VLLW & LOW ACTIVITY LLW DISPOSAL SERVICE

Slides:



Advertisements
Similar presentations
Management of the LLW National Waste Programme David Rossiter Head of National Programme.
Advertisements

Introduction to VLLW Disposal Services
Review of the year Presented By: Jonathan Evans, Head of Commercial.
Closing Remarks 2012 Customer Forum Martin Walkingshaw Executive Director Head of Waste Management Services.
Logistics Services New Integrated Transport Service
2011 Strategic Review - The Inventory Analysis 2011 Strategic Review – NLWS/LLWR/16.
Central Newfoundland Solid Waste Management Authority MNL SYMPOSIUM May 8, 2008 Edward Evans Executive Director.
Jubail Industrial City A $45 Billion Super Project
Managing Hazardous Waste India-EU Environment Forum Waste Management in the 21 st Century 12 November 2005 Sarah Paul Senior Policy Adviser Hazardous Waste.
CHARNWOOD FOREST LANDSCAPE PARTNERSHIP BID UPDATE Lesley Eddleston, Senior Landscape Architect Leicestershire County Council.
Building pride in Cumbria Do not use fonts other than Arial for your presentations NuLeAF Steering Group 24 October 2012 Nuclear site waste management.
Regulation of Low Level Waste Management
Building pride in Cumbria Do not use fonts other than Arial for your presentations Low Level Waste facilities and proposals in Cumbria NuLeAF seminar 22.
LOW LEVEL RADIOACTIVE WASTE MANAGEMENT Implementation issues – the Governments perspective (DECC & NDA) Bruce Cairns & Matthew Clark 22 nd March 2011.
NuLeAF Opportunities for Storage Consolidation of Higher Activity Wastes 4 th November 2011.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Wilhelms and Tanner-Faarinen Energy year 2012 District Heat.
San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.
ADBA PERMITTING WORKSHOP 27 March 2013 Stephen Barnes, Technical Director, Wardell Armstrong.
Certification of Compliance By Evita Lagard
Environmental Monitoring for West Cumbria in 2011 (Sellafield & LLWR nr Drigg) John Titley Monitoring, Assessment and New Reactor Permitting.
Developments in planning… How can we work more effectively to deliver a sound approach? Guy Robinson, 24 Oct 2012.
Local Government Waste Management A Private Sector Perspective Toby Terlet – Collex Pty Ltd. Manager - Technical Services.
Draft Cemeteries Strategy Harlesden ACF 24 th July 2012.
A Commitment to Community. Mission Statement Provides comprehensive, long-term solid-waste solutions in a safe, responsible, economically sound manner.
LA LLW Arisings and Capacity Analysis Nuleaf Radioactive Waste Planning Seminar 12 th March 2013 David Rossiter Head of National Programme LLW Repository.
Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Food Waste Composting Legislation Jen Walling Office of State Senator Heather Steans 7 th District.
Civil decommissioning market – an update Presented by Ron Gorham Head of Supply Chain Development and Commercial Relationships.
Salt Lake City, Utah Photo: Gary O. Merrill, GM, Murray City Power (Jan. 2006) GAS-TO-ENERGY PROJECT.
Waste Management (Food Waste) Regulations 2009
Challenges in LLW Management: a Local Government Perspective Fred Barker, Executive Director, NuLeAF SAFESPUR FORUM 29 April 2009.
Environmental Safety Case and Changes to Waste Acceptance Date: 25th April 2012 Dr Richard Cummings – LLWR ESC Project Manager Presentation to: Customer.
Great team work. Ecomaster 9 years of activity on Romanian environmental services market with result of positioning as one of the major national providers.
LLWR CUSTOMER FORUM VLLW & LA-LLW SERVICE 25 th MAY 2012 The Gateway to Augean & Provider of Tailored Services.
Low-Level Waste Advisory Committee Meeting October 2, 2014 TENORM Study Update 3 rd Quarter Tom Corbett, Governor E. Christopher Abruzzo, Secretary.
Walney Extension offshore wind farm Meeting with the Planning Inspectorate Bristol 1 st March 2013.
Fifty years Radioactive Substances Legislation – Time for Modernisation Steve Chandler (DECC) October 2009.
Waste Strategy Project Essex Waste Partnership Programme Delivery of July 2009 Outline Business Case Progress Update Waste Management Working Party - 15.
Our Focus on the Environment Diversion from Landfill Recycling Composting.
Implementing NDA’s Strategy - a year on Update to NuLeaf September 2012 Bill Hamilton, NDA Head of Stakeholder Relations.
SAFESPUR FORUM - Challenges in reducing the burden on the UK’s national Low Level Waste Repository 29 April 2009, Birchwood.
NORTH CENTRAL FLORIDA REGIONAL PLANNING COUNCIL REPORT AND RECOMMENDATION ALACHUA WEST DRI.
Information Technology Division Executive Office for Administration and Finance Springfield Data Center Program Energy Strategy Meeting 9/29/2009.
Update on progress with development of DS459
Current and future challenges in disposing of LLW – the LLWR perspective SAFESPUR WORKSHOP 29 April 2009 Presented By: Chuck Conway, Head of Consignor.
NuLEAF Seminar Developing the Evidence Base – LLW arisings and the need for management facilities 22 nd March 2011 Mervin McMinn – National Waste Inventory.
0 - Introduction 1/21 Benefits of Managing Solid Waste Non-sanitary landfills: Risk assessment & risk mitigation.
Hertfordshire Waste Procurement Programme – Progress Report Peter Davidson Programme Director 9 September 2009.
Divider custom What’s this layout for? Use this if you with to change the colour of the lines Sustainable Power – Unpacking the Buzz Word The world’s leading.
Hazardous Waste and Soil Landfill Disposal and Transport in QLD and Cross Border ACLCA – Australian Contaminated Land Consultants Association Date: 19/08/2015.
Steve Fisher Estate Safety Assurance Manager HSSSE Nuclear Decommissioning Authority (NDA) Herdus House Westlakes Science and Technology Park Moor Row.
INTER TERMINALS LTD Liquid Waste Solutions for the Shale Gas Industry 18 March 2015.
London 2062 Symposium London’s Energy Future Peter North 19 th March 2012.
SOLID WASTE MANAGEMENT CAPITAL PROJECTS ASSESSMENT Board of County Commissioners FEBRUARY 24, 2009.
Children Services Directory, Common Assessment Framework and ContactPoint Stephen Lees ContactPoint IT Project Manager Information Sharing and Assessment.
INTER TERMINALS LTD 13 April Inter Terminals Wholly owned subsidiary of Inter Pipeline 12 Bulk Liquid Storage Terminals in UK, Germany,
Spent Fuel Management and Nuclear Materials (SFM&NM) July 2016 Update
SACO’S MANUFACTURING PREMISES FACTORY 1
Beatty LLRW Site Event LLW Forum Spring Meeting Park City, Utah
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Updating the NRC’s Alternative Disposal Request Guidance Document
Environmental Monitoring for West Cumbria in 2014
Emily Pike Community Liaison Manager, SUEZ
Environmental Monitoring for West Cumbria in 2016
Waste Management Services WCSSG – LLWR Working Group
Presentation to the Environmental Health Sub-committee – November 2017
Presentation to the Environmental Health Sub-committee – November 2016
Presentation to the Environmental Health Sub-committee – November 2013
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Presentation transcript:

VLLW & LOW ACTIVITY LLW DISPOSAL SERVICE Presentation at 2012 LLWR Forum Rheghed, Cumbria Bav Thaker Technical Manager (UK) 24th April 2012

Clifton Marsh Landfill Site - Background Location: 6 km West of Preston Centre, County of Lancashire, Northwest England Current Capacity: 2.1 Million m3 Current Planning Consent: Lancashire County Council has Granted Consent to Continue Operations until 31st December 2015 Landfill Disposal Phasing: 4 Phases 1, 2 and 3 Full and Capped Phase 4 Receiving Waste Disposals Landfill Disposal Capability: General, Asbestos in a Separate Monocell and Radioactive Waste Hazardous Waste Transfer Station Radioactive Waste Disposals: The Landfill has received Radioactive Waste for disposal since 1986 from Springfields Fuels Ltd, Sellafield Ltd (Capenhurst Site) and URENCO UK Ltd at Capenhurst Site under their Respective RSA 93 Authorisation

Clifton Marsh Landfill Site Phase 4 2nd Asbestos Monocell Composting Pad Phase 1 Electricity Generators Leachate Treatment Lagoons Phase 2 1st Asbestos Monocell Phase 3 Site Office Hazardous Waste Transfer Station River Ribble United Utilities Water Treatment Works More Than Just a Waste Disposal Site!!!

Clifton Marsh Landfill Site - Future Continue General Waste Disposals Continue Asbestos Disposals Continue Hazardous Waste Transfer Service Continue Electricity Generation (upto 4 MW / Yr) Continue Radioactive Waste Disposals from Springfields Fuels Ltd, Sellafield Ltd (Capenhurst Site) and URENCO UK Ltd at Capenhurst Site Secure EPR (due May 2012) to Enable a Wider Customer Based Disposal Service Capability to UK Nuclear and Non-Nuclear Industries Apply for an Extension to the Current Planning Consent (Demand Driven)

Clifton Marsh Landfill Site - Capability Part of VLLW Disposal Service Framework with LLWR VLLW Disposal Service Contract Secured with LLWR (but Willing to Contract Directly with 3rd Parties also) Capability to Receive an Extensive Range of Radionuclides Receipt and Disposal of Radioactive Waste upto an Average Activity of 200 Bq/g within a 10te Load Maximum Activity Within a Consignment is 1000 Bq/g If Strontium 90 is Present Within a Consignment then Limited to an Average Activity of 100 Bq/g within a 10te Load Waste Receipt in Approved Bags, Drums, ISO Containers and Loose (Subject to a Prior Pre-Assessment) Draft Permit Available for Viewing at Exhibition Stand

Contact Details Bav Thaker Technical Manager (UK) – Radioactive Waste and NORM Darwen Resource Recovery Park Springfield House Lower Eccleshill Road Darwen Lancs BB3 0RP Tel No. 01254 819700 Mob No. 07764 658809 Fax No. 01254 819749 E-Mail Address: Bav.Thaker@Sita.co.uk Web Site Address: WWW.Sita.co.uk

QUESTIONS???