Creating Downtown Boynton Providing Parking for Future Growth.

Slides:



Advertisements
Similar presentations
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Advertisements

$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
Who Wants To Be A Millionaire?
Chapter 4 Sampling Distributions and Data Descriptions.
Kick Off WB assignment Measurement and Dimensions.
Welcome to Who Wants to be a Millionaire
Alternative Algorithms
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Demonstration Problem
Manhattanville in West Harlem. Phase 1 South of West 125 th Street 2 District Rezoning and Project Boundaries Total Area of Proposed Manhattanville Mixed-Use.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
11 Inova Fair Oaks Hospital Master Facility Plan Zoning Applications Presentation March 2011.
AIDS epidemic update Figure AIDS epidemic update Figure 2007 Estimated adult (15–49 years) HIV prevalence rate (%) globally and in Sub-Saharan Africa,
AIDS epidemic update Figure AIDS epidemic update Figure 2007 Estimated adult (15–49 years) HIV prevalence rate (%) globally and in Sub-Saharan Africa,
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt RhymesMapsMathInsects.
A Snapshot of Council District One A Community Presentation Presented by the Department of City Planning.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
SymbolsGraphingSolvingCompoundMiscellaneou s
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Who Wants To Be A Millionaire? Maths Special Miss Carries Edition.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
AGENDA – PUBLIC FORUM July 9, Welcome and backgroundRod Lehnertz 2.Flood Task Force UpdateGregg Oden 3.Site Selection StudiesJoe Hibbard 4.Public.
ACC 3200 Chapter 3: Process Costing Process Costing.
PROJECT EMERALD SKYLINE
July 19, Horizon West Area 28,000 Gross Acres Six (6) Planned Villages / Communities Includes one (1) Town Center ~41,000 Planned Households.
Treasure Map By: Gage Gwin Haven Beagle START. Step 1 23 tiles south CONTINUE.
Analyzing Transactions
Campus Parking Plan Fall Existing Situation- Urban campus with no room to expand Residential neighborhoods to the North and East Fox River and Industrial.
Module Reading Plans and Elevations
Teds Big Boy Restaurant 5000 People were surveyed to determine if there is enough demand for a new Teds Big Boy Restaurant in the west side of town.
Patea Freezing Works Asbestos Overview of Quantities and Locations February 2009.
PP Test Review Sections 6-1 to 6-6
Mechanical & Electrical Golfers Society Annual Year End Awards Prysmian Cable Challenge.
WNY - PLACES OF INTEREST
Recent 38 th Avenue Investments. Wheat Ridge Family Clinic 6301 W 38th Ave Before After Sign, Façade, Awning Improvements and Architectural Assistance.
Cornville Community Park Conceptual Design Recreation Area and Facility Design Class March 12, 2008.
The Center for Houstons Future? Energy Corridor District.
1 Lincolnshire Research Observatory Lincolnshire’s Changing Population Components of Change and the Demographic Impact Eleanor.
1..
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Unit 2 Lesson 8 Part 1: Rounding to the Nearest Thousand Copyright © 2009 Kelly Mott.
Are You Smarter Than a 5 th Grader? 1,000,000 5th Grade Topic 1 5th Grade Topic 2 4th Grade Topic 3 4th Grade Topic 4 3rd Grade Topic 5 3rd Grade Topic.
Partial Quotients A Division Algorithm
City Council Meeting Agenda Items October 28, 2013.
CENTURY 21 ACCOUNTING © 2009 South-Western, Cengage Learning LESSON 2-1 Using T Accounts.
Jeopardy Triangles Q $100 Q $100 Q $100 Q $100 Q $100 Q $200 Q $200
Equal or Not. Equal or Not
Slippery Slope
1 Lab 17-1 ONLINE LESSON. 2 If viewing this lesson in Powerpoint Use down or up arrows to navigate.
Comparison Table NationRegionPopulation Real GDP (per capita)* Brazil(South America)203,429,773$10,800 ChinaAsia (East Asia)1,336,718,015$7,600 Finland(Scandinavia)5,259,250$35,400.
Equations of Circles. Equation of a Circle The center of a circle is given by (h, k) The radius of a circle is given by r The equation of a circle in.
Analyzing Genes and Genomes
Essential Cell Biology
Partial Products. Category 1 1 x 3-digit problems.
PSSA Preparation.
Essential Cell Biology
DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
1 Streetcars & Cities in the 21 st Century. Charlotte, North Carolina October 11, 2007.
Quiz Number 2 Group 1 – North of Newark Thamer AbuDiak Reynald Benoit Jose Lopez Rosele Lynn Dave Neal Deyanira Pena Professor Kenneth D. Lawerence New.
Cherry Creek North and Country Club Historic RNOs and TDA Colorado Cherry Creek North BID Cumulative Traffic Study.
Presentation transcript:

