IND 205 Audit Analysis of an Outcome

Slides:



Advertisements
Similar presentations
IND 205 Audit Populations & Samples TLO #10: Given the requirement to audit a Contractors Property Management System, determine how to define a population,
Advertisements

Risk Management and the Contractor’s Property Management System
IND 205 Auditing a Contractors Property Management System TLO #9 Auditing a Contractors Property Management System.
IND 205 Demilitarize Government Property
QUALITY SYSTEM AUDIT PRINCIPLES C. DAS, ADDITIONAL DIRECTOR
Audit Evidence Week 11.
Property Administration (PA)
Contract CloseOut.
Effective Contract Management Planning
EPA Regions 9 & 10 and The Federal Network for Sustainability 2005
ISO 9001:2000 Documentation Requirements
CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS ( ) (FEB 2007)
Effectively Integrating Information Technology (IT) Security into the Acquisition Process Section 4: Effective Integration.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
CENTRAL CONTRACTOR REGISTRATION (CAGE CODES) DFARS Case 2003-D040 DFARS Parts 204, 212, 213 and 252 are amended to remove policy on Central Contractor.
Discussion on SA-500 – AUDIT EVIDENCE
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
18- 1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 18 Integrated Audits of Internal Control (For Public Companies Under Sarbanes-Oxley.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
FPSC Safety, LLC ISO AUDIT.
ISO 9000 Certification ISO 9001 and ISO
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
The New FAR Property Plan Collaboration is Key 2007 Eastern Region Seminar Pat Jacklets, CPPM, CF.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Cinda Brockman, CPPM CF November 8, 2012 Case Study: Metrics Analysis versus Conducting an Internal Company-wide Property Management System Analysis.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Auditor's report Document prepared by the auditors appointed to examine and certify the accounting records and financial position of a firm. It must be.
FAR PART 45 – Government Property
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
FIND IT BEFORE THE AUDITOR DOES! Marlene Lynn, CPPM Manager of Asset Management, BAE Systems Electronic Solutions July 25, 2011.
Contractor Business Systems (CBS) Rule Eric Fassett.
Please use the following two slides as a template for your presentation at NES. Internal Audits: How to Plan and Perform Roy De Lauder, CPPM, CF Property.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
2013 NPMA Fall Conference Value Through Professional Asset Management You’re Having a Property Management System Analysis (PMSA)…Now What??? Terri L. Snook,
Bridging the Gap: Connecting Asset Management Disciplines in a World of Standards, Best Practices, and Measuring Outcomes Robert Kaehler, CPPS Bay Area.
Security Policies and Procedures. cs490ns-cotter2 Objectives Define the security policy cycle Explain risk identification Design a security policy –Define.
Managing Government and Contractor Owned Assets at an OCONUS Location Ron C. Lobo, CPPM CF.
11 Basic Property Management- Government Part II Meeting the needs of all our “customers” while implementing effective processes….. Two of the biggest.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 7-1 Chapter Seven Auditing Internal Control over Financial Reporting.
Copyright © 2007 Pearson Education Canada 7-1 Chapter 7: Audit Planning and Documentation.
National Property Management Association Lost Reports Barbara A. Finnegan, CPPM CF 1.
NASA Procedural Requirement, Administration of Property in the Custody of Contractors NPR Michael (Mike) Showers 1.
11 Basic Property Management-Government Part II Meeting the needs of all our “customers” while implementing effective processes….. Two of the biggest challenges.
IS 630 : Accounting Information Systems Auditing Computer-based Information Systems Lecture 10.
McGraw-Hill/Irwin © The McGraw-Hill Companies 2010 Auditing Internal Control over Financial Reporting Chapter Seven.
ISO Registration Common Areas of Nonconformances.
Fifty Shades of Property P. Jacklets, CPPM, CF July 31, 2013.
Internal Auditing ISO 9001:2015
National Property Management Association Creating a Self Assessment Program from Scratch July 28, 2011 Cathy Seltzer, CPPM CF TASC, Inc. Government Property.
Chapter 9 Substantive Procedures and the Financial Statement Audit Prepared by Richard J. Campbell Copyright 2011, Wiley and Sons.
Metrics for Property Management Eric Fassett. Metrics - standards of measurement by which efficiency, performance, progress, or quality of a plan, process,
ISO Most Common Problems May 25, 2000 Underwriters Laboratories Inc. May 25, 2000 Underwriters Laboratories Inc.
Copyright © 2007 Pearson Education Canada 9-1 Chapter 9: Internal Controls and Control Risk.
Chapter 9 Audit Sampling – Part a.
National Property Management Association Contract Property Closeout Standardization Cinda Brockman, CPPM CF, SAIC Pam McFarland, CPPM CF, Raytheon Technical.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
 Planning an audit of cost statements, records and other related documents is considered necessary to ensure achievement of audit objectives with available.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Module 6 Corrective Action Request (CAR) Overview
Internal and Governmental Financial Auditing and Operational Auditing
Change Control Module P5 LEARNING OBJECTIVES: LEARNING OUTCOMES
PRODUCT EVALUATION & TESTING BRANCH SUPPLIER SUPPORT DIVISION II
Internal control - the IA perspective
How to conduct Effective Stage-1 Audit
Presentation transcript:

IND 205 Audit Analysis of an Outcome TLO #11: Given a requirement to audit an outcome or process, determine how to analyze the sample and criteria and then generalize the findings to the population.

IND 205 Audit Analysis of an Outcome ELOs: 1. Define generalize. 2. Define findings. 3. Define criteria. 4. Define materiality. 5. Define significance. 6. Describe how to analyze a sample selected from a population for a specific outcome or process. If this is done correctly you should be able to generalize the findings to the population. For this exercise your professor will assign your Team an outcome or process. Your Team must determine the criteria needed to analyze a sample from the outcome or process. *Records *Physical Inventory

IND 205 Audit Analysis of an Outcome *Reports *Utilizing Government Property *Maintenance *Property Closeout 7. Distinguish between a systemic and non-systemic defect(s). 8. Distinguish between a material and immaterial defect(s). 9. Explain materiality and significance as they apply to acceptance and rejection rates (systemic versus non-systemic findings). (Measure of the estimated effect that the presence or absence of an item of information may have on the accuracy or validity of a statement. Materiality is judged in terms of its inherent nature, impact (influence) value, use value, and the circumstances (context) in which it occurs.) 10. Determine the acceptance/rejection of a population based upon the acceptance/rejection rates of the sample.

IND 205 Audit Analysis of an Outcome Property Management System (PMS) Audit Definition: Property Management System Audit-A systematic objective review and evaluation of a Contractor’s property management system (PMS) including both the written procedures and the application, implementation and compliance with those procedures including: The Government Property Clause The terms and conditions of the contract, and Any customary commercial practices, voluntary consensus standards, or industry leading practices selected by the Contractor for incorporation and application in the PMS.

IND 205 Audit Analysis of an Outcome The written procedures serve as a “standard” or a way to measure the performance of the Contractor’s processes, systems, records, and methodologies. Contractor employees are expected work to this standard (application of the procedures). Internal and External auditors will periodically examine the Contractor’s Property Management System to see how well the Contractor complies with both the written procedures and the application of the procedures. By careful examination and analysis of the Contractor’s Property Management System one can readily determine if the Contractor is compliant (acceptable risk) or non-compliant (unacceptable risk).

IND 205 Audit Analysis of an Outcome Analyzing an Outcome (Process): An outcome (process) is a segment of a Contractor’s Property Management System based upon the life cycle approach set forth in the Government Property Clause at FAR 52.245-1(f). Each outcome (process) is a unique segment of the whole PMS as required in the FAR. These segments are frequently referred to as the “life cycle” of Government Property and must be audited & analyzed for compliance. They are: Acquisition Receipt (identification) Records Physical Inventories Maintenance Subcontractor Control Reports, Relief of Stewardship Responsibility Utilizing Government Property (consume, move, store) Maintenance of Property Property Closeout (property disposal).

IND 205 Audit Analysis of an Outcome Minimum requirements for a Property Management System: FAR 52.245-1 establishes the MINIMUM requirements (standards) for each Outcome (Process). The contractor must augment these minimum requirements with voluntary consensus standards, industry leading practices, and customary commercial practices in their Property Management System. Whatever the contractor includes in their Property Management System is subject to audit and analysis. Compliance reduces the risk of loss of Government Property. Non-Compliance increases the contractor’s risk.

IND 205 Audit Analysis of an Outcome Population-An aggregation of documents or records, or even physical assets, or possibly even actions selected for review due to their “common characteristics.” Sample-A number of items such as documents, records, articles, or actions selected from a population/lot for a review in order to draw inferences regarding and generalizable to the status of the population. This is one of the more critical aspects of performing the audit because an inappropriate sample can lead to “audit bias” resulting in the findings being ruled invalid. Defect-A deficiency such as a lack of contractually required data, erroneous data, inadequate areas or controls, untimely data, etc.

IND 205 Audit Analysis of an Outcome Criteria/Criterion-Is an evaluative item of a PMS Process or Process segment subject to audit and analysis by the appropriate method. Specifically, criteria are the questions that are posed of the Contractor’s PMS.

IND 205 Audit Analysis of an Outcome Criteria/Criterion: Many of these questions involve more complex answers than a simple “yes” or “no.” They require an analysis of the data embedded in the question. For example, “Property control records conform to the FAR…” this question requires an analysis of the record card (or electronic records) to assure that the basic information required by the FAR is provided on that record. See FAR 52.245-1(f)(iii) plus any additional information required by customary commercial practices, voluntary consensus standards, or industry leading practices. In general, a “yes” or “no” answer is inappropriate for most criteria because it does not provide any audit evidence. Yes or No?

IND 205 Audit Analysis of an Outcome Analyze Defects A defect is a condition in which a process, a sample item, or sample item element of a Contractor’s PMS contains one or more deficiencies.

IND 205 Audit Analysis of an Outcome Analyze Defects (continued) Systemic Defects: These are serious defects that have a negative impact on the Contractor’s Property Management System. Non Systemic Defects: These are minor defects and have a minor impact on the Contractor’s Property Management System.

IND 205 Audit Analysis of an Outcome Generalize from the Sample to the Population If sample results are good, is the system good? If the sample results are bad, is the system bad? Analyze Defects: are they systemic or non-systemic?

IND 205 Audit Analysis of an Outcome Determine the status of the Process, Process Segment, or Criterion Do they comply with the established standards in the Contractor’s Property Management System? Is Corrective Action Needed? - Correction of System Defects - Correction of disclosed items with no systemic correction

IND 205 Audit Analysis of an Outcome FAR 52.245-1(g) Systems Analysis Should it be determined by the Government that the Contractor's (or subcontractor’s) property management practices are inadequate or not acceptable for the effective management and control of Government property under this contract, or present an undue risk to the Government, the Contractor shall prepare a corrective action plan when requested by the Property Administrator and take all necessary corrective actions as specified by the schedule within the corrective action plan. Please Note: DCMA requires their Property Administrators to first present the audit evidence for corrective action to the Contracting Officer. The CO (not the PA) will request corrective action from the Contractor.

IND 205 Audit Analysis of an Outcome Corrective Action Plan (continued) Contractors shall develop a Corrective Action Plan that shows milestones and timeframes for the correction of the deficiencies

IND 205 Audit Analysis of an Outcome System Audit Summary At the conclusion of each property system audit, the PA shall prepare a written summary of findings to support continued adequacy of the system and/or defects identified and their impact on system status (Acceptable or Disapproved)