10/10/02 - 1 NCP presentation An outline of the implementation of Co-ordination Actions (CAs) in the Sixth Framework Programme (as of October 2002) europa.eu.int/comm/research/nfp/networks-ip.html.

Slides:



Advertisements
Similar presentations
Support for the coordination of activities ERA-NET - 1 Coordination of national and regional programmes Introduction to the ERA-NET scheme European Commission.
Advertisements

– Seoul December 06 ERCIM Preparing European proposals Bruno Le Dantec ERCIM EEIG France – Seoul December 2006.
19/02/ Cyclades Kick Off Meeting What a European Co-ordinator expects from his partners and what a European Consortium expects from his Co-ordinator.
European Commission - Directorate-General for Research IP short.doc 1 FP6 Integrated Projects FP6 Integrated Projects A new instrument for supporting.
European Commission - Directorate-General for Research Networks of Excellence NoEshort.doc 1 FP6 Networks of Excellence A new instrument for.
Planning and use of funding instruments
The Implementation Structure DG AGRI, October 2005
Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.
GRIDS infrastructures under the 6th FP Contractual and financial modalities Christophe KOWALSKI European Commission, Information.
The Managing Authority –Keystone of the Control System
Information and Communication Technologies (ICT) in the Seventh Framework Programme Coordination actions ICT Calls Jan- March 2012.
European Union Cohesion Policy
INFSO/F3 1 Guide for proposers Willy Maes INFSO/F3, EC TEN-TELECOM Information Day.
Information Day Call 2001/1 - Brussels 19 June Call for proposals 2001/1 HOW TO PREPARE AND PRESENT YOUR PROPOSAL Willy MAES DG INFSO/F3
European Commission DG Research Co-operative Research Training Session on Ifigeneia Pottaki Research & SMEs DG Research - European Commission Training.
1 Research and SMEs in the 6th Framework Programme Xabier Goenaga DG Research - European Commission Brussels, October 15th, 2002.
European Commission DG Research SF SME NCP Main activities of the Network Sebastiano FUMERO Research & SMEs DG Research - European Commission.
European Commission DG Research SMcL Brussels SME-NCP 23 October 2002 THE 6th FRAMEWORK PROGRAMME Economic & Technological Intelligence S. McLaughlin.
Sixth Framework Programme Contract/Financial Guidelines Miriam Driessen Reilly, Legal Sector 20th June 2003.
Science, research and development European Commission THE FIFTH FRAMEWORK PROGRAMME B. Magis ACT/campagneinfo/slides/AG/AG6/5FP/conparEN.ppt.
European Union Cohesion Policy
European Commission FROM THE PROPOSAL TO THE PROJECT ESSEN February Megan Richards - DG XII - European Commission CONFERENCE TO LAUNCH.
1 17/3/2009 European Commission Directorate General Information Society & Media Funding Instrument Briefing for Remote Reading.
Characteristics of projects in EU research programmes
European Commission Research 1 The 6th FRAMEWORK PROGRAMME FOR RESEARCH AND TECHNOLOGICAL DEVELOPMENT Richard ESCRITT Director Co-ordination of Community.
Guide for Proposers Research Infrastructures Integrated Infrastructure Initiative - I3 Bernhard FABIANEK European Commission,
Information and Communication Technologies (ICT) in the Seventh Framework Programme Large-scale integrating projects (IPs)
Information and Communication Technologies (ICT) in the Seventh Framework Programme Support actions.
SMEs in the. SMEs in FP7 - why? SMEs are at the core of European industry and key players in the innovation system. SMEs have to respond increasingly.
1 Supporting the cooperation and coordination of research activities carried out at national or regional level The “ERA-NET” Scheme
The IST Programme Information Society Technologies Programme (IST ) 1 FP5: IST Programme Information Society Technologies IST Programme How it works Jacques.
Stefano Fontana European Commission DG RTD Research for the benefit of SMEs SMEs in the.
Research and Innovation Summary of MS questions on the Commission's proposal for DG Research & Innovation Research and Innovation Rules for Participation.
Policy Research and Innovation Research and Innovation Implementation of FP7 support actions InnovaBalt KICK-OFF MEETING 3-4 September 2013 Riga Luc Janssen.
FP7 EC Rules – Groupe recherche 16 January 2006Megan Richards European Community FP7 Participation Rules (Commission proposal adopted )
Funding Schemes. Legal and Financial Rules in the 7th Framework Programme PHOENIX Training Laulasmaa, 1 Sept 2007.
European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Not legally binding FP7 Rules for Participation and Grant agreement FP7 Helpdesk 
Provisional FP7-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 2. The Funding schemes.
Call ref.: FP ACC-SSA-2 (10/2004) Contract Negotiation - Sofia - Bulgaria 10 February, Mrs Marina ZANCHI DG Research Directorate N International.
1 Framework Programme 7 Guide for Applicants
FP6 Project Organisation. Participating in FP6 How Projects Are Organised FP6 research projects are almost always collaborative 1 and implemented using.
Work Programme for the specific programme for research, technological development and demonstration "Integrating and strengthening the European Research.
RTD-A.3 Legal Unit – Myriam Gómez-Martelo 13/05/2005- University of Naples Not legally binding Sixth Framework Programme Rules and legal aspects FP6 CONTRACTS.
Ismar Financial and administrative procedures Nearest Kick-off meeting Bologna, 11 October 2006.
Basic principles of FP7 Grant Agreement Financial management and reporting.
Implementation Instruments for FP6 Thematic Priorities Joseph Prieur - Aeronautics DG Research- Space &Transport.
Practical aspects Dr. Ir Matthijs Soede Senter/EG-Liaison “Practical Aspects of Preparation FP6 projects Poznan - 21 November 2002 Dr. Ir.
Megan Richards RTD FP6 Kick Off Meeting Priority 7 and 8 11 November 2004 Sixth Framework Programme MANAGING FP6 CONTRACTS.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
Unit N4 Conference 6FP Bucharest - 13 February, 2004 HOW TO PREPARE AND MANAGE EU PROPOSALS AND CONTRACTS Yves Motteu.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
How to take part in the FP6 Nuclear Fission and Radiation Protection Programme How to take part in the FP6 Nuclear Fission and Radiation Protection Programme.
European Commission - DG Research - Directorate B – “Structuring the European Research Area” Jean-David MALO – Bucharest, February 12-13, NOT LEGALLY.
Danish Agricultural Advisory Service National Centre Possibilities and limits in a Specific Support Action By Erik Fog and Michael Tersbøl, DAAS European.
Participation and dissemination Rules and Contracts FP6.
European Commission - DG Research - Directorate B – “Structuring the European Research Area” Jean-David MALO – Bucharest, February 12-13, NOT LEGALLY.
Megan Richards 6FP - Contract 18 March 2003 Sixth Framework Programme CONTRACTS.
Megan RichardsHeysel 6FP launch conference 11,12, 13 November /11/2002 Rules for Participation and contractual issues for Integrated Projects in.
Financial Guidelines FP6 – IST Directorate C 1 st Evaluation proposals co-ordinators Briefing 17 July 2003.
1 STREPS INTELLIGENT HERITAGE IN FP6. “Traditional Instruments in FP6 ” An outline of the implementation of Specific Targeted Research Projects (STREPs)
E u r o p e a n C o m m i s s i o n - W a r s a w 2002 Sixth Framework Programme Instruments.
Sixth Framework Programme : Contracts è Legal Framework & General Principles è Contract Structure è Collective Approach l signature and entry.
10 February “FP6 Networks of excellence” Colette Renier Research DG.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Participation and dissemination Rules
Presentation transcript:

