Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A The Free Flight Deck Society of Automotive Engineers (SAE) S-7, “Flight.

Slides:



Advertisements
Similar presentations
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Advertisements

Robert L. Helmreich, Ph.D. FRAes The University of Texas
SIP/2012/ASBU/Nairobi-WP/19
FANS (Future Air Navigation System) Flight Crew Procedures
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
1 PHARE Achievements Dr. H. Schröter PHARE Programme Manager EUROCONTROL version 1.1,
1 Air-Ground Integration Ed Bailey, Airborne Project Leader & Ian Wilson, PATs Project Leader.
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
Ground Human Machine Interface (GHMI): trends and the future
1 Measurements & Validation R G Stamp Head of Department of ATM Research National Air Traffic Services Ltd, UK.
1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 Validation & Measurement Methods for the PHARE Demonstrations R A Whitaker Validation Project Leader.
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A Slot Swapping Applications for CDM P.R. de Waal, NLR M.H. van den.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 CARE-ASAS Activity 3: ASM Estimating safe separations.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OHA CARE-ASAS Activity 3: ASM Autonomous Aircraft OHA.
CARE ASAS Validation Framework System Performance Metrics 10th October 2002 M F (Mike) Sharples.
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Airspace Volumes and Sectorisation Good Design Practice Airspace Volumes and Sectorisation Good Design Practice 1.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Using CNS/ATM to Dramatically Improve Gate-to-Gate Operations Captain Bob Hilb UPS Advanced Flight Systems October 8, 2007.
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A AI Planning at airports:Departure Management PLANET Industry Day.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A The Transition Towards Free Flight: A Human Factors Evaluation of.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Designing for Safety: the Free Flight ATM concept Jacco Hoekstra.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Overview of NLR Free Flight project ‘97 - ‘99 Jacco Hoekstra
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Page 1 The ONESKY (Single-Sky) project and what it means for ASAS.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink R.R.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A “Free Flight with Airborne Separation will result in an uncontrolled,
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A “Free Flight with Airborne Separation will result in an uncontrolled,
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Free Flight with Airborne Separation will result in an uncontrolled,
ASAS Thematic Network Workshop #2: TAGA - Traffic Awareness for General Aviation DFS Research and Development October 2003 TAGA - Traffic Awareness for.
C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE ASAS-TN, 2nd workshop - Malmö 6 ~ 8 october 2003page 1 Electronic separation Clearance Enabling the Crossing.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
25 seconds left…...
We will resume in: 25 Minutes.
Benedetto Marasa ENAC Deputy Director General 1. – Cooperation in the development of: Safety regulations Standards Licensing measures Projects of mutual.
Presented to: REACT Workshop By: Jay Merkle Date:25 June 2008 Federal Aviation Administration High Density Airport Time- based RNAV/RNP NextGen/JPDO Demonstrations.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Sense & Avoid for UAV Systems
NASA Self-Separation from the Air and Ground Perspective Margaret-Anne Mackintosh, Melisa Dunbar, Sandra Lozito, Patricia Cashion, Alison McGann, Victoria.
1/14 Development and Evaluation of Prototype Flight Deck Systems for Distributed Air-Ground Traffic Management ASAS Thematic Network - Workshop 3 Toulouse,
© 2003 The MITRE Corporation. All Rights Reserved. Cockpit Display of Traffic Information (CDTI) Enhanced Flight Rules (CEFR) Randall Bone October 7, 2003.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
An Automated Airspace Concept for the Next Generation Air Traffic Control System Todd Farley, David McNally, Heinz Erzberger, Russ Paielli SAE Aerospace.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
ATC1 Air Traffic Control ATC2 Purpose of ATC Safety — Conflict Avoidance — Separation of aircraft Visual Flight Rules Instrument Flight Rules Efficiency.
IFly project: Airborne Self Separation as basis for advanced en route ATM Henk A.P. Blom iFly coordinator National Aerospace Laboratory NLR
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Lessons learned from pilot involvement in ASAS experiments Rob Ruigrok & Hans Huisman ASAS Thematic Network Workshop 3 “ASAS - Making it happen”, Toulouse.
DIRECTION TECHNIQUE CERTIFICATION Paris, April 2008 SL ASAS TN2 Workshop ppt ASAS & Business.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
ADVANCED AIR TRANSPORTATION TECHNOLOGIES DISTRIBUTED AIR/GROUND-TRAFFIC MANAGEMENT 5 th USA/Europe Air Traffic Management R&D Seminar Budapest June 2003.
Nationaal Lucht- en Ruimtevaartlaboratorium – National Aerospace Laboratory NLR Towards a paperless Air Traffic Control Tower Tanja Bos, National Aerospace.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A l Humans smarter, meaner, more strategic, emotional, variable, etc.
Richard Barhydt. Dr. Todd Eischeid† Michael Palmer. David Wing
Karim Zeghal EUROCONTROL Experimental Centre
Trajectory-Based Operations(TBO) Saulo Da Silva
Presentation transcript:

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A The Free Flight Deck Society of Automotive Engineers (SAE) S-7, “Flight Deck and Handling Qualities Standards for Transport Aircraft” Amsterdam, 1 May 2000 Rob Ruigrok, Jacco Hoekstra, Ronald van Gent

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-2A Presentation Overview l Introduction to Free Flight l Design of the Free Flight Deck –Starting points –Airborne Separation Assurance System l Using the Free Flight Deck: –NLR studies on Free Flight with Airborne Separation Assurance l Conclusions and Recommendations l Future Plans l Demonstrations

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-3A Introduction to Free Flight RTCA definition: zones l Protected zone: –spatial, according operational separation standards –expected to remain free of other aircraft l Alert zone: –spatial or time based zone around the protected zone –conflict alerts are issued to the pilot