Creating Downtown Boynton Providing Parking for Future Growth

Where Is Parking Needed? At Planned Activity Centers The Boynton Beach Promenade The Marina Ocean Avenue Town Square The Mangrove Walk

The Central Business District

Map AreaLocation 2010 Peak Parking Demand (At 100% of Code) * No. of Existing SpacesSurplus (Deficit) ALibrary/High School/City Hall (384) BBoynton Beach Blvd. (Seacrest to FEC) (86) COcean Avenue (west of FEC) (38) D South of Ocean Avenue -From NE 3rd St. and Federal to SE 2nd Avenue (291) E North of Ocean Avenue to Boynton Beach Blvd., from SE 3rd St. to Federal (300) F West of Federal Highway to FEC, from Boynton Beach Blvd. to NE 6th Ave (44) G East Federal Highway to Intracoastal - From NE 4th Ave to NE 6th Ave to Intracoastal (35) H East of Federal Highway to Intracoastal, N. of Boynton Beach Blvd. (St. Marks & Mangrove Park) (41) IMarina Area* 1, ** (1,002) JSE Corner of Ocean/Federal (288) 5,928 3,419 (2,509) Projected Public Parking Demand

Proposed Public Parking Locations

Capacity of Proposed Sites Site #Name/AreaSq. Ft. of Site Potential # of Spaces 6:00 a.m. - 6:00 p.m.6:00 p.m. - 6:00 a.m. 1Ocean Pointe Tower/Marina Part of a Mixed-Use Project Ocean One/Marina Part of a Mixed-use Project st/3rd/Ocean Ave. 33,800113*/385** 4 NE Corner 1st/1st / Town Square 26,40088*/300** 5 SE Corner 1st/1st / Town Square 29,60099*/336** 592/1,3131,101/1,822 *Surface parking spaces. ** Structured parking.

Estimated Cost of Surface Parking Site #Name/Area Potential Number of Surface Spaces Land Cost Const. Cost Surface Total Surface Cost Cost Per Space Surface 1 Ocean Pointe Tower/Marina200TBD 2Ocean One/Marina400TBD 31st/3rd/Ocean Ave.113 $ 1,180,800 $ 282,500 $ 1,463,300 $ 12,950 4 NE Corner 1st/1st / Town Square88 $ 924,000 $ 220,000 $ 1,144,000 $ 13,000 5 SE Corner 1st/1st / Town Square99 $ 1,116,000 $ 247,500 $ 1,363,500 $ 13, $ 3,220,800 $ 750,000 $ 3,970,800

Estimated Cost of Structured Parking Site #Name/Area Potential Number of Surface Spaces Potential Number of Spaces - Structured Land Cost Const. Cost Structured Total Structured Cost Cost Per Space Structured 1 Ocean Pointe Tower/Marina200 TBD 2 Ocean One/Marina400 TBD 3 1st/3rd/Ocean Ave $ 1,180,800 $ 13,475,000 $ 14,655,800 $ 38,067 4 NE Corner 1st/1st / Town Square88300 $ 924,000 $ 10,500,000 $ 11,424,000 $ 38,080 5 SE Corner 1st/1st / Town Square99336 $ 1,116,000 $ 11,760,000 $ 12,876,000 $ 38, ,621 $ 3,220,800 $ 35,735,000 $ 38,955,800