How to Convert and Optimize Primary/Secondary Pumping Systems

Slides:



Advertisements
Similar presentations
COIL PIPING BEST PRACTICES
Advertisements

A CASE STUDY in actual energy conservation
Energy-Efficient Process Cooling
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
Facilities Management Utilities & Engineering Services Duke CHWP-2 RECLAIM WATER DU-107-PP.
Next Generation Belimo Energy Valve 1Belimo Americas Danbury, Connecticut.
Use of Operational Data for diagnosing symptoms and optimizing HVAC operation at Zero cost Presented by: Hemant Mehta, P.E. March 30, 2010.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Chilled Water Piping Systems (VPF Focus)
Booster System Basics: Constant Speed Systems
Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
Energy Efficient Fluid Flow
Energy Efficient Fluid Flow. Fluid Flow System Fundamentals W motor = W fluid / (Eff motor x Eff drive x Eff pump )
Marine Auxiliary Machinery
Energy Management with the use of an Intelligent Building Management System.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
CHW Optimization Case Studies
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Energy Valve Delta T Manager
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Piping Systems.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Chilled Water Systems Total Cost of Ownership
The Cost of Using 1970’s Era Design Concepts and “FEAR”in Chilled Water Systems WM Group Engineers, P.C. Presented By: Hemant Mehta, P.E.
1 Multi-use Facility. 2 Occupancy – 140 persons Building Characteristics Single story 20,000 square feet (250’ x 80’) Standard construction.
Grundfos FLOW THINKING Air conditioning the Grundfos Way.
Important variables Water: Air: Conversion:
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Temperature Control Loop
1 Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
City of Hope Amini Medical Center Christopher Bratz Pennsylvania State University Architectural Engineering Mechanical Option Faculty Advisor: Dr. Jelena.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
The Importance of Distribution. Manifold Position And Vapor Trail.
Alex Gee Jon Locke Joe Cooper Kylie Rhoades Clara Echavarria Ice Energy Extraction.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
1 Hospital Building and Campus Piping. 2 Hospital Building Occupancy – office and patient areas Patient areas: 24 hours per day Office areas: 8 am – 5.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 10 : CONTROL VALVES IN CLOSED LOOP SYSTEMS.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
AstraZeneca R&D Boston Waltham Energy Reduction Initiative 2016 Green Labs Symposium.
Lecture Objectives: Learn about thermal storage systems
Sustainability Best Practices
The Data Center Challenge
Lecture Objectives: Discuss Final Project
Energy Savings Projects
HVAC EQUIPMENT: COOLING SOURCES (see Chapter 16)
By: John D. Villani, P.E., LEED AP, QCxP, CEM, GBE
Energy Efficiency in District Coiling System
Traditional Water Booster System
Air Conditioning System-1
System Curve Example Design Condition 20 ft.w.c. required each way to deliver design flow to and from the headers at the loads Distribution Pump Bell.
Presentation transcript:

How to Convert and Optimize Primary/Secondary Pumping Systems to Variable Flow Primary Systems Presented By: Hemant Mehta, P.E. WMGroup Engineers, P.C.

History of Variable Primary Flow Projects King Saud University - Riyadh (1977) Louisville Medical Center (1984) Yale University(1988) Harvard University (1990) MIT(1993) Amgen (2001) New York-Presbyterian Hospital (2002) Pennsylvania State Capitol Complex (2005) Duke University (2006) NYU Medical Center (2007) Memorial Sloan-Kettering Cancer Center (2007)

King Saud University – Riyadh (1977) 60,000 ton capacity with 30,000 tons for first phase Six 5,000 ton Carrier DA chillers Seven 10,000 GPM 240 TDH constant speed pumps Major Problem: Too much head on chilled water pumps Lesson Learned: Be realistic in predicting growth

Louisville Medical Center (1984) Existing system (1984) Primary/Secondary/Tertiary with 13,000 ton capacity Current System (2007) 120 feet TDH constant speed primary pumps with building booster pumps – 30,000 ton capacity Changed the heads on some of the evaporator shells to change number of passes Primary pumps are turned OFF during winter, Early Spring and Late Fall. Building booster pumps are operated to maintain flow.

Yale University (1988) Existing system (1988) Primary/Secondary/Tertiary with 10,500 ton capacity Current System (2007) 180 feet TDH VFD / Steam Turbine driven variable flow primary pumps – 25,000 ton capacity Changed the heads on some of the evaporator shells to change number of passes

Amgen (2001) Creation of a computerized hydraulic model of the existing chilled water plant and distribution system Identification of bottlenecks in system flow Evaluation of existing capacity for present and future loads Two plants interconnected: Single plant operation for most of the year, second plant used for peaking Annual Energy Cost Savings: $500,000

Additional Variable Primary Flow Projects Harvard University (1990) MIT(1993) New York-Presbyterian Hospital (2002) Pennsylvania State Capitol Complex (2005) Duke University (2006) NYU Medical Center (2007) Memorial Sloan-Kettering Cancer Center (2007)

Duke University Background CCWP-1 plant was built four years ago CCWP-2 design was 90% complete (Primary/Secondary pumping) We were retained by Duke to peer review the design Peer review was time sensitive Plant design for CCWP-2 was modified to Variable Primary pumping based on our recommendations

Duke CCWP-1 Before

Duke CCWP-1 After Dark blue pipe replaces old primary pumps

Duke Levine Science Research Center CHW System

Duke CIEMAS Building CHW System 90% closed Triple duty valves 50% closed

Duke CIEMAS Building AHU-9 Balancing valve 50% closed

NYU Medical Center (2007) Plant survey and hydraulic model indicated unnecessary pumps 1,300 horsepower of pumps are being removed, including 11 pumps in two brand new chiller plants $300,000 implementation cost $460,000 annual energy savings

NYU Medical Center (2007) Plant survey and hydraulic model indicated unnecessary pumps 1,300 horsepower of pumps are being removed, including 11 pumps in two brand new chiller plants $300,000 implementation cost $460,000 annual energy savings 8 Pumps Removed 3 Pumps Removed 7 Pumps Removed 3 Pumps Removed

Memorial Sloan-Kettering - Before

Memorial Sloan-Kettering - After Bypass or removal of pumps Bypass or removal of pump Bypass or removal of pumps

Pump Cemetery To date we have removed several hundred large pumps from our clients’ chilled water systems

Good Engineers Always Ask “Why?” Why does the industry keep installing Primary/Secondary systems? Why don’t we get the desired system ΔT? Why does the industry allow mixing of supply and return water?

Good Engineers Always Ask “Why?” Why does the industry keep installing Primary/Secondary systems? Why don’t we get the desired system ΔT? Why does the industry allow mixing of supply and return water? Answer: To keep consultants like us busy! Why change?

Reasons to Change Chiller manufacturing industry supports the concepts of Variable Primary Flow Evaporator flow can vary over a large range Less space is required for fewer pumps Lower first cost and operating costs

Change is Starting Around the World Most of the large district cooling plants in Dubai currently use Primary/Secondary pumping By educating the client we were able to convince them that this is not necessary We are now currently designing three 40,000 ton chiller plants in Abu Dhabi using Variable Primary Flow as part of a $6.9 billion development project

Design Guidelines of A Primary Variable Flow System Main Equipment Minimize amount of installed equipment Estimate maximum chiller capacity required with full build-out of your campus Use 350 SF/Ton as a guideline for most building types Multiple Plants/ Virtual Central System Review your existing system and decide your needs for ultimate build-out

Design Guidelines of A Primary Variable Flow System Chillers Renegotiate with manufacturer to provide maximum capacity based on the chiller selection. Keep flow velocity around 6.5 ft/sec at peak Chilled Water Pumps Variable Frequency Drive Review feasibility of oversizing pumps in lieu of providing a standby pump

Design Guidelines of A Primary Variable Flow System Condenser Water Pumps Variable Speed Condenser Water Pumps? Cooling Towers Design for at least 2°F higher wet bulb temperature than normal design wet bulb Specify full flow coverage at 50% of peak flow Pressurization Tank City water pressure may be adequate Tank May not be required for large system Air Separators Not required

Design Guidelines of A Primary Variable Flow System Controls Flow control valves on CHWR and CWR lines to each chiller Chilled water differential pressure bypass valve at the plant Differential pressure sensors at the hydraulically most remote buildings Flow meters on CHWR and CWR lines to each chiller Outside air weather station Temperature and humidity sensors for cooling tower controls Learn the behavior of your system Remember You can not manage what you do not measure

Design Guidelines of A Primary Variable Flow System Chilled water flow controls and site differential pressure Master Control CHWP VFD is controlled to maintain required differential pressure at remote buildings Sub Master Control Provide to maintain individual chiller minimum flow

Variable Volume Primary System Flow Diagram

Variable Volume Primary System Flow Diagram Chillers

Variable Volume Primary System Flow Diagram CHW Pumps

Variable Volume Primary System Flow Diagram DP Bypass

Variable Volume Primary System Flow Diagram Condensers

Variable Volume Primary System Flow Diagram Control Valves

Variable Volume Primary System Flow Diagram CW Pumps

Variable Volume Primary System Flow Diagram Cooling Towers

Summary There are many chilled water plants with significant opportunities for improvement WM Group has a proven record of providing smart solutions that work We will be happy to review your plant logs with no obligation 1985: $ 0.171/ton-hr 2002: $0.096/ton-hr

Thank You WMGroup Engineers, P.C. Hemant Mehta, P.E. President (646) 827-6400 hmehta@wmgroupeng.com