Quality Management System Corrective and Preventive Actions Argenis Osorio – Manager, Quality Assurance 19 September 2013 FACULTY MANAGEMENT.

Slides:



Advertisements
Similar presentations
Managing Compliance Related to Human Subjects Research Review Joseph Sherwin, Ph.D. Office of Regulatory Affairs University of Pennsylvania Fourth Annual.
Advertisements

The Regulatory Perspective
EMS Checklist (ISO model)
Quality Management System
Net Promoter Score (NPS)
A tradition of excellence TR-823 REV / Restricted Proprietary Information. Marvin Group proprietary rights are included in the information disclosed herein.
Software Quality Assurance Plan
Dispelling Myths Surrounding ISO/IEC 17020
Checking & Corrective Action
Quality Improvement Level Up Program December 17, 2008.
Cope: 343 Occupational Health and Safety Training — Level 1 Workplace Inspections Version 5.
OHSAS
ISHIKAWA DIAGRAM – Tool for quality management Marit Laos IS Project Management
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
Systems Analysis and Design 9th Edition
The ISO 9002 Quality Assurance Management System
1 CE-407 Project Planning, Management & Engg. Economics, 02 Credit Hours Spring 2015 Lecture 02 Work Breakdown Structure by Faisal Rehman Department of.
BSBPMG501A Manage Project Integrative Processes 4.3 Direct and Manage Project Execution This is the process of performing the work defined in the project.
© , Leffingwell, LLC. All rights reserved. Inspect and Adapt Workshop Toolkit Improving Release Outcomes (or any other problem) with Root Cause.
Principles for Implementing Lean Manufacturing Lecture 3: Overview 1.Lean Methodology and Building Blocks 2.Kaizen Methodology 3.The 5 Whys 4.Fishbone.
EMS Training, Awareness & Competence Norma Murphy
ISO 9000 Certification ISO 9001 and ISO
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Training.
4. Quality Management System (QMS)
Five Star Quality Consultants Implementing ISO 9001 Corrective and Preventive Action.
Fundamentals of ISO.
Training. Why Train? skills and knowledge needed by new staff update skills of old staff assure conformity to standards teach the proper use of SQA procedures.
Ship Recycling Facility Management System IMO Guideline A.962
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
1 Accreditation and Certification: Definition  Certification: Procedures by which a third party gives written assurance that a product, process or service.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Roles and Responsibilities
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
[PROJECT] FINDINGS AND RECOMMENDATIONS FEBRUARY 28,2010.
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
4.3 Document control 4.4 Review of requests, tenders and contracts
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
ME 4054W: Design Projects RISK MANAGEMENT. 2 Lecture Topics What is risk? Types of risk Risk assessment and management techniques.
TOTAL QUALITY MANAGEMENT
Corrective Action Training Document World Class Solutions for Global Applications Riverhawk.
Leveraging technology to strengthen Continuous Quality Improvement C. BERNARD MANAGING DIRECTOR IBHAR HEALTHCARE
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
The following training presentation is for all 1Prospect employees and is taken upon joining the company team. Quality Management System (QMS) Training.
5 Why analysis By its very nature, a Lean Six Sigma program requires a number of changes throughout the organization. That’s what we are trying to do right?
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
PROBLEM SOLVING. Definition The act of defining a problem; determining the cause of the problem; identifying, prioritizing and selecting alternatives.
Personnel.
ISO 14001: 2004 Environmental Management Review Presentation
Software Verification and Validation
Operation Shop Supervisor
The following training presentation is for all employees and is taken upon joining the company team. Quality Management System (QMS) Training Proprietary.
Fundamentals of ISO.
UNIT V QUALITY SYSTEMS.
KMCO CAPA System Training
Quality Management Systems – Requirements
Setting up an Internal Audit Program
Agenda Who are we? 1 Introductions Journey so far 2
Steps for product/material nonconformance:
Lean Methodology and Building Blocks Kaizen Methodology The 5 Whys
Audit Findings Process
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Company Name Date By Whomever
5 Why Process/Guidelines
Supplier Problem Resolution Problem Improvement Request
Sepsis Program Development
Company Name Date By Whomever
Supplier Corrective ACTION RESPONSE REVIEW TRAINING
Presentation transcript:

Quality Management System Corrective and Preventive Actions Argenis Osorio – Manager, Quality Assurance 19 September 2013 FACULTY MANAGEMENT

Corrective and Preventive Actions  Purpose and Scope — This procedure defines the roles, responsibilities and the process of handling corrective and preventive actions across Facilities Management at the University of Calgary, all while continually improving the Quality Management System. 2

Corrective and Preventive Actions  What is a Corrective and Preventive Action? — Corrective actions are steps performed to eliminate the cause of a detected non-conformance, thereby eliminating its possible re-occurrence. A Corrective Action Report (CAR) will be initiated to address this type of non- conformance. — Preventive actions are steps performed to eliminate the cause of a potential non-conformance, thereby eliminating its possible occurrence. A Preventive Action Report (PAR) will be initiated to address this type of non-conformance. 3

Corrective and Preventive Actions  These two actions may be initiated due to issues typically arising from: — Customer complaint, — Quality system audit (internal and external), — Supplier performance monitoring, — Management reviews, — Customer feedback, — Employee observation, and — Non-conformance. 4

Corrective and Preventive Actions  Responsibilities of Managers/Supervisors/Employees — Managers / Supervisors:  Ensuring the assignment of resources needed for the timely completion of all CARs and PARs that are assigned to their department, and  Ensuring their staff report and document all non- conformances. — Employees:  Submit a preventive or corrective action request to their supervisor when they identify a non-conformance or a potential non-conformance. 5

Corrective and Preventive Actions 6

 The escalation process for any CAR/PAR open beyond the stated due date shall be as follows: — At the due date, the actionee and their immediate manager will be notified that the CAR/PAR due date has been reached and has not been closed. — CARs/PARs remaining open for more than 15 calendar days past their due date will be escalated to the actionee’s Director and to the Manager, Quality Assurance. — Any CARs/PARs remaining open for more than 30 calendar days past their due date will be escalated to the actionee’s AVP and to the Manager, Quality Assurance. — Any CARs/PARs remaining open for more than