Trevor Andrews Holli Monroe Emily Piccione William Wright.

Slides:



Advertisements
Similar presentations
Micro Control Solutions Stability System II rev. 6.4
Advertisements

A separate output can be initiated after a set number of consecutive failures to stop feed. The Tecscan Boardwatcher examines colour blocks, one for each.
Trevor Andrews Holli Monroe Emily Piccione William Wright.
Trevor Andrews Holli Monroe Emily Piccione William Wright.
Trevor Andrews Holli Monroe Emily Piccione William Wright.
Process and Procedure Documentation. Agenda Why document processes and procedures? What is process and procedure documentation? Who creates and uses this.
Red Flag Rules: What they are? & What you need to do
Stability Tools TPM What is TPM ?
Trevor Andrews Holli Monroe Emily Piccione William Wright.
Revision.
Trevor Andrews Holli Monroe Emily Piccione William Wright.
Achieving Strategic Energy Management Goals through Blended Learning in New York City International Conference on E-Learning in the Workplace Columbia.
Benchmark and Java Applet Test Scenario Presentation Outline Introduction to Benchmark Testing Procedure to create the test Benchmark Playback Results.
Project Control Techniques
Trevor Andrews Holli Monroe Emily Piccione William Wright.
Concept Generation Facts –Concepts are best generated by individually –Concept selection is best performed by groups Opinion –Systematic “Idea generation”
System Level Design Review P10054 October 9, 2009 Monitoring Device for Human Smoking Behavior.
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
1 Overview of Usability Testing CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology April 19, 2007.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Readiness Index – Is your application ready for Production? Jeff Tatelman SQuAD October 2008.
Department of Electronics & Communication
1. Menu File | Acquisition | Simple 2. Type in a name for the participant 3. Click on the ”Go” button to start recording Ticking this box will prevent.
The Traffic Light Social Studies 9 Ms. Rebecca 2009.
1 Introducing BSI Health & Safety Self-assessment Online.
ANTI LOCK BRAKING SYSTEM
Elements of Internal Controls Preventing Fraud, Waste, and Abuse in Urban and Rural Transit Systems.
Key Performance Indicators - KPI’s
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Client Logo LEAN ENTERPRISE Implementation Workshop.
Project Management for RIM Professionals Last Updated: 3/13/2011 Sarina Arcari, PMP VP Implementation & Product Planning Amerigroup Corporation 3/15/11.
Developing Workflows with SharePoint Designer David Coe Application Development Consultant Microsoft Corporation.
Chapter 1.5 Health and Safety at Work Act 1974 (HASAWA)
Experiments Day 1 Resistors.. Electronic Technology Definition: The technology of using small amounts of electricity for controlling, detecting, collecting,
The Institute and the Profession: 1 Personalize your title and presenter here. The Institute and the Profession The Institute and the Profession: 1.
Trevor Andrews Holli Monroe Emily Piccione William Wright.
Advance to the next slide when ready to start $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 Sample.
 We will now consider the precontrol chart and the individual X and MR chart.  Techniques are similar to the charts we.
37 Copyright © 2007, Oracle. All rights reserved. Module 37: Executing Workflow Processes Siebel 8.0 Essentials.
Scientific Method Activity:  Problem: Are the colors equally represented in a pack of milk chocolate M&Ms?  Hypothesis: I think there will be 19 M&Ms.
Yellow Belt Training 10 Step Kaizen Process
P15080: Flow Culture System Multi-Disciplinary Senior Design Problem Definition Review September 11, 2014 Collin Burkhart – Lead Mechanical Engineer Katelyn.
MSD Total Supplier Performance and Inventory Control
PART TWO Electronic Color & RGB values 1. Electronic Color Computer Monitors: Use light in 3 colors to create images on the screen Monitors use RED, GREEN,
A stop sign is a traffic sign that stands for coming to a complete stop at an intersection or end of the road.
Irrigation Water Management: Opportunities and Results Presented by: Paul Stoker, Executive Director Columbia Basin Ground Water Management Area.
Supply Chain Progress towards Aeronautical Community Excellence An efficient Supply Chain to meet new global challenges An efficient.
ANSI Safety Colors Engineering Concepts. ANSI The American National Standards Institute has served as administrator of the US private sector standardization.
3.2 Your strategic MES partner.
Traffic Signals and Pavement Markings
Environmental Health and Safety (EH&S) Supplier Awareness Training
Subtitle or Speaker, Role in Project, Institution
Health Monitoring of Aging Aircraft Structures
Ageing Management Session Name: Principles of Ageing Management
Status Report - xx/xx/xx Workstream XX
Management of HAVS – A Contractors View
Mechanical Andon Systems: Electrical Andon System with Monitoring:
Introduction to LabVIEW
Jidoka Tyler Newton OpertMgt 345 Training Presentation “Jidoka”
List as many observations as you can see before the timer goes off.
Modern Systems Analysis and Design Third Edition
ECE Computer Engineering Design Project
Management of HAVS – A Contractors View
Risk Assessment: an example
Process and Procedure Documentation
ANSI Safety Colors Engineering Concepts.
Electrical Andon System with Monitoring: Mechanical Andon Systems:
! Delete Slide There are five common variations for operator training
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Trevor Andrews Holli Monroe Emily Piccione William Wright

1. Planning & Execution 1. Project Summary 2. Customer Needs 3. Specifications 4. Project Plans & Schedules 2. Systems Design 1. Benchmarking 2. Concept Generation 3. Functional Decomposition 4. Process Flow Chart 5. Risk Management

1. Project Summary 2. Customer Needs 3. Specifications 4. Project Plans & Schedules

In order to improve quality on the four-station assembly line within the Toyota Production Systems Lab at the Rochester Institute of Technology, two andon systems and a corresponding monitoring system are to be developed.  One andon system is to be a typical system consisting of simple electronics.  The other andon system is to be purely mechanical in nature.  In order to highlight and record abnormalities, which can later be used to perform root cause analysis and develop preventative countermeasures, a monitoring system will be designed alongside the andon systems. For more on Project Summary consult EDGE webpage.EDGE webpage

For more on Customer Needs consult EDGE webpage.EDGE webpage

For more on Specifications consult EDGE webpage.EDGE webpage

For more on Project Plans & Schedules consult EDGE webpage.EDGE webpage

1. Benchmarking 2. Concept Generation 3. Functional Decomposition 4. Process Flow Chart 5. Risk Management

In order to better our understanding of andon systems, we will be participating in a visit to The Raymond Corporation plant in Greene, New York on January 11, For more on Benchmarking consult EDGE webpage.EDGE webpage

For more on Concept Generation consult EDGE webpage.EDGE webpage

For more on Concept Generation consult EDGE webpage.EDGE webpage

For more on Concept Generation consult EDGE webpage.EDGE webpage

For more on Concept Generation consult EDGE webpage.EDGE webpage

For more on Concept Generation consult EDGE webpage.EDGE webpage

For more on Concept Generation consult EDGE webpage.EDGE webpage

For more on Concept Generation consult EDGE webpage.EDGE webpage  Rev. 1 of LabVIEW VI.  Will mimic existing andon systems.  Designed specifically for TPS Lab.

For more on Functional Decomposition consult EDGE webpage.EDGE webpage Ensure Quality Train Operators Standardize Process Approve Part Recognize Abnormality Activate System Recognize Signal Sense Trigger Activate Program Activate electrical system Lights Speakers Activate mechanical system Flags Record Activation Record Station ID Record Error Color Start Timer Deactivate System Recognize Signal Sense Trigger Deactivate Program Deactivate electrical system Lights Speakers Deactivate mechanical l system Flags Record Activation Stop Timer Calculate Time Lapse Calculate Production Loss Determine yellow-to- red escalation value Log Abnormality

For more on Process Flow Chart consult EDGE webpage.EDGE webpage

For more on Risk Management consult EDGE webpage.EDGE webpage