DQ MEPRS Audit Readiness DQ – Where We Stand RE-T-3-B 2012 Navy Medicine Audit Readiness Training Symposium.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

New for FY13 Discussion on DQMC and MEPRS Changes
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AP STUDY SESSION 2.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
1 The Blue Café by Chris Rea My world is miles of endless roads.
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Note to the teacher: Was 28. A. to B. you C. said D. on Note to the teacher: Make this slide correct answer be C and sound to be “said”. to said you on.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
DQ MEPRS Audit Readiness MEWACS Analysis RE-T-3-E 2012 Navy Medicine Audit Readiness Training Symposium.
Presentation transcript:

DQ MEPRS Audit Readiness DQ – Where We Stand RE-T-3-B 2012 Navy Medicine Audit Readiness Training Symposium

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 2 Context: Demonstrate the DQMC Metric Results at the Service Level. Purpose: Provide audience an understanding of the impact of the MTF reporting to the Service performance metrics. Outcome: Engage audience in sharing local initiatives that impact results.

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 3 End of Day Processing

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 4 Outpatient Coding (3 Business Days)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 5 APV Coding (15 Days)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 6 Inpatient Coding (30 Days)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 7 Financial Reconciliation

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 8 MEWACS

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 9 DMHRSi Submitted Time Cards

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 10 DMHRSi Approved Time Cards

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 11 EAS Transmission (45 Days)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 12 SIDR Transmission (5 th Business Day)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 13 WWR Transmission (10 th Calendar Day)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 14 CAPER Transmission (Daily)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 15 Patient Appointment File Transmission (Weekly)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 16 Inpatient Coding Audit - DRG

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 17 IPSR Audit – E&M

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 18 IPSR Coding Audit – ICD

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 19 IPSR Coding Audit – CPT

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 20 Outpatient Coding Audit-Document Availability

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 21 Outpatient Coding Audit–E&M

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 22 Outpatient Coding Audit–ICD

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 23 Outpatient Coding Audit–CPT

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 24 APV Coding Audit–Document Availability

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 25 APV Coding Audit–ICD

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 26 APV Coding Audit–CPT

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 27 DD 2569 Complete/Current (Inpatient)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 28 DD 2569 Correct in CHCS (Inpatient)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 29 DD 2569 Complete/Current (Outpatient)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 30 DD 2569 Correct in CHCS (Outpatient)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 31 DD 2569 Complete/Current (APV)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 32 DD 2569 Correct in CHCS (APV)

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 33 Workload – CAPER/Kept Appointments

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 34 Workload – SIDR/WWR Dispositions

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 35 Workload – MEPRS Visits/Kept Appointment

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 36 Workload – MEPRS/WWR Dispositions

DQ MEPRS Audit Readiness Workload – IPSR CAPER/WWR FOR OFFICIAL USE ONLY 37

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 38 Commander Involvement

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 39 Overall Rankings (FY12) NavyArmyAir ForceJTF Billing (8)2143 CO (11)1111 Coding (5,6,7)4231 Coding Timeliness (2)2134 EAS Processing (3)1223 EOD (1)2113 Transmissions (4)1243 Workload (9)2134 Grand Total (All)2134

DQ MEPRS Audit Readiness Colleen Rees, Randy Van Nostrand, , ext. 602 Kate Burchess, ext. Bonnie Rehbein, ext. FOR OFFICIAL USE ONLY 40 Points of Contact

DQ MEPRS Audit Readiness FOR OFFICIAL USE ONLY 41 Questions