10/10/ NCP presentation An outline of the implementation of Co-ordination Actions (CAs) in the Sixth Framework Programme (as of October 2002) europa.eu.int/comm/research/nfp/networks-ip.html Co-ordination Actions in FP6

10/10/ NCP presentation Objective è Co-ordination actions (CA) are intended to promote and support the networking and co-ordination of research and innovation activities at national, regional and European level. l by establishing in a coherent way co-ordinated initiatives of a range of research and innovation operators, in order to achieve improved integration of the European research.

10/10/ NCP presentation Activities è CAs combine the following two types of activities l Co-ordination activities  Organisation of conferences, of meetings;  Performance of studies, analysis;  Exchanges of personnel;  Exchange and dissemination of good practice;  Setting up of common information systems  Setting up of expert groups;  Definition, organisation and management of joint or common initiatives. l Project management activities

10/10/ NCP presentation Expected scale è Resources: each CA must assemble the resources needed to achieve its objectives l budget may range from hundreds of thousands up to several millions of € and involve up to several of person-years  but no minimum threshold è Partnership: l minimum of three participants from three different countries  but in practice likely to be more è Duration: typically two to three years  but exceptionally more if duly justified as necessary to deliver the objectives

10/10/ NCP presentation FINANCIAL REGIME (1) è Community support will be in the form of a “grant to the budget” è Paid as a contribution to actual costs l that are incurred, economic and necessary for the project, determined according to own rules l that are recorded in the accounts of the participants  or, when provided for in the contract, in the accounts of third parties l that exclude indirect taxes…

10/10/ NCP presentation FINANCIAL REGIME (2) è Annually, each participant to provide a summary cost statement  certified by an independent auditor (if required)  supported by a management-level justification of costs è Two cost models: l FCF: Full actual direct costs and a flat rate of 20% on all direct costs apart from subcontracting; l AC: Additional cost model covering all non recurring costs and a flat rate of 20% on all direct costs apart from subcontracting.

