SPP.org 1. DRCC June 2008 National Town Meeting SPP Regional Transmission Organization Update.

Slides:



Advertisements
Similar presentations
PJM ©2008 Regional Round-up of Demand Response Developments Susan Covino PJM Interconnection A National Town Meeting on Demand Response Washington, DC.
Advertisements

Demand Response Commissioner Suedeen Kelly June 3, 2008.
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
PG&Es 2009 Participating Load Pilot. 2 Overview Regulatory Context Pilot Characteristics Lessons Next Steps.
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NAESB Overview Presented to: Data Privacy Task Force February.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Directorate General for Energy and Transport Next steps in developing the regional energy market in South East Europe European Commission DG Energy and.
1 1 SPP Credit Policy Tutorial Revised – August 20, 2010.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Texas Energy Independence Week Renewables & Natural Gas: Confluence, Conflict, or Something In Between? February 23, 2011 Todd Foley Senior Vice President,
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
North American Energy Standards Board Activities and Work Group Update Market Issues Subcommittee August 9-10, 2010.
 To facilitate the implementation of employment equity and the communication to employees of matters relating to employment equity and diversity.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
1 May 8, 2006 Briefing to Northwest Congressional Delegation Staff.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
1 Presentation to the Wisconsin Industrial Energy Group (WIEG) T. Graham Edwards President & CEO August 9, 2007.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Loads Acting as a Resource Relationships with QSEs and LSEs
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Western Governors Association Renewable Energy Certificates Initiative for the West WRAP Board Meeting October 15, 2003 Salt Lake City, Utah.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Demand Response in Midwest ISO Markets February 17, 2008.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Financial Subcommittee Report February 15, Identify options for funding new equipment. Tasks include: Identify and evaluate potential sources of.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
Update - RTOs and Capacity January 28, Purpose of Presentation Update the Commission on issues related to – (1) Ameren Missouri – potential Local.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011.
FERC Perspective on Demand Response David Kathan FERC Midwest Demand Response Initiative Chicago, IL February 9, 2007 The author’s views do not necessarily.
Updated 1/28/2011.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
NARUC/FERC COLLABORATIVE: DEMAND RESPONSE Paul Suskie, Chairman, Arkansas Public Service Commission July 15, 2007.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
NAESB Conference Call October 10, 2008 DSM EE RETAIL GROUP.
14 Minute Ramp Period Testing Workshop June 30, 2009.
Load Participation in Nodal Training Session Update DSWG December 7, 2007.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting March 11, 2008.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Regulatory Cooperation to Promote Regional Markets William H. Smith, Jr., Executive Director Organization of MISO States (USA) World Forum on Energy Regulation.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, Improvement of market relations in.
ALLIANCE RTO 1 The Alliance RTO Rate Plan Presented to SPP RTWG Meeting at DFW Airport Hyatt The Alliance RTO Rate Plan Presented to SPP RTWG Meeting at.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
New Task on DSM and Climate Change Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee Meeting Brugge, Belgium.
Asia-Pacific Energy Regulatory Forum
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
The New Texas Wholesale/Retail Market
Presentation transcript:

SPP.org 1

DRCC June 2008 National Town Meeting SPP Regional Transmission Organization Update

SPP.org 3 SPP RTO Update on DR Developments SPP has three organizational units working on various aspects of demand response:  Demand Response Task Force  Customer Response Task Force  Cost Benefit Task Force

SPP.org 4 Demand Response Task Force (DRTF)  The purpose is to incorporate demand response into SPP’s real-time energy imbalance market. This market was successfully implemented on February 1,  A Protocol Revision Request (PRR) has been drafted and still is in committee review at SPP.  Variable Dispatch Demand Response - offer and deployment identical to current generation resources  Block Dispatch Demand Response - offer is for fixed MW blocks at a price SPP RTO Update on DR Developments

SPP.org 5 SPP RTO Update on DR Developments Customer Response Task Force (CRTF)  Conduct a "State-of-the-art" (within SPP) DR survey & dissemination of such;  This is in process and Lawrence Berkeley National Laboratory is providing guidance and analysis  Provide for Member education as to potential benefits and institutional barriers;  An educational forum for SPP’s Members, Board, and State Regulators is being planned for July  Conduct an analysis of the discontinuities between wholesale and retail markets as to DR; and  Conduct an analysis of the interplays of DR with performing future benefit/cost analyses.

SPP.org 6 Cost Benefit Task Force (CBTF)  The CBTF is coordinating with an independent third party consultant (Ventyx) in development of a cost – benefit analysis that will determine the projected overall costs and benefits to the SPP members of a Day-Ahead Market (DAM) and Ancillary Services Markets (ASM), both separately and jointly.  One of several prime objectives of the cost – benefit study is to seek ways to increase participation by demand response resources in SPP markets. SPP RTO Update on DR Developments

William L. Wylie, PE Executive Director