PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

INAF-OATs WorkShop – Trieste - 21 June 2013 V.Baldini MA05 INAF-OATs Workshop ESPRESSO Control Electronics Status.
PACS SVR22/23 June 2006 Erich Wiezorrek, MPE Test Facility Capabilities EGSE.
SENS-IT SENS-IT Small Electronic Network Sensor Integrity Tool Development of a Low-Cost Permanently Installed Microelectronic Wireless Monitoring System.
PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
PACS IBDR 27/28 Feb 2002 PACS Cryo Harness1 U.Grözinger, D.Lemke, R.Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from CSL,
MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
Max-Planck-Institut für Astronomie Heidelberg PACS SVR 22./23. June 2006 MPE Garching J. Stegmaier, U. Grözinger, D. Lemke, O. Krause, H. Dannerbauer,
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
PACS IIDR 01/02 Mar 2001 FPU Struts, Filter Wheel, Calibration Source1 D.Kampf, Dr. Roland Graue Kayser-Threde GmbH.
W. Aalders FPU CDR 1-3 July 2003 HIFI 1 FPU CDR MCS HIFI MECHANISMS 1.Focal Plane Chopper (FPC) 2.Diplexer Rooftop Mirror Translator (DRT) 3.Pivot development.
PACS IIDR 01/02 Mar 2001 PACS Mirror Specification1 Mirror Specification D. Kampf KAYSER-THREDE.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
Close Cycle Dilution for Space Ph. Camus, G. Vermeulen, G. Chaudhry, A. Benoit, F. Martin B-POL Workshop, IAP Paris, 29th July 2010.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
HL-LHC-UK Thermal Shield Update Niklas Templeton 07/03/2016.
Centrifuge The centrifuge used to separate solids suspended in a liquid by sedimentation. The rotational movements allow forces much greater than gravity.
Chris Booth Sheffield 29th March 2006
The Study on High Efficiency and Low Vibration Flexure Bearing Stirling Cryocooler Chuanlin Yin1,2, Yao Gao1,2, Hao Yan1,2, Fei Wang1,2, Qing Hong1,2,
11 T Dipole Integration & Plans M. Karppinen
Status of the Mechanics at Ciemat.
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
GE alternative and outcome
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Superconducting Links and Cold Powering components for HL-LHC
GLAST Large Area Telescope:
GLAST Large Area Telescope
First Stage Cryogenic IF Amplifier
GLAST Large Area Telescope
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
Undulator Cavity BPM System Status
Globus-M2 will be constructed by the end of 2015
Presentation transcript:

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper Overview Lifetime Model LM Tests New Schedule Open Points Conclusion

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper Lifetime Model LM manufacture started Nov 2000 at MPIA, drawings from Zeiss Assembly planned for Mar/Apr 2001 at Zeiss Design frozen

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper Chopper Overview Fully manufactured at MPIA mechanical workshop (A. Böhm and co-workers) housing mirror drive unit with 3 coils position sensor unit flexible pivot temperature sensor I/F point pigtail with I/F connector

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper Rotor Al g, 3.23x10 -7 kgm 2 integrated lightweight mirror sensor magnet drive magnets balancing masses

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper Flexural Pivots CuBe, double-stage  12° 5Nmm/rad

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper New Schedule

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper Work to do Consider FPU structural analysis (KT) with respect to vibration loads for the chopper Implementation of “PACS black color” for the chopper –First test on LM spare cover –Qualification for QM, FM, FS (MPE) Formal agreement with MPE for proposed QM/FM test procedures (#axes, temperature level)

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper Conclusion Features of promising MPIA prototype nearly fully adopted in Chopper design of Zeiss Specs to be achieved Optimized choice of materials, dimensions, linkage to be verified in LM and QM tests industrial QA guarantees outcome of a space qualified system Interface to warm electronics nearly specified minor effort to fix cable routing and launch lock details Start of cold lifetime tests in June 2001 QM to be delivered in October 2001 internalexternal

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper LM Tests MPIA 