2 nd Intermediate Meeting Portorose (SLO) 14 -15/03/2013 WP 3 - Pilot Project Presentation Municipality of Cervia – PP1 Javni razpis št. 02/2009: SALTWORKS.

Slides:



Advertisements
Similar presentations
Emilia-Romagna Region (PP6) Project Progress Katia Raffaelli, Luisa Perini, Maria Romani Adriatic Sea regional meeting Kotor, 27th March 2007.
Advertisements

Biobank of Wallonia Biobank of Wallonia: Co-operation between researchers & commercial companies: dream or reality? 18 June 2010 Philippe Van der Hofstadt.
01 Prologo 02 Bran 103 Catelyn 1 05 Eddard 1 04 Daenerys 1 06 Jon 1 07 Catelyn 2 10 Tyrion 1 08 Arya 1 16 Sansa 1 09 Bran 2 11 Jon 2 12 Daenerys 2 13 Eddard.
VALORIZZAZIONE E FRUIZIONE DEI BENI CULTURALI IN SARDEGNA OPEN DAYS 8 th European Week of Regions and cities REGIONE AUTONOMA DELLA SARDEGNA Italy Regional.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 29.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 112.
WORK PLAN WP1. OBJECTIVE To define criteria for assessing teachers training practices that facilitate the use of ICT to promote an effective learning.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Cultural Heritage in REGional NETworks REGNET Quality Assurance – D14.
Report from the 7th GEO S&T Committee Meeting Gilles OLLIER – Policy Officer « Earth Observation » EUROPEAN COMMISSION Research Directorate General - Environment.
Review of Fiscal Law December 18, 2002 DRAFT. Change Management Center 2 DRAFT Overview Purpose & Objective Challenges Assertions Partnership Basic Approach.
PROJEKT INTERREG III B CADSES PLANCOAST Constanta Marcin Grzybiński – Voivodeship Office for Spatial Panning in Slupsk.
POLISH PRESIDENCY IN THE EU: COHESION POLICY AND EVALUATION-RELATED ACTIVITIES Presentation of Objectives and Programme Stanisław Bienias, Ministry of.
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
WARC 14/15 - S.S.O.R.T. / ByeBye / / KI. UM DIE WELT SEGELN ByeBye-Party Gstaad WARC 14/15 - S.S.O.R.T. / ByeBye / / KI.
Public-Private Development in Historic Savannah. SAVANNAH in the 1750s.
Break Time Remaining 10:00.
SABINA PASSAMONTI, team manager Università degli Studi di Trieste Dipartimento di Scienze della Vita Lead Partner TRANS2CARE Network of Research: Focus.
INAR 342 FINISHING. INAR 342 : FINISHING Aim of the Course This course is designed to heighten the students understanding of the rules and principles.
Alabama State Port Authority Infrastructure for Tomorrows Market October 2005.
Federal Aviation Administration FAA Airports Programs Update IRWA Federal Agency Update Washington, DC March 24, 2014 Rick Etter FAA Office of Airports.
WP 2 – Best practice for fruition of sites Municipality of Cervia – PP1 Responsible partner: PP1 Cervia Municipalty Javni razpis št. 02/2009: SALTWORKS.
2 ND INTERMEDIATE MEETING WP 5 Promotion and marketing WP 5.1 & WP 5.3 Ref. 2/2009: SALTWORKS– Valorizzazione ecosostenibile delle saline tra Italia e.
15. Oktober Oktober Oktober 2012.
JACK JEDWAB ASSOCIATION FOR CANADIAN STUDIES MAY 2013 ENGLISH OR FRENCH ON THE DECLINE IN QUEBEC? VIEWS FROM THE ROC.
Presented to: Minnesota Chamber of Commerce October 1, 2012.
Watershed Staff Videoconference October 17, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
Erasmus Mundus – Phoenix Europe - Palestine, Jordan, Syria and Lebanon Intercultural Exchange For Internationalization: Research Management, Student employability.
Towards a Worcestershire Green Infrastructure Strategy WPEG, 5 September 2012 Marta Dziudzi Planning Policy Assistant Strategic.
Medway Valley Heritage Forest Environmentally Significant Area Phase One - Conservation Master Plan Community Information Meeting July 25, :45 –
Clock will move after 1 minute
Weekly Attendance by Class w/e 6 th September 2013.
Highlights From the Survey on the Use of Funds Under Title II, Part A
R Street Improvement Project (30% Review Meeting) February 28, 2007 August 20, 2008 City of Sacramento R Street Market Plaza Project 16 th Street to 18.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Harlingen 100 Revitalization Task Force Annual Progress Report Meeting December 9, 2008.
Economic cooperation projects between Ita-Slo in the cross-border region and their impact on enterprises iCON: Competitiveness of SMEs through Innovation.
2 ND INTERMEDIATE MEETING WP4 Didactical labos, presentation of proposal of didactical labos in the saltpans, issues, activities, calendar Ref. 2/2009:
2 days workshop Portorož Marko Školaris Portorož/Portorose 16. – 17. February 2011.
Competitiveness of SMEs through Innovation and Collaborative Entrepreneurship: the iCON project Alpe Adria Audiovisual: the AAA Cluster Friday, 4 th July.
Transportation Center Rolling Forward Into Phase 2 October, 2008.
2 days workshop Portorož – day 2 Marko Školaris Paolo Perucci Portorož/Portorose 16. – 17. February 2011.
Discussion and Possible action on the historic designation by the City of Laredo Landmark Board on certain LISD Schools.
INTERMEDIATE MEETING WP4 Realisation of didactical activities Ref. 2/2009: SALTWORKS– Valorizzazione ecosostenibile delle saline tra Italia e Slovenia.
Forum on Cross-Border Integration The production systems’ internationalisation (Main Conclusions) iCON: Competitiveness of SMEs through Innovation and.
C ultural H eritage and U rban D evelopment CHUD Tyre - Beit El Madina 21 Oct 2010.
Kick off Conference and Forum of CB integration of strategic projekt iCON Creativity and Innovations in SMEs iCON: Competitiveness of SMEs through Innovation.
Local endogenous development and urban regeneration of small alpine towns ‘ ‘ ’ ’ A trans-national project co-financed by ERDF funding in the framework.
Kick off Conference and Forum of CB integration of strategic projekt iCON Infrastructure and services in support of innovations iCON: Competitiveness of.
1 U.C. Pianificazione Territoriale e P.T.R.C. “ALPCITY” VENETO CASE-PROJECTS Renovation and optimum use of abandoned rural and productive buildings 2 0.
Public Participation in the SEA of Master Plan of Yerevan City in Armenia Sona Ayvazyan, Team Leader UNDP Pilot SEA Project as the Capacity Building Tool.
WP 3 Training activities 2013 Author: M Scocchi LP PROJECT MEETING - Vipava, 11th February 2013.
Forum čezmejne integracije
FLORIDA’S CAPITOL BUILDINGS
Forum čezmejne integracije
Title Title Title title title
Information seminar for FLC and project partners
Review of Parks Canada’s Planning Permit Process
Review of Parks Canada’s Planning Permit Process
Presentation transcript:

2 nd Intermediate Meeting Portorose (SLO) /03/2013 WP 3 - Pilot Project Presentation Municipality of Cervia – PP1 Javni razpis št. 02/2009: SALTWORKS - Ekolosko trajnostno vrednotenje solin med Italijo in Slovenijo Bando pubblico n. 02/2009: SALTWORKS - Valorizzazione ecosostenibile delle saline tra Italia e Slovenia

Cervia, Pilot Project – External renovation In Cervia Saltpans, the pilot project had as purpose the restoration and the internal preparation of the ancient Hexagonal Aqueduct Tower to be used as a starting point for a cultural itinerary in the Saltpans. The Tower, not used in the last years, has a good location near the Saltpans’ Visitor Center. Thanks to the up-coming inside multimedia equipment, it will be possible to introduce new historical and scientific contents increasing the cultural and didactical Saltpan offert. 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

Cervia, Pilot Project – External renovation The Cervia’s Pilot Project has been recently changed because the planned Mooring Area, has not been authorized by State Forester Corps. Therefore the Municipality has decided to redevelop the outstanding Tower area that aims at reclaiming it from pollutant materials too (as “eternit”). 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

Cervia, Pilot Project Location New town Old town 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

WP 3 Work Team RefereeProject Role Venturi Gianna – Responsabile del Servizio Attività economiche e del Servizio Parco della salina Team Manager Gasperoni Roberta Management and project reporting Di Martino Elisabetta – Responsabile Ufficio Europa Administrative activities and reporting management Bottari Stefano – Servizio Progettazione Management of the Pilot Action (wp3) 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

Pilot Project actions – External renovation The Restoration of the hexagonal Aqueduct Tower The Design of a multimedia information point for the discovery of Cervia’ s Old Town 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

Pilot Project actions – External renovation Renovate the walls Cornices and string courses consolidation, tank cover waterproofing New flooring New outside pavement area Environmental redevelopment of a new external area 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

Pilot Project actions– Internal preparation Interior design: Interactive floor, multimedia panels; Virtual map tours, that illustrate the Cervia’s territory evolution ( 6 languages) 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

Cervia, Pilot Project: Phases & State of the art Feasibility study – approved on On Approval of the preliminary draft and the beginning of the final phase design On Final draft has obtains a positive opinion from the Private Building Service On positive opinion from the Quality Architectural and Landscape Commission 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

Cervia, Pilot Project: Phases & State of the art On the State Property Agency, gave a positive opinion to preliminary draft On , the Architectural Heritage and Cultural Activities Authority, authorized the implementation of the project 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

Cervia, Pilot Project: Phases & State of the art On The State Forester Corps, Territorial Office of Biodiversity, gave: - a positive opinion on the Tower project to recover the surrounding areas; - a negative opinion for a new docking point for boats to ensure an environmental and wildlife protection. 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

Cervia, Pilot Project: Phases & State of the art Following the denied opinion, it was decided to proceed with a new project that includes the Tower surrounding area: - Demolition of the building nearby the Tower that looks dilapidated and build with poor materials - Remove the asbestos- cement cover; - The renovation of the area 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

Cervia, Pilot Project: State of the art The final design was approved the last 18 December. Currently the work team is concluding the final design. The work completion is expected to the end of October 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

Grazie per l’attenzione! Hvala za vašo pozornost! Roberta Gasperoni Progetto finanziato nell'ambito del Programma per la Cooperazione Transfrontaliera Italia-Slovenia , dal Fondo europeo di sviluppo regionale e dai fondi nazionali Projekt sofinanciran v okviru Programa čezmejnega sodelovanja Slovenija-Italija iz sredstev Evropskega sklada za regionalni razvoj in nacionalnih sredstev Ministero dell'Economia e delle Finanze