10/10/ NCP presentation FINANCIAL REGIME (3) è Maximum rates of support for FCF participants l Up to 100% for co-ordination activities l 100% for project management (up to 7% of EC contribution to the project) è AC participants supported at up to 100% of additional costs for all components of the project (+ recurring costs for project management activities)

10/10/ NCP presentation PARTICIPATION/FINANCING

10/10/ NCP presentation EVALUATION PROCESS è Calls for proposals l published in the OJ, via CORDIS web-site, via NCPs è Simplified proposal-making l limited to sufficient “management level” detail è Evaluation by a peer-review system l similar to the one in FP5 è 6 Key evaluation criteria

10/10/ NCP presentation EVALUATION CRITERIA (1) è Relevance to the objectives of the programme  the proposed project addresses the scientific, technical, socio-economic and policy objectives of the work programme. è Quality of the co-ordination  the research actions/programmes to be co-ordinated represent clear progress beyond the current state-of- the-art.  the co-ordination mechanisms are sufficiently robust to bring about the co-ordination envisaged.

10/10/ NCP presentation EVALUATION CRITERIA (2) è Potential impact:  the impact best be achieved if at European level.  the Community support would have a real impact on the action and its scale, ambition and outcome.  The project mobilises critical mass of resources in Europe  exploitation and/or dissemination plans are adequate to ensure optimal use of the project results. è Quality of the consortium  the participants collectively constitute a consortium of high quality.  the participants are well-suited to the tasks assigned to them.  the project combines the complementary expertise of the participants to generate added value.

10/10/ NCP presentation EVALUATION CRITERIA (3) è Quality of the management  the project management is demonstrably of high quality.  there is a satisfactory plan for the management of knowledge, of intellectual property and of other innovation-related activities. è Mobilisation of resources  the project provides for the resources (personnel, equipment, financial…) necessary for success.  the resources are convincingly integrated to form a coherent project.  the overall financial plan for the project is adequate.

10/10/ NCP presentation THE PARTS/CONTENT OF A PROPOSAL PART B PROPOSAL CONTENT Objectives and expected impact Work plan and associated budget The consortium and the project resources Project management Exploitation and dissemination plans Ethics, safety and other issues (where relevant) See Info-Pack/“Guide for Proposers” for precise details PART A

10/10/ NCP presentation PROPOSAL SELECTION PROCEDURE OfficialOfficial Journal CORDISCORDIS NCPsNCPs CALL FOR PROPOSALS Eligibility Check: Commission EVALUATION: Peer review principles/ independent experts NEGOTIATION INFORMATION MARKING AND PRIORITY ORDER OF PROPOSALS Panel (optional) SIGNATURE OF CONTRACT Programme Committee FUNDING SCENARIO(s) Commission

10/10/ NCP presentation CONTRACTUAL ASPECTS (1) è Single contract between EC and (as the case may be): l All the participants l A common legal structure (association, EEIG, etc.) representing them legally è Content of the contract l Core contract  max. EC contribution (co-ordination, management), but no distribution between partners l Technical annex (Annex 1)  subcontracts exceeding limit (as specified in model contract) l General conditions (Annex 2) l Specific conditions (Annex 3)

10/10/ NCP presentation CONTRACTUAL ASPECTS (2) è Rights and obligations of the participants: l consortium agreement l coordinator l collective responsibility l identical intellectual property rules for all participants For More Info See: groups/model-contract/index en.html)

10/10/ NCP presentation IMPLEMENTATION è Work plan l the consortium proposes a detailed plan for the whole duration in the proposal l and may propose to modify the detailed work plan during the execution  but needs approval of the Commission - and  without modifying the overall objectives and deliverables è Community contribution  contract not specify distribution between participants è Changes in the consortium  the consortium may modify its composition (subject to Commission approval, without additional funding, infrequent occurrence)

10/10/ NCP presentation PAYMENTS AND REPORTING SCHEDULE (example of a 3 year contract) Final activity report Reported costs + audit certificate (mandatory) Final payment Periodic activity report (mid-term review : optional) Reported costs + (audit certificate : optional) Intermediate payment/ settlement Detailed work plan Initial advance Months

