R OSTER M ANAGEMENT P ROJECT C LOSEOUT C ERTIFICATION T IM L E M ASTER, D EPUTY S ECRETARY OF O PERATIONS E LONA C RUZ, H UMAN R ESOURCES B UREAU C HIEF.

Slides:



Advertisements
Similar presentations
Unified Communications Bill Palmer ADNET Technologies, Inc.
Advertisements

Information Management and Technology
Copyright © 2006 Quest Software Quest SharePoint Management.
Information Technology Disaster Recovery Awareness Program.
UPS2000 UPGRADE Certification Presentation Project Certification Committee.
1 N EW M EXICO AFIS F AST ID U PGRADE C HANGE R EQUEST C ERTIFICATION N EW M EXICO AFIS F AST ID U PGRADE C HANGE R EQUEST C ERTIFICATION Executive Summary.
Department of Information Technology SHARE New Architecture, Hardware, Disaster Recovery, and System Upgrade Project Update SHARE Service Manager – David.
Department of Information Technology John F. Simms Bldg. Security Upgrade Implementation Certification Project Sponsor, Andrew Griego Project Manager,
Mission Critical Messaging Platform Roni Havas Unified Communications Solution Specialist Specialists Technology Unit – EPG - Microsoft Israel
R ENÉE M ARTÍNEZ (C HIEF I NFORMATION O FFICER ) G REG R IDGLEY (D EPUTY G ENERAL C OUNSEL ) R ICK D E S IMONE (W ATER R IGHTS A BSTRACTING B UREAU C HIEF.
NMDPS - MTD Oversize/overweight Permitting System Project
HP Virtual Tape Library (VTL) Appliance Powered by IPStor Ross Parker – Sales Director, Northern Europe.
P3, M2,M3,M4.
MUNIS Platform Migration Project WELCOME. Agenda Introductions Tyler Cloud Overview Munis New Features Questions.
Case Study: Business Continuity Planning for Site- Level Disaster Kimberley A. Pyles Northrop Grumman Corporation
Web Plus Overview Division of Cancer Prevention and Control National Center for Chronic Disease Prevention and Health Promotion CDC Registry Plus Training.
Building a Business Case for Disaster Recovery Planning - State and Local Government Chris Turnley
11 Public Safety Recording – Sharing Resources Quality, Accountability, Reliability. and Performance for the Mission-critical Environment Western Regional.
MCITP Guide to Microsoft Windows Server 2008 Server Administration (Exam #70-646) Chapter 11 Windows Server 2008 Virtualization.
1 |© 2006 Citrix Systems, Inc.—All rights reserved. CoxCONNECT Case Study: Universal Access supported by a fully redundant infrastructure spanning multiple.
Chapter 9 - Control in Computerized Environment ATG 383 – Spring 2002.
Chapter 12 Strategies for Managing the Technology Infrastructure.
1 Chapter 7 IT Infrastructures Business-Driven Technology
Preservasi Informasi Digital.  It will never happen here!  Common Causes of Loss of Data  Accidental Erasure (delete, power, backup)  Viruses and.
Barracuda Networks Confidential1 Barracuda Backup Service Integrated Local & Offsite Data Backup.
StorCast Enterprise Storage Resource Management. What is Enterprise Storage Resource Management?
Services Tailored Around You® Business Contingency Planning Overview July 2013.
Why Interchange?. What is Interchange? Interchange Capabilities: Offers complete replacement of CommBridge point-to-point solution with a hub and spoke.
Server Types Different servers do different jobs. Proxy Servers Mail Servers Web Servers Applications Servers FTP Servers Telnet Servers List Servers Video/Image.
PHASE 3: SYSTEMS DESIGN Chapter 8 System Architecture.
Hands-On Microsoft Windows Server 2008 Chapter 1 Introduction to Windows Server 2008.
Presented By: MICHAEL HOFFMAN President & CEO - Bolt Data Systems June 16, 2010 Data Backup for the Shared Platform.
Module 13: Configuring Availability of Network Resources and Content.
Computer Based Testing Security & Administration 2007 North American Pesticide Applicator Certification & Safety Education Workshop Portland Maine 2007.
Centralized Management Services Dawn Malinowski Wisconsin Public Power Inc Sun Prairie, WI.
HBCU National Workshop June 24, 2011 Disaster Recovery Reggie Brinson Assoc. VP/Chief Information Officer Clark Atlanta University.
Chapter Fourteen Windows XP Professional Fault Tolerance.
What is Ubiquity™? ubiquity (noun): the state of being, or seeming to be, everywhere at once Ubiquity™ is a powerful building management system that.
Chapter © 2006 The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/ Irwin Chapter 7 IT INFRASTRUCTURES Business-Driven Technologies 7.
Preventing Common Causes of loss. Common Causes of Loss of Data Accidental Erasure – close a file and don’t save it, – write over the original file when.
Unit – I CLIENT / SERVER ARCHITECTURE. Unit Structure  Evolution of Client/Server Architecture  Client/Server Model  Characteristics of Client/Server.
A Document Management Solution Joe Axne IT-GURU LLC
Computer Emergency Notification System (CENS)
7-1 Management Information Systems for the Information Age Copyright 2004 The McGraw-Hill Companies, Inc. All rights reserved Chapter 7 IT Infrastructures.
OCTAVE-S on TradeSolution Inc.. Introduction Phase 1: Critical Assets and threats Phase 2: Critical IT Components Phase 3: Changes Required in current.
1 Week #10Business Continuity Backing Up Data Configuring Shadow Copies Providing Server and Service Availability.
E.Soundararajan R.Baskaran & M.Sai Baba Indira Gandhi Centre for Atomic Research, Kalpakkam.
Chapter 5 McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Enterprise Architectures.
Chapter 5 McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
1 IBM TIVOLI Business Continuance Seminar Training Document.
Catawba County Board of Commissioners Retreat June 11, 2007 It is a great time to be an innovator 2007 Technology Strategic Plan *
ORGANIZING IT SERVICES AND PERSONNEL (PART 1) Lecture 7.
IT Priorities Minimize CAPEX Maximize employee productivity Grow the business Add new compute resources real- time to support growth Meet compliance requirements.
Luminex Virtual Tape Storage System Brian Sullivan Director of Computer Operations Broward County Public Schools 1.
Install, configure and test ICT Networks
INNOVATE THROUGH MOTIVATION MSP Services Overview KEVIN KIRKPATRICK – OWNER, MSP INC LOGO.
Business Continuity Disaster Planning
Unit 1: IBM Tivoli Storage Manager 5.1 Overview. 2 Objectives Upon the completion of this unit, you will be able to: Identify the purpose of IBM Tivoli.
Information Technology Proprietary and Confidential © Copyright 2007 – Peralta Community College District.
Chapter 6: Securing the Cloud
Enterprise Storage at the Institute for Advanced Study
BEST CLOUD COMPUTING PLATFORM Skype : mukesh.k.bansal.
Client/Server Databases and the Oracle 10g Relational Database
Chapter 21: Cloud Computing and Related Security Issues
IT INFRASTRUCTURES Business-Driven Technologies
Website Content Management System (CMS)
Office of Superintendent of Insurance OSI Paperless, Web-based Environment – Project Change Request Presented to the DoIT Project Certification Committee.
PLANNING A SECURE BASELINE INSTALLATION
Capitalize on Your Business’s Technology
Presentation transcript:

R OSTER M ANAGEMENT P ROJECT C LOSEOUT C ERTIFICATION T IM L E M ASTER, D EPUTY S ECRETARY OF O PERATIONS E LONA C RUZ, H UMAN R ESOURCES B UREAU C HIEF C ELESTINO R OMERO, H UMAN R ESOURCES D EPUTY B UREAU C HIEF D ON D ORSEY, D EPUTY D IRECTOR, A DULT P RISONS H ELEN C ARR, D EPUTY D IRECTOR, A DULT P RISONS

 Replace NMCD Legacy DOS-based Time Reporting System with current web-enabled system, InTime  Centralize storage of time data leveraging NMCD ITO fault-tolerant infrastructure  Create interface from InTime system to DoIT SHARE PeopleSoft system (Phase II)

 Roster Management supports Agency Strategic Plan : Program 6: Program Support, Objective #PS-4 by providing an IT environment that maximizes communication, data sharing, data access capability, a common network platform, routine system-wide backups and common software applications.  Roster Management supports State Strategic IT plan : Reducing the cost of government operations Reducing the cost of IT through Enterprise Model Through reduced overtime required for data re-entry, a yearly cost savings of $50,000 will be realized.

Roster Management 2007 NMCD General Fund Amount: $295, ItemProjected CostActual CostMetrics Professional Services $46, First Year Savings:$148, InTime Software $151, Subsequent Year Savings:$50, InTime Interface (Phase II) $98,124.00$0.00 Percent Over/Under Budget:33% Under Total$295,728.00$197, Cost Performance Index:1.5 The NMCD Project Team completed Phase II activities in-house, along with DoIT SHARE Time/Labor Team, saving the project budget $98,124.00

 Backups – Occur daily with offsite storage in vault at State records  Disaster Recovery – Leverage previous project “Build a Fault-Tolerant Environment”, via a highly-available, load balanced web farm  Security – Work in tandem with DoIT security staff to ensure effective protection, each facility protected via Juniper enterprise firewall for physical separation from Administrative and Education networks. All servers and workstations use anti-virus, anti-spam and internal firewall  Impact to DoIT System hosted at Corrections Six data files per week sent to DFA ftp site for normal SHARE batch process. Manual file handoff process in place with SHARE Time/Labor Team in the event ftp site down.

T HANK Y OU !