Construction Project management Prepared by: Muath Saadeh Saadeh Abu-Sa’da Kamel Beshara.

Slides:



Advertisements
Similar presentations
GRO Project Management Handbook
Advertisements

PROJECT MANAGEMENT BASICS
RESEARCH PROPOSAL DR.URJA MANKAD.
INAR 342 FINISHING. INAR 342 : FINISHING Aim of the Course This course is designed to heighten the students understanding of the rules and principles.
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
An-Najah National University Faculaty Of Engineering Civil Department Construction PROJECT MANAGEMENT CONSTRUCTION PROJECT MANAGEMENT Prepared by: sameh.
SWE Introduction to Software Engineering
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Chapter 10: Monitoring and Controlling Change
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
Software Engineering Project Management (CS - 413)
Introduction to Project Management The Basics for Sustainability Management Students.
Project Management “Introduction to Project Management: Tools, Techniques, and Practices” BA 320 Operations Management.
The Project Management Body of Knowledge (PMBOK)
Using Earned Value Management System (EVMS) Briefing for ATC Engineering & Test Division (ACT-200) Managers and Leads.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Project Management Framework. PMBOK ® Guide, Third Edition.
Software Project Management By Assistant Prof. Samana Zehra
Software Project Management Course Instructor Samana Zehra (Assistant Professor)
Project Management Fundamentals Project Organization and Integration
Project Management Methodology Project monitoring and control.
Controlling cost ( lecture + seminar ). Why control cost? To satisfy financial auditors and support data for the government (obligatory). To satisfy the.
Human Resources Management Course Objectives The purpose of this course is to learn the Project Management Institute (PMI) processes required to make.
Project Management: Madness or Mayhem
4.2 Develop Project Management Plan
Project ManagementDay 1 in the pm Project Management (PM) Structures.
An-Najah National University Engineering Faculty Civil Engineering Department Submitted in partial fulfillment of construction project management for the.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
05/19/08 PM Boot Camp I International Sign Association Risk/Regulatory Compliance Department Las Vegas Division.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
MGT 461 Project Management Institute Knowledge Areas
EARNED VALUE MANAGEMENT (EVM)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Construction PROJECT MANAGEMENT Supervisor : E. Barraq Jumaa Prepared by: Ahmad Faqra Amjad Zarour Nidal Haroon.
Stage III: Project Execution and Control Earned Value Analysis B: Chapter 8: pages B: Chapter 12: the entire chapter.
Project Management Process Groups and Knowledge Areas Source: PMBOK 4 th Edition Prepared
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Project Management An Introduction to Project Management Supervisor :eng. Baraq Juma’a Prepared by: Khaled Mohammad Sawalha Suha Tarek Awwad
C ONSTRUCTION PROJECT MANAGEMENT Submitted in partial fulfillment of construction project management for the bachelor degree in civil engineering Fuad.
Construction Project Management Prepared By: Omar Al-Taher Supervised By: Dr Baraq Jum’aa.
What is the “Project”? A temporary endeavor undertaken to create a unique product or service.
7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Project Management Training
Basic Project Management Process Basic Project Management Process Larry Creel July 11, 2003.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
The Project Management Process Groups
Fundamentals of Project Management and Schedule Development.
B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM MAGISTER ILMU KOMPUTER (M.Kom) IS PROJECT MANAGEMENT.
Introduction to Project Management Lecture 1 HNC/D Project Management.
Information Systems Project Management
Project Management PTM721S
Construction Project management
{Beir Ziet Secondary Boys School }
Earned Value Management
An introduction to Earned Value Management Simplex project management Education|Training|Mentoring|Coaching|Consulting.
Construction Project Management
Construction Project Management
An-Najah National University
Construction Project Management
Construction Project management
Lecture # 3 Software Development Project Management
Construction Project Management
Managing Project Work, Scope, Schedules, and Cost
Introduction to Project Management
Working with Project Management Processes
Presentation transcript:

Construction Project management Prepared by: Muath Saadeh Saadeh Abu-Sa’da Kamel Beshara

Allar Municipality building Graduating project consist two parts : *The first part include preparing a theoretical research. * The second part includes the application of the principle in construction project management.

Contents Project Time Management Project Quality Management Introduction Project Scope Management Project Cost Management

Project Communications Management 6 6 Contents Project Human Resource Management 7 Project Integration Management 8 Project Risk Management 9 Project Procurement Management 10

What is Project? * Project is the collection of activities, that are related or connected, for developing a product or a service, * Projects have always start and end times. * Projects have always a customer who uses the results.

Cycle define project unique timescale budget Limited resources Projects

Define Project Management What is Project Management? Project Management is the skills, tools and management processes required to undertake a project successfully. It is a set of principles, practices, and techniques applied to lead project teams and control project schedule, cost, and performance risks to result in delighted customers. What is the Project Management Body of Knowledge (PMBOK)? The Project Management Institute has identified nine topic areas to define the scope of project management knowledge as follows: scope, integration, time, cost, quality, human resources, communications, risk, and procurement.

Brief Description Part Two The building located in Allar village near Tulkarem city in the western strip of village Allar municipality building is a 3 floor building consist of basement floor and 2 floors above the ground surface the basement contain a sport Jim and storage hall the ground floor (first floor ) contain a twelve storage rooms the second floor contain the employees offices and meeting and lecture hall The area of the basement is m 2 and the first floor area is m 2 same as the second floor and the area the stairs and elevator section is 43.20m 2 of the area of the land which the building is constructed in is m 2

Drawings of Project:

Allar Municipality Building First will be planned for the project normally and calculating the duration of the project and the total cost of project The purpose of our study is to obtain the final cost, and duration for it. In order to obtain these values we followed the following steps:

Allar Municipality Building 1- Work breakdown structure: The project is divided into activities in a process called work breakdown structure. In this project we breakdown in the following:

Allar Municipality Building 2- Calculate the cost

Allar Municipality Building 3-Schedual planning by primavera 6.0

Allar Municipality Building Total project cost = NIS Profit & Overhead 20% from total cost The cost of structural work is = NIS The cost of mechanical work is = NIS The cost of electrical work is = NIS The cost of finishing work is = NIS Project start 04-Jul-2010 and end in 09-Jul-2011 Project duration 318 work day Calendar 6day work in week Results

Update project After the work schedule and start the implementation, we need to update the project data into compare the project actually and the planned project and the impact on the schedule. Update date

Earned Value CPI EVA SPI Earned value Update project Earned value Reporting-Costs: Earned value Reporting-Schedule:

Earned Value From this table we calculate the following: Schedule Performance Index (SPI) =0.89 or SPI=BCWP/BCWS= / =0..89 <1 SPI<1 behind Schedule (Project delayed)

S-Curve Update line PCWS (PV) EAC PCWP (EV)

Muath, Saadeh, Kamel