Allocating Capacity and Costs of New Transmission November 7, 2007 Portland, OR.

Slides:



Advertisements
Similar presentations
Mountain States Transmission Intertie (MSTI) Open Season Update Meeting Mountain States Transmission Intertie (MSTI) Open Season Update Meeting Wednesday,
Advertisements

Establishing a Fund with the IEEE Foundation. IEEE Foundation Mission Cultivate relationships and resources to advance IEEE's core purpose to foster technological.
DRAFT Recommendation Preemption & Competition CHALLENGER COUNTEROFFER June 25, 2013 NAESB OS.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
NTTG Report to TEPPC BiennialTransmission Plan.
Energy Policy Act of 2005 Section 1221 & 368 Update Board Meeting – Los Cabos, Mexico December 7 & 8, 2006.
1 1  1 =.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
1 1 SPP Credit Policy Tutorial Revised – August 20, 2010.
California Competes Tax Credit Workshop Presented by: Grace Arupo-Rodriguez, Deputy Director of Legal Affairs for GO-Biz Will Koch, Deputy Director of.
MIG 5 – Recreation Study Plan Review April 2, 2008.
Open Season MT to Idaho Calendar of Events Posted on NWE OASIS September 30, 2004 (Slide 8 updated 2/28/05)
1 Proposed Rulemaking to Implement Provisions of the Federal Clean Air Interstate Rule Environmental Quality Board Meeting Harrisburg, PA February 20,
Update on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Market Interface Committee March 25, 2014 Jim Price, Senior Advisor, Market Development.
Generation Use of System Charges Nigel Turvey. Background Regulatory incentive allows: Recovery of a percentage of any reinforcement costs A value per.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
OCD Internal and Education and Training Purposes Only A New Approach for You to Create Broader, Long-term Customer Engagements CL12092.
10b.1 Van Horne and Wachowicz, Fundamentals of Financial Management, 13th edition. © Pearson Education Limited Created by Gregory Kuhlemeyer. Chapter.
Fundamentals of Cost Analysis for Decision Making
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
1 Open Stakeholder Meeting May 23, 2007 Salt Lake City, Utah “To ensure efficient, effective, coordinated use & expansion of the member’s transmission.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, November 5, :00 to 3:00 p.m. EST.
Montana Energy Summit Transmission Planning Process April 22, 2008.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
What’s New in Southern Companies’ OATT Southern Company Transmission 2008 Customer Forum.
EPLC Deliverables Sherry Brown-Scoggins & Wanda Hall
NTTG 0rder 1000 Stakeholder Meeting March 28, 2012 Radisson Hotel Portland, Oregon 1.
Montana Ambassadors Helena, Montana February 25, 2011.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Considering the Costs of MUS Interventions. Direct Costs v. Opportunity Costs Direct Costs Expenditures and investments to achieve a particular outcome.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Short-term Competition and Preemption (STCP) May 2015 Presenter: Marie Pompel Bonneville Power Administration.
1  The IPM model projects increases in electricity prices as a result of the RGGI policy scenarios which, by themselves, would increase the household.
Lyle D. Larson Balch & Bingham LLP Coalition for Fair Transmission Policy Governors’ Wind Energy Coalition Governors’ Staff Transmission Briefing November.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Transmission Planning Informational Workshop Montpelier, VT September 19, 2005 Allocating the Cost of New Transmission in New England Stephen J. Rourke.
October 6, 2006 Public Stakeholder Review Portland, Oregon Conditional Firm.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
Forming a Cost Assignment/ Cost Recovery Team RMATS Steering Committee January 13, 2004.
Proposed Analytical Approach - Modeling Phase 3 - Formation of new team December 9, 2003 Steering Committee Presentation.
Sixth Northwest Conservation & Electric Power Plan CHP in the Sixth Plan?? Jeff King Northwest Power and Conservation Council Generating Resources Advisory.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional.
New Large Single Loads and Economic Development Considerations Draft Assessment.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
Review of 2016–2021 Strategic Budget Plan Development Process and 2016 Budget Assumptions Financial Administration and Audit Committee April 14,
Keith Brown Origin SA FCAS Stage 1 dispute. Stage 1 dispute 2 Origin has commenced a ‘stage 1’ dispute with AEMO relating to AEMO’s basis of allocating.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
Open Access Transmission Tariff Amendment No. 9 Greg Broeking, Chief Financial Officer March 7, 2012.
Transmission Planning Attachment K Public Input Meeting
2017 Integrated Resource Plan
Rates & Regulatory Updates
Energy Storage Study PPRAC Meeting May 17, 2017.
CBP Biennial Strategy Review System ~Meetings Detail~ DRAFT August 29, /6/2018 DRAFT.
Short-term Competition and Preemption (STCP)
Duke Energy Carolinas Quarterly Stakeholder Meeting
Energy Storage Study PPRAC Meeting May 17, 2017.
Charging For Active Network Management / Flexible Connections
Presentation transcript:

Allocating Capacity and Costs of New Transmission November 7, 2007 Portland, OR

22 Agenda Purpose - Discuss Cost Allocation and Cost Recovery of New Transmission Projects Cost Allocation – Rich Bayless Cost Recovery – Ron Schellberg –Expected Project Costs –FERC higher of methodology –Incremental Pricing Models –Rollover Rights Transmission Provider Practices General Discussion

33 Cost Allocation Principles 1.Cost Causers are Cost Bearers; Beneficiaries pay reflective of benefits received. 2.Projects comply with state and federal policy and developers identify the intended purpose or resource portfolio the transmission project applies to relative to such. 3.Allocation results in reasonable opportunity for full cost recovery but no more –Cost Allocation based on distribution of benefits –Customer or TP accepts responsibility for associated costs; project causes no harm or uncompensated adverse impact. 4.For solely wholesale transmission, wholesale customers pay

4 NTTG Planning Process 5. NTTG Steering Committee Plan Approval 2.Expansion Plan & Projects With Benefits Parsed 3. Cost Allocation Committee Applies Principles & Recommends Likely Cost Allocation 1.Bienniall NTTG Planning Process: Identify Needs, Least Cost Expansion Project Alternatives, Technical Benefits, Project Costs 4. Draft Biennial Expansion Plan 6. Final Biennial Plan: Includes Likely Cost & Benefit Allocation Estimates given Planning Assumptions 7. TP considers Final Biennial Plan for incorporation into Final TP Transmission Plan Approved Customer & Stakeholder Input TP Local Planning process inputs Finalization of TP Transmission Plan

5 Cost Allocation Process Project Developers and Planning Committee prepare info package for CAC –Description and purpose –Expected benefits, risks, and costs Technical and economic –Proposed Cost Allocation and Recovery –Any pertinent analysis –Other CAC iterates with PC process and analysis. Open process and stakeholder input CAC examines and determines distribution of benefits/risks Upon reaching agreement, CAC recommends estimate of cost allocation for final Biennial Plan Report to Steering Committee CAC and PC receive and monitor updated info from developers during biennial cycle

66 Cost Recovery Expected Project Costs –Bridger to Northwest (710 Miles) 190 Miles – Bridger-Populus 270 Miles – Populus-Hemingway 250 Miles – Hemingway-Northwest –For this cost recovery discussion assume: 1000 MW Capacity $1,000,000,000 Project Cost –Results in: $1000/kW or approximately $180/kW-year

77 Cost Recovery FERC higher of methodology –Charge embedded rolled-in rate or incremental rate. Current PTP rates: Idaho Power ~ $20/kW-year Northwestern ~ $40/kW-year PacifiCorp ~ $25/kW-year –Bridger-Northwest costs well exceed current embedded rates

88 Cost Recovery Incremental Pricing Model –Assuming 40+ year deprecation rate –Rate Base +$1,000,000,000 –Return, additional ~$120,000,000/year –O&M, additional ~$60,000,000/year –Total, additional $180,000,000/year Requests of shorter duration would cause annual cost recovery to increase.

99 Policies Transmission Provider Policies –PacifiCorp –Idaho Power –Northwestern

10 General Discussion Cost Allocation Cost Recovery Transmission Provider Policies