HOLDEN HEIGHTS PHASE IV FY Budget Worksession July 21, 2008
Background Project Description Funding Summary PRESENTATION OUTLINE
Background Project Description Funding Summary PRESENTATION OUTLINE
BACKGROUND Holden Heights Community
BACKGROUND
Lake June and Clear Lake Contamination –Historical Water Quality Violations (1970s and 1980s) –1995 Water Quality Study –Failing Septic Tanks –Untreated Stormwater Runoff BACKGROUND
Eliminate Septic Systems Central Sanitary Sewer Install Closed Stormwater System Improve Existing Roadways Sidewalk Improvements BACKGROUND
Phase 1 –$5.8M –Completed 2003 BACKGROUND
Phase 2 –$11.2M –Completed 2006 BACKGROUND
Phase 3 –$14.6M –Under Construction BACKGROUND
Funding Partners – Phases 1, 2, and 3 –Orange County –Orlando Utilities Commission –Environmental Protection Agency (EPA) –South Florida Water Management District –Housing and Urban Development (HUD) BACKGROUND
Phase 4 –Preliminary Engineering Report Complete BACKGROUND
Background Project Description Funding Summary PRESENTATION OUTLINE
Sanitary Sewer Stormwater Improvements Roadways/Sidewalks Potable Water Lake June Sidewalk Amenities PROJECT DESCRIPTION
Background Project Description Funding Summary PRESENTATION OUTLINE
Estimated Construction Cost - $5.3M –Orange County Utilities: $2.2M (funded) –OUC: $700K (funded) –Public Works: $2.4M (unfunded) FUNDING
Proposal: –Utilize CDBG funding for Public Works infrastructure $500K Design (FY ) $2.4M Construction (future) –Utilize Orange County/OBT CRA Funding for Lake June Sidewalk Amenities $150K (FY ) FUNDING
Background Project Description Funding Summary PRESENTATION OUTLINE
Three Phases Completed CRA Redevelopment Plan Consistency Leverage Available Funding Resources Final Phase of Holden Heights Infrastructure SUMMARY
HOLDEN HEIGHTS PHASE IV FY Budget Worksession July 21, 2008