BETTER SOLUTIONS KMS : PRESS Transport/Installation 2006.08.30.

Slides:



Advertisements
Similar presentations
DEFINITION Insurance policy is an evidence of insurance issued to the insured by the insurer, an evidence of lodging and accepting a claim and an important.
Advertisements

1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
ThemeGallery PowerTemplate
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
01 Prologo 02 Bran 103 Catelyn 1 05 Eddard 1 04 Daenerys 1 06 Jon 1 07 Catelyn 2 10 Tyrion 1 08 Arya 1 16 Sansa 1 09 Bran 2 11 Jon 2 12 Daenerys 2 13 Eddard.
1_Panel Production. 380 pannelli 45 giorni di produzione = 8.4 pannelli/day.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 4 Future Value, Present Value and Interest Rates.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. *See PowerPoint Lecture Outline for a complete, ready-made.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
UNITED NATIONS Shipment Details Report – January 2006.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
NANPA Oversight Working Group Status Report to the NANC March 20, 2001 Chair Pat Caldwell.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Inland Waterway Lock/Vessel Optimization Study Upper Mississippi River Locks Center For Transportation Studies University Of Missouri, St. Louis.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Board of Early Education and Care Retreat June 30,
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
5 th - Number Sense. 1. Which is the same as 13? A B. 10 × 3 C D. 1 × 3.
Year 6 mental test 10 second questions
C1 Sequences and series. Write down the first 4 terms of the sequence u n+1 =u n +6, u 1 =6 6, 12, 18, 24.
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
PORT OF LAKE CHARLES. CITY DOCKS 11 USAID/USDA approved transit sheds 13 Ship Berths 1.3 million square feet waterfront storage 600,000 square feet of.
Measuring Time. Learning Goals To measure time, we start counting units of time when the activity begins and stop counting when the activity ends. The.
Break Time Remaining 10:00.
This module: Telling the time
KARACHI FASHION WEEK CHAPTER 3 JANUARY 27 – 30, 2011 FASHION RUNWAY SHOW FASHION RUNWAY SHOW BRAND PRESENTATIONS BRAND PRESENTATIONS FASHION BRANDS EXHIBITIONS.
Analyzing Transactions
DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY Product and Production Configuration Method (PPCM) ICE 2009 IMS Workshops Dorothy Parallel.
Alabama State Port Authority Infrastructure for Tomorrows Market October 2005.
15. Oktober Oktober Oktober 2012.
Created by Mr. Lafferty Maths Dept.
We are learning how to read the 24 hour clock
1..
Equal or Not. Equal or Not
: 3 00.
5 minutes.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Number Factors and Multiples Saturday, 09 September 2006 ©RSH.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Short Range 9 Km Expanded Range 29 Km Medium Range 43 Km Long Range 75 Km Israel border Missile Range.
03 February Infinity Logistics Version - 01 To ensure that we continue to meet the needs of our customers & partners in the increasingly competitive.
Welcome To.
BETTER SOLUTIONS 4-2. River transport & Transit port (Rinz) overview of port of Rinzdischarging operation from barge.
Infinity Logistics FZE R 6, Office # 38 PO Box , Sharjah SAIF Zone United Arab Emirates Tel
Project cargo.
More professional – More successful
More professional – More successful
The Guide In Sea , Land & Air.
Presentation transcript:

BETTER SOLUTIONS KMS : PRESS Transport/Installation

1. Project Overview 2. Project Execution Schedule 3. Ocean Transportation 4. River Transportation 5. Inland Transportation 6. Site installation and commisioning Contents BETTER SOLUTIONS

1.Project Overview Manufacturer & Supplier : Rotem Company / WIA Corporation (Korea) Site : KIA Motors Slovakia (Zilina, Teplicka site) KMS Equipment List ShipmentDescriptionWT(Ton)CBMFOB Date 1 st shipment5,400T Press & Auxiliaries4,0869, nd shipment5,400T Press2,8146, Total6,89015,217 Transport Schedule : Masan Rotterdam/Constanza Rinz Zilina (sea : 25~35d duration) (river : 15d) (land : 10d) Installation/Commissioning : Press #1st + Aux.–05.12~06.01 / 06.01~04 #2nd – 06.03~05 / 06.05~07

BETTER SOLUTIONS 2. Project Execution Schedule Schedule 05 year06 year junjulyaugsepoctnovdecjanfebmaraprmayjunjulyaug presentation(6/29) Proposal letter Final quotation contracting Contract (exec.co) final Packing list Transportation(1 st ) Installation/trial(1 st ) Transportation(2 nd ) Installation/trial(2 nd )

BETTER SOLUTIONS 3. Detail schedule for ocean transportation shipment (changwon) trucking masan (to load) loading (bulker) Ocean transport (bulker) discharging (rotterdam) barging Barge transport (danube) discharging,on truck,custom clearance (rinz) Inland transport (rinz-zilina) KMS Deliver to factory custom clearance (zilina) Installation & commisioning 25 3 Normal : 61d short : 55d Transport duration (departure~custom clearance) 33 RotemBMI(SSU)

BETTER SOLUTIONS 3-1. Shipment scope Requirement at the time of loading partyworking scope ROTEM documents : Invoice, Packing list, export license, insurance inland trucking & storaging warehousing & inport shuttle in time sailing (rotem & wia) final cargo readiness : end of aug. BMI(SSU) charter vessel berth arrangement loading issue B/L transport shcedule management

BETTER SOLUTIONS 3-2. Loading operation loading operation

BETTER SOLUTIONS 3-3. Route and duration of ocean transportation Suez Constanza Rotterdam Masan Typical Liner (35days) Charter vessel (25days)

BETTER SOLUTIONS Vessel spec. & transit time (Typical Liner) Vessel Type : Typical Liner (Multi-purpose heavy lift) Gross tonnage : 24,000Ton Net tonnage : 11,000Ton Length(Over All) : 200M Breath(Mid) : 28M Depth(Mid) : 15M Mouldet Draft/Dwt : 11M/30Ton Built : Year 2004 Classification : G. Lloyd A5 E Cargo Hold : No.1~5 Hold with Tween Deck Speed : 18~20 Knots

BETTER SOLUTIONS Vessel spec. & transit time (Charter Vessel) Vessel Type : Multi-purpose heavy lift Gross tonnage : 9,000Ton Net tonnage : 5,000Ton Length(Over All) : 120M Breath(Mid) : 20M Depth(Mid) : 12M Mouldet Draft/Dwt : 9M/20Ton Built : Year 2000 Classification : G. Lloyd A5 E3 Cargo Hold : No.1~2 Hold with Tween Deck Speed : 15 Knots