10/10/ NCP presentation MONIOTORING è Follow-up scheme: l Commission PO assigned l may foresee mid-term review with assistance of experts (if duration >3 years), with a go/no go decision to continue the project l may include technical, financial, technological and/or ethical audits

10/10/ NCP presentation ACCESS RIGHTS

10/10/ NCP presentation Main characteristics è CAs compared to NoEs: l Instrument for ad hoc co-operation between organisations for a specific purpose - no requirement for durable integration of all activities l A networking instrument for research funded from other sources (EC/national/regional) è CAs compared to SSAs: l Instrument for more longer term co-operation and networking compared to the more stand alone activities to be funded by SSAs è CAs compared to IPs and STREPs: l CA is not an instrument to fund research

10/10/ NCP presentation An outline of the implementation of Specific Support Actions (SSAs) in the Sixth Framework Programme (as of October 2002) europa.eu.int/comm/research/nfp/networks-ip.html Specific Support Actions in FP6

10/10/ NCP presentation Objective è Specific Support Actions are intended l to complement the other FP6 instruments, l to help in preparations for future Community research and technological development policy activities and l to stimulate, encourage and facilitate the participation of SMEs, small research teams, newly developed and remote research centres, as well as those organisations from the Candidate Countries in the activities of the priority thematic areas.

10/10/ NCP presentation Activities è SSAs combine the following two types of activities l Support activities  Conferences, seminars, working groups and expert groups;  Studies, analysis;  Fact findings and monitoring;  Trans-national technology transfer and take-up related services;  Development of research or innovation strategies;  High level scientific awards and competitions;  Operational support and dissemination, information and communication activities. l Project management activities

10/10/ NCP presentation Expected scale è Resources: each SSA must assemble the resources needed to achieve its objectives l budget may range from hundreds of thousands up to several millions of € and involve up to several of person-years  but no minimum threshold è Partnership: l Either a single, or a larger number of legal entities,  as specified in the relevant calls for proposals. è Duration: typically two to three years  but exceptionally more if duly justified as necessary to deliver the objectives

10/10/ NCP presentation Call Process è Calls for proposals/Calls for tender l Published in the OJ, via CORDIS web-site, via NCPs è Calls for tender for SSAs l Where the legal entities are identified in the WP l For purchase of a service  The implementation of actions to facilitate the participation of SMEs and small organisations and organisations from the candidate countries will rely on the specific information and assistance structures, including the network of national contact points, established by the Member States and the associated countries at local, regional and national level and will aim at ensuring a smooth transition from the Fifth to the Sixth Framework Programme.

10/10/ NCP presentation EVALUATION CRITERIA (1) è Relevance to the objectives of the programme  the proposal addresses the key issues to achieve or support the objectives defined in the work programme, call, specific programmes or ERA as appropriate. è Quality of the support action  the proposed objectives are sound and the plan of sufficient high quality to achieve the objectives;  the proposer(s) represent(s) a high level of competence in terms of professional qualifications and/or experience;  the proposed activities are innovative and original.

10/10/ NCP presentation EVALUATION CRITERIA (2) è Potential impact  the impact can best be achieved at European level.  the Community support would have a real impact on the action and its scale, ambition and outcome.  exploitation and/or dissemination plans are adequate to ensure optimal use of the project results.

10/10/ NCP presentation EVALUATION CRITERIA (3) è Quality of the management  the project management is credible in terms of professional qualifications, experience, track record and capacity to deliver. è Mobilisation of resources  the project provides for the resources (personnel, equipment, financial…) necessary for success;  the overall financial plan for the project is adequate.

10/10/ NCP presentation Implementation è Same as for CA and STREPs: l Financial regime - funding models FC, FCF and AC l Participation/financing l Submission, evaluation and negotiation process - except that some SSAs can be evaluated by the Commission staff l The contractual structure - specific Annex III for the SSAs l Description of work for the full duration l Reporting, payment schedule and monitoring process

10/10/ NCP presentation Main characteristics è SSAs compared to CAs: l Instrument to support the implementation of the programme, priority or research objective - in most cases - stand alone events (meetings, conferences, studies etc.) l Instrument for future oriented activities: research roadmaps, identification of future research objectives l Instrument for dissemination and uptake of programme results è SSAs compared to IPs and STREPs: l SSA is not an instrument to fund research activities

10/10/ NCP presentation Classification of the instruments

10/10/ NCP presentation INFO INSTRUMENTS è Practical guides to individual instruments are available on the DG Research website: l

10/10/ NCP presentation Need more information? Morten Møller Tel:+32/(0)2/ Fax:+32/(0)2/