PRIMARY GOAL TO ENHANCE CUSTOMER SATISFACTION BY MEETING CUSTOMER REQUIREMENT. WE BELIEVE THE RIGHT PROCESS WILL PRODUCE THE RIGHT RESULTS.
Quality Organization Chart General Manager QA Manager Supervisors Leaders c Prdct safety fabric finishing In-house cutting printing sewing accessories Embr. In-line Nd cntrl washing endline Pull test 100%chk ironing Meas. detector Pre final
inspection of color shade - 5 rolls each dye lots. Shade band 1 FABRIC INSPECTION 10% base on 4 pts system Fab inspection 2 inspection of color shade - 5 rolls each dye lots. Shade band 3 Comparing of neck rib to body all dye lots Thank you and again, welcome to Chutex Mock up 4 Fabric weight testing 100% of all the rolls Fabric weight
CUTTING INSPECTION PAPER PATTERN VS. CUT PANEL Thank you and again, welcome to Chutex
SEWING INSPECTION Roving QC in-line audit = 2.5 AQL Flag - defects traffic system 100% pre-wash inspection
QC WORK FLOW CHART AFTER WASH Thank you and again, welcome to Chutex
QC WORK FLOW IN PACKING SECTION SHADE SEGREGATION BEFORE PACKING PRE FINAL 10% OF TOTAL PACK PER DAY INTERNAL PRE FINAL INSPECTION 80% PACK BY IN HOUSE QC FINAL INSPECTION- BUYER
PRODUCT SAFETY POLICIES 1) Blue light to alert the safety officer 2) Magnetic bar to search for the missing fragment Thank you and again, welcome to Chutex 3) Hand held detector.
BROKEN NEEDLES Thank you and again, welcome to Chutex
Scissors Daily Inspection SCISSORS IN PRODN LINE Thank you and again, welcome to Chutex Scissors Daily Inspection
100% check on needle detector Thank you and again, welcome to Chutex 100% check on needle detector
QUALITY ANALYSIS DAILY DEFECTS RATE ANALY SIS WEEKLY MONTHLY QUARTERLY YEARLY OQL – OBSERVATION QUALITY LEVEL FROM BUYERS FINAL INSPECTION RESULT MONTHLY YEARLY
1st WEEK LINE % QC LEADER SEWING SUP Highest 31 6.1% Hương Ms. Chu NCJDFHDFJ 1st WEEK LINE % QC LEADER SEWING SUP Highest 31 6.1% Hương Ms. Chu Lowest 27 2.1% Tuyến Hà Mĩn