RSRDC UNIT- Quality Control, Jaipur

Slides:



Advertisements
Similar presentations
Material Selection Central Office Hydraulics
Advertisements

Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
Barhale Procedure for Site Establishment
CONTRACT COSTING Contract costing is that form specific order costing which applies where the work is undertaken according to customer’s requirements and.
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
SHOTCRETING K.V.SUBBA RAO.
INITIATIVES, REFERENDA AND RECALLS This PowerPoint Covers:
INTRODUCTION We would like to introduce our Company AURA METLAB PRIVATE LIMITED (Laboratory Equipment’s Suppliers); We deal with High Quality Material.
Tolerances and Price Impacts Presented by:- Er. Bhagawan Shrestha.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
RSRDC UNIT- II, AJMER.
Peer Review - Overview DEB KAZMERZAK, IOWA PCA ACKNOWLEDGEMENT: LINDA RUBLE, PA/NP, PCA CLINICAL CONSULTANT.
Aggregates, Cement and Concrete MSE 220 Spring, 2009.
Testing of Cement.
INSPECTION AND ITS EFFECTIVENESS PREAMBLE:  Inspections are important to get exact, current field data.  Periodical inspections are called schedules.
Inspection, Quality, Variation, Statistical Control and Acceptance Criteria Dr. J.SUDHAKUMAR Assistant Professor Department of Civil Engg. NIT, CALICUT.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
VOLUMETRIC MIXED CONCRETE MOBILE VOLUMETRIC MIXERS.
Quality Control Testing
2002 FDOT/FTBA Construction Conference
Concrete Dry Quantities examples in class Week 3.
Property Custodian Meeting July 10, Review of USM Internal Auditor Findings  Excerpt from the USM Internal Auditors report dated May 31, 2012:
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
GOR thrust on Urban Health Towards Improved access to quality health services for Urban Poor.
Staff Assessment Studies Problems faced in examination of Hospital Studies
C OMPANIES ACT,2013 CA. Arun Saxena Saxena & Saxena Chartered Accountants 811, Ansal Bhawan 16, Kasturba Gandhi Marg, New Delhi – Mob.:
Statutory Audit of SSA Accounts for A PROGRAMME FOR UNIVERSAL ELEMENTARY EDUCATION MANUAL ON FINANCIAL MANAGEMENT AND PROCUREMENT Ministry of Human.
ACI Concrete Mix Design
RajCOMP Info Services Ltd. Rajasthan State Wide Area Network (RajSWAN) June 2, 2011.
RSRDC UNIT- III JAIPUR. ORGANISATION CHART RE Sh. A.M. Khan ARE Sh. Rajesh Gupta ARE Sh. S.K. Chejara ARE Sh. V.B. Mathur ARE Sh. Rakeev Gupta JEN Smt.
WELCOME Bhama Consultancy Services , Pune START.
C OMPANIES ACT,2013 Adv. Arun Saxena Saxena & Saxena Law Chambers Advocates & Attorneys , New Delhi House 27, Barakhamba Road, New Delhi –
RSRDC UNIT - KOTA. ORGANISATION CHART OF RSRDC - UNIT KOTA.
1 National Minorities Development & Finance Corporation N M D F C Grant-In-Aid Scheme for Strengthening of SCAs of NMDFC.
QUALITY CONTROL OF CONSTRUCTION MATERIALS by K. RAMESH Research Officer, Engineering Materials Laboratory, A.P. Engineering Research Laboratories, Himayatsagar,
ORGANISATION CHART OF RSRDC UNIT-GURGAON RE SH. SUKESH MATHUR ARE SH. UMESH KUMAR GARG ARE SH. J.M. MITTAL ARE SH. R.D. MEENA ACCOUNTANT SH. SANT LAL.
Institutional arrangement for energy statistics in India D. Sahoo Dy. Director General Central Statistical Organization, India.
Concrete Weight Coating Plant “Aladja”
1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.
C OMPANIES ACT,2013 CA. Arun Saxena Saxena & Saxena Chartered Accountants 811, Ansal Bhawan 16, Kasturba Gandhi Marg, New Delhi – Mob.:
ENGINEER Engineer Duties: Carry out the duties assigned in the contract.Carry out the duties assigned in the contract. Engineer's staff shall include qualified.
Necessary Information Required compressive strength at 28days: 30 Mpa Type of structure: mass concrete, beam, column. Maximum size of aggregate: 20 mm.
QUALITY CONTROL TESTS FOR VARIOUS LAYERS OF FLEXIBLE PAVEMENTS
DCS-1 PPT Submitted By- Amandeep Singh Roll No
ER. HIRALAL AGRAWAL EXECUTIVE ENGINEER.  Used for determining the Abrasion/LA value of aggregates.  This machine is for determining the resistance to.
Er. Hiralal Agrawal EXECUTIVE ENGINEER.. Apparatus:  Concrete cube moulds of 15 cm size in required numbers.  Standard tamping bar (steel) of 16mm diameter.
Submitted By- Amandeep Singh Roll No
Advisor, IDS Cell1 NEGOTIATIONS G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell Monday, July 11, 2005.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
 Experimental Part.  Data Collection and Analysis.  Conclusions and Recommendations.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Objectives of Design of Reinforced Concrete Elements
Internal Safety Organisation (ISO)
Feasibility Study to Evaluate Brick Aggregates and Foam Bitumen treated RAP for Pavement Design and Construction of NH-44 in Tripura.
REPAIR AND REHABILITATION OF STRUCTURES
Bangkok Metropolitan Administration’s activities to control air quality 1.
WORKABILITY TESTS OF CONCRETE
G.GUNA….SRVEC DEPARTMENT OF CIVIL ENGINEERING
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Construction Management
P04d – Non-Police Personnel Vetting
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
CONCRETE MIX DESIGN PRACTICE OF ETHIOPIA AND ITS APPLICATION ON CONSTRUCTION SITES Presented by: Adiamseged Eyassu WORKSHOP ON CONCRETE CONSTRUCTION PRACTICES.
Election Department Rajasthan
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
International Standards and Contemporary Technologies,
Presentation transcript:

RSRDC UNIT- Quality Control, Jaipur

ORGANISATION CHART OF RSRDC UNIT- Quality Control, Jaipur

PREFACE RSRDC executing various important building and road works in Rajasthan, Delhi, Chandigarh and trying to get major works in other states. The works are to be carried out as per approved specifications and these specifications are to be checked time to time by performing Quality Control tests in field laboratories at site and other approved laboratories as per codal provisions. Therefore Quality Control is a main activity during execution of works and good presentation of Quality Control measures has become a necessary part of work. At present field laboratories are working at all sites as per requirement of the work and there is a central laboratory at head office level where time to time Quality Control tests are being performed.

COMPRESSIVE STRENGTH TESTING MACHINE FOR CONCRETE

COMPRESSIVE STRENGTH TESTING MACHINE FOR MORTAR

IMPACT TESTING MACHINE

ELECTRIC OVEN

SLUMP TEST CONE

SAND REPLACEMENT MATHOD APPARATUS FOR DENSITY

GI SIEVE SET FOR GRADATION OF COARSE AGGRGATE

BRASS SIEVE SET FOR GRADATION OF FINE AGGRGATE

AT A GLANCE At present one Resident Engineer & one Assistant Resident Engineer are working in the Quality Control unit, Jaipur. Further provision of three Assistant Resident Engineers is taken for smooth working at different locations i.e Jodhpur, Kota & Bharatpur to cover all Rajasthan.

LOCATION MAP OF UNITS WITH PROPOSED ARE(QC) Dwarka Alwar Bharatpur Baran Jhalawar Unit Proposed ARE(QC) ARE(QC) Present

INSPECTIONS Time to time inspection of works is being carried out by Quality Control team headed by R.E. (Q.C.) in which Quality Control records are checked and due test are also performed at site in presence of Q.C. team. M.D, G.M/ C.P.M, S.E’s inspect the works and get performed the Quality Control test checks during their inspections at works. The Quality Control tests which cannot be performed either at field laboratory or at central laboratory H.O, RE (Q.C.) may get performed the test from any approved laboratory and the payment of the test will be made by RE Unit- II, Jaipur. after due verification of bill and chargeable head by RE (Q.C.)

Compressive strength testing of Concrete cubes at Medical College, Unit – II, Jhalawar

Gradation Test of Coarse Aggregates at Medical College, Unit – II, Jhalawar

Compressive strength testing of Mortar cubes at Medical College, Unit – II, Jhalawar

View of Field Laboratory Equipments at 280 bedded Hospital Unit – I, Jhalawar

Compressive strength testing of Mortar cubes at GAD Quarters, Unit – II, Jhalawar

Checking the Door Frame thickness at GAD Quarters, Unit – II, Jhalawar

Compressive strength testing of Concrete cubes at Police Quarters, Shastri Nagar, Jaipur

Compressive strength testing of Mortar cubes at Police Quarters, Shastri Nagar, Jaipur

Compressive strength testing of Concrete cubes at Police Quarters, Chainpura, Jaipur

Weight Measuring of T-Angle Iron at Police Quarters, Chainpura, Jaipur

Compressive Strength Measuring Equipments at ROB (L/C No. 463) Dholpur

Gradation Test of Coarse Aggregates at Police Quarters, Ajmer

METHODOLOGY RSRDC has circulated the two formats of Quality Control tests and Resident Engineers have been directed to send the information's fortnightly to Head office. Resident Engineers have been directed to link the quality control results with payments. If there is any discrepancy found in the results obtained at site and standards of ISI, the work shall be accepted/rejected accordingly. Guidelines for Quality Control measures in field laboratories have been issued.

FUTURE PLAN A manual for Quality Control tests in field laboratories is being prepared in which all information's regarding Frequency, Specifications, Apparatus, Method of tests etc. being collected from different related I.S. codes and after compilation will be kept at one place. Observation sheets for all field tests are being prepared and will be circulated for similarity in all units. A work shop on Quality Control tests is being arranged to update the Engineers.

PROPOSED NORMS OF QUALITY CONTROL TESTS Resident Engineer (concerned) – All works in his jurisdiction. Superintending Engineer – All works in his jurisdiction. General Manager/Chief Project Manager –A&F of Rs. 200 lacs and above. Managing Director –A&F of Rs. 500 lacs and above. RE (Q.C.) –A&F of Rs. 100 lacs and above. Managing Director have discretionary power to direct any officer to conduct Q.C. test of any work.

Norms of Laboratory equipments to be provided by contractor For works costing up to Rs. 25.00 lacs. Sieve set for fine and coarse aggregates. Cube moulds for cement mortar and concrete. For works costing Rs. 25.00 lacs to 50.00 lacs. Same as above Cube testing machine for cement mortar cubes. For works costing Rs. 50.00 lacs to 75.00 lacs. Cube testing machine for cement concrete cubes. For works costing Rs. 75.00 lacs and above. Same as above with complete field laboratory setup.

THANKS