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-4A Introduction to Free Flight Eurocontrol’s definition

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-5A Design of the Free Flight Deck Starting points l Operational Concept (probe the limits) –No Air Traffic Control –Air crew responsible for traffic separation –Focus on Free Flight Airspace –Central Traffic Flow Management active –Managed Airspace near airports (TMA) l Cruise flight only –Direct routing –Optimal cruise altitude l Limited scope –No Special Use Airspace (SUA) –No weather

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-6A Design of the Free Flight Deck What do we need ? l Aircrew has to: –“see” other traffic –determine conflicts with other aircraft –resolve conflicts with other aircraft –avoid new conflicts with other aircraft –be alerted Airborne Separation Assurance System (ASAS) l Investigate minimum standard: –flight deck design based on, and close to current implementation (EFIS, FMS, TCAS)

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-7A Design of the Free Flight Deck ASAS equipment l “See” other traffic –Automatic Dependent Surveillance - Broadcast (ADS-B), Traffic Information Service - Broadcast (TIS-B) –Cockpit Display of Traffic Information (CDTI) l Determine and resolve conflicts with other aircraft –Conflict Detection and Resolution (CD&R) l Avoid new conflicts with other aircraft –Predictive ASAS (PASAS) l Be alerted –Alerting logic

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-8A Design of the Free Flight Deck Conflict definition A conflict is defined as a potential intrusion of the protected zone in the near future

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-9A Design of the Free Flight Deck Conflict Detection & Resolution ownship intruder minimum distance protected zone intruder avoidance vector advised vector 1. heading change 2. speed change not shown: 3. vertical speed change

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-10A Design of the Free Flight Deck Cockpit Display of Traffic Information l Navigation Display –Traffic Symbology –Conflict Detection –Resolution Advisories –Vertical Navigation Display –Extra EFIS Control Panel functionality

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-11A Design of the Free Flight Deck Predictive ASAS l “no-go” bands for – track/heading – vertical speed – speed

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-12A Using the Free Flight Deck NLR studies on Free Flight l Studies on Airborne Separation Assurance, the flight deck perspective: –Conceptual design and off-line validation –Safety analysis –1997 human-in-the-loop experiment –Cost/benefit analysis –Avionics requirements study –Critical conflict geometry study –1998 human-in-the-loop experiment l In co-operation with NASA, FAA and RLD

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-13A Using the Free Flight Deck 1997 human-in-the-loop experiment l Traffic Densities: –Single –Double –Triple l Level of Automation: –Manual –Execute Combined –Execute Separate l Non-Nominal: –Other aircraft failures/events –Own aircraft failures/events –Delay time increased

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-14A Using the Free Flight Deck 1997 human-in-the-loop experiment l Acceptability: –91.5% (single), 83.0% (double), 78.7% (triple) l Safety: –88.3% (single), 75.5% (double), 71.3% (triple) l Workload: –ratings less than 40, indicating “costing some effort” l Across all densities, across all sessions, across all subject pilots, including non-nominal events

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-15A Using the Free Flight Deck 1998 human-in-the-loop experiment l Goals –study the transition to Free Flight Airspace (in space) –study the transition towards Free Flight in time l Starting points: –equipping aircraft should be immediately beneficial to the airlines –equipping should be economy driven in stead of mandatory –benefit the equipped aircraft, without excluding the unequipped aircraft

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-16A Using the Free Flight Deck 1998 human-in-the-loop experiment l Three ATM operational scenarios with Free Flight elements defined, implemented and tested: –Flight Level –Protected Airways –Full Mix l Experiment matrix –Traffic Density - low density versus high density –Equipage - 25% versus 75% ASAS equipped –ATM operational concept - Flight Level, Protected Airways and Full Mix

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-17A Using the Free Flight Deck 1998 human-in-the-loop experiment l > 85% of responses indicate FF acceptable or better

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-18A Using the Free Flight Deck 1998 human-in-the-loop experiment l > 85% of responses indicate FF as safe or safer than ATC

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-19A Using the Free Flight Deck 1998 human-in-the-loop experiment l Workload measurement: –Subjective by means of questionnaires with Rating Scale of mental Effort (RSME) –Objective by means of Eye-Point-Of-Gaze measurements l Scan randomness (entropy) used as objective metric for workload

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-20A Using the Free Flight Deck 1998 human-in-the-loop experiment l Workload: sensitive to ATM operational scenario

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-21A Conclusions and Recommendations l The feasibility of Free Flight with Airborne Separation Assurance could not be refuted, based on 7 NLR studies on Free Flight l The future ATM design has to be chosen very carefully, since the design itself affects pilot and controller workload considerably l The flightdeck crew was able to handle much higher traffic densities than the ground controller (distributed versus centrally organised nature) Free Flight might be a solution for current airspace capacity problems

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-22A Future Plans l Human Interaction Experiment, using Internet gaming facilities (scheduled June 2000) (we need many volunteering pilots for this, to register please contact or l Flight testing of ASAS equipment, using “real” data –using NLR and possibly NASA laboratory aircraft l Simulation experiments to study: –the effect of real ADS-B characteristics –the use of Free Flight equipment in Managed Airspace –the integration of traffic, weather and terrain information in the cockpit

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-23A Demonstrations l Research Flight Simulator: Free Flight demo l NLR’s ATC Research Simulator NARSIM l NLR’s Research Flight Simulator - Next Generation

Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-24A Contact / More information l NLR Free Flight web site: l /phone: Rob Ruigrok: Jacco Hoekstra: Ronald van Gent: l Mail: Nationaal Lucht- en Ruimtevaartlaboratorium Anthony Fokkerweg CM Amsterdam The Netherlands