles, energy Now influences technical condition enables/disables function Extrapolation Cause-effect analysis Wear and tear modelling

Pagina 9TU Eindhoven - 19th of June 2007 Component 1Component 2Component 3Component 4 Function AFunction BFunction CFunction D UsageIncidents EnvironmentMaintenance Technical system Complex interaction between use, components and functions

Pagina 10TU Eindhoven - 19th of June 2007 Computer system Predictive model (not perfect) Predictive model (not perfect) Mimic model (not perfect) Mimic model (not perfect) Technical system Mimic model (not perfect) Maintainer Observer and interpretator Jobs Technical status Derive required maintenance continuously during operation Measurement Synchronisation Predictive model (not perfect) Expected status Required Maintenance Maintenance plan Maintenance rules and job descriptions Knowledge Configuration Design, Requirements, Environment, Use Configuration Expected use

Pagina 11TU Eindhoven - 19th of June 2007 Efficient maintenance: derive maintenance schedule from required maintenance and availability of means of production by intelligent reasoning and negotiation

Pagina 12TU Eindhoven - 19th of June 2007 Manufacturing Supplier Backwards scheduling (Pull) Delivery date Quantity Design Quality Price Order Production & Delivery orders Scheduling manufacturing orders New products

Pagina 13TU Eindhoven - 19th of June 2007 Maintenance production Supplier Maintenance plan Throughput Quality Price Contract Scheduling (Push) km-counter Local scheduling Technical condition Production order Traditional rolling stock maintenance scheduling Maintained products Arrival & Inspection orders

Pagina 14TU Eindhoven - 19th of June 2007 Technical condition Required maintenance Maintenance schedule Maintenance planTransport operations Required staff, shop and stock Availability of staff, shop and stock Future maintenance scheduling

Pagina 15TU Eindhoven - 19th of June 2007 Maintenance production Supplier Backwards scheduling (Pull) Technical condition Production & Delivery orders Generate maintenance required Maintenance plan Throughput Quality Price Contract Request Rolling stock condition based maintenance scheduling Maintained products

Pagina 16TU Eindhoven - 19th of June 2007 Depot Train Agent (depot ) Agent (train ) Agent (train ) Train Intelligent agent (train ) DepotOperator Intelligent agent (operator ) Intelligent agent (depot ) Configuration Maintenance rules Time table StatusAvailability Work ordersTransport orders Co-ordinationNegotiation Maintenance scheduling by a Multi Agent System (Society)

Pagina 17TU Eindhoven - 19th of June 2007 Where do we need knowledge of operation? Tactical (Maintenance Plans, Means of Production, Organisation) Operational (Maintenance Planning and Control) Depot / Workshop (Performing Maintenance) Technical Condition of Rolling Stock Diagnostic Data Operation Data Inspection and Maintenance Orders Maintenance Plans Performance Requirements Performance of Rolling Stock and Maintenance Results Fleet Performance Trains Strategic (Rolling Stock, Locations, Contracts) Trains Railway Operators Government, Authorities Infrastructure Managers Traffic Control Rolling Stock Manufactures

Pagina 18TU Eindhoven - 19th of June 2007 Thanks for Your Attention! Any questions?

Pagina 19TU Eindhoven - 19th of June 2007 Train Coach Boogie MotorWheel set Consists of Is part of Subsystem Component tree

Pagina 20TU Eindhoven - 19th of June 2007 To transport passengers To drive To offer comfort To remain on track To accelerate To offer seats To control climate To decelerate Function tree To inform Requires

Pagina 21TU Eindhoven - 19th of June 2007 To transport passengers To drive To remain on track To accelerate Train Boogie Wheel setMotor Energy supply Relations between functions and components

Pagina 22TU Eindhoven - 19th of June 2007 Triple valve leaks, caused by dirt Air pressure drops, coach does not brake, causing lower train deceleration Train at 140 km/h does not stop within 1000m Failure does effect safety directly Frequent test of brake system Enable train driver to brake and to stop Function Root failure Failure effect Functional failure Business consequence Maintenance RCM (Reliability-Centred Maintenance) analysis

Pagina 23TU Eindhoven - 19th of June 2007 Function Functional failure Failure effect Root failure Functional failure Failure effect Root failure Function Functional failure Failure effect Root failure Functional failure Failure effect Root failure Complex cause-effect relations

Pagina 24TU Eindhoven - 19th of June 2007 Design of Technical system Maintenance engineering Maintenance plan Technical system Construction Requirements, Environment, Use Real life Expected conditions and use Phase 1 Phase 2 Phase 3 System design, maintenance engineering and operation

Pagina 25TU Eindhoven - 19th of June 2007 Implementation model

Pagina 26TU Eindhoven - 19th of June 2007 Ontologies en RDF