Jelsa Project
Primary Crusher – t/h feed from two sides
Material flow from PPP to SPP – mostly direct feed
Secondary plant – Building Ensemble
Tertiary plant feed stock – Total tons for 5 process days
Tertiary Screening + Crushing – Compact Design
Crusher Building
Screening Building – 2 parallel processing lines
Wet Sand – Free loading access from all sides
Dry Sand – Dust reduction through complete covering
Stock Area – tons on 2 x 450m tunnels possible
Stacker – Flexible two arm stock feeding
Off-Shore stock – tons for 4 vessels
Shiploader – High flexibility for short ship loading time