2011 Strategic Review - The Inventory Analysis 2011 Strategic Review – NLWS/LLWR/16.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
1
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 4 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 3 CPUs.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
Addition Facts
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Bright Futures Guidelines Priorities and Screening Tables
Bellwork Do the following problem on a ½ sheet of paper and turn in.
2 |SharePoint Saturday New York City
© S Haughton more than 3?
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
LA LLW Arisings and Capacity Analysis Nuleaf Radioactive Waste Planning Seminar 12 th March 2013 David Rossiter Head of National Programme LLW Repository.
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
How Cells Obtain Energy from Food
Energy Generation in Mitochondria and Chlorplasts
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
NuLEAF Seminar Developing the Evidence Base – LLW arisings and the need for management facilities 22 nd March 2011 Mervin McMinn – National Waste Inventory.
Presentation transcript:

2011 Strategic Review - The Inventory Analysis 2011 Strategic Review – NLWS/LLWR/16

Figure 3 – Cumulative Forecast Raw Arisings of UK LLW and VLLW

2011 Strategic Review – NLWS/LLWR/16 Figure 4 – Annual Raw Arisings of UK LLW and VLLW

2011 Strategic Review – NLWS/LLWR/16 Figure 5 – Raw Waste Arisings of UK LLW and VLLW by Waste Producer (m3)

2011 Strategic Review – NLWS/LLWR/16 Figure 6 – Raw Waste Arisings of UK LLW by Waste Producer (m3)

2011 Strategic Review – NLWS/LLWR/16 Figure 7 – Raw Waste Arisings of UK VLLW by Waste Producer (m3)

2011 Strategic Review – NLWS/LLWR/16 Figure 8 – Material Proportions in Raw LLW arisings between 2010 and 2120 (te)

2011 Strategic Review – NLWS/LLWR/16 Figure 9 – Raw LLW Materials Arisings by Time Period (te)

2011 Strategic Review – NLWS/LLWR/16 Figure 10 – Material Proportions in Raw VLLW between 2010 and 2120 (te)

2011 Strategic Review – NLWS/LLWR/16 Figure 11 – Raw VLLW Materials Arisings by Time Period (te)

2011 Strategic Review – NLWS/LLWR/16 Figure 12 – Activity Distribution of LLW and VLLW Volumes

2011 Strategic Review – NLWS/LLWR/16 Figure 13 – 10 Year UK Regional Distribution of Raw LLW and VLLW ( )

2011 Strategic Review – NLWS/LLWR/16 Figure 14 – 110 Year UK Regional Distribution of Raw LLW and VLLW ( )

2011 Strategic Review – NLWS/LLWR/16 Figure 16 – Actual Container Receipts at the LLW Repository since 2005/2006 FY

2011 Strategic Review – NLWS/LLWR/16 Figure 17 – Packaged Volume Receipts at the LLW Repository since 2005

2011 Strategic Review – NLWS/LLWR/16 Figure 18 – Activity Distribution of Historic Disposals

2011 Strategic Review – NLWS/LLWR/16 Figure 19 – Overview of Radioactive Waste Inventories since 1994

2011 Strategic Review – NLWS/LLWR/16 Figure 20 – Potentially Contaminated Land Stock and Future Arisings from (m3)

2011 Strategic Review – NLWS/LLWR/16 Figure 21 – NORM Waste Arisings Over Time

2011 Strategic Review – NLWS/LLWR/16 Figure 32 – SMART Inventory Volume Projections up until C&M Phase (~2030)

2011 Strategic Review – NLWS/LLWR/16 Figure 33 – SMART Inventory Impact on the Cumulative Raw Arisings of UK LLW/VLLW ( )

2011 Strategic Review – NLWS/LLWR/16 Figure 34 – SMART Inventory Impact on the Cumulative Raw Arisings of UK LLW/VLLW ( )

2011 Strategic Review – NLWS/LLWR/16 Figure 35 – Cumulative Raw Arisings of UKRWI LLW and VLLW inc. 2D148 Reduction

2011 Strategic Review – NLWS/LLWR/16 Figure 36 – Cumulative Raw Arisings of ACCELS and UKRWI LLW and VLLW

2011 Strategic Review – NLWS/LLWR/16 Figure 37 – Raw waste arisings of ACCELS LLW and VLLW by Waste Producer (m3)

2011 Strategic Review – NLWS/LLWR/16 Figure 38 – Raw waste arisings of ACCELS LLW by Waste Producer (m3)

2011 Strategic Review – NLWS/LLWR/16 Figure 39 – Raw waste arisings of ACCELS VLLW by Waste Producer (m3)

2011 Strategic Review – NLWS/LLWR/16 Figure 40 – Overview of Radioactive Waste Inventories including ACCELS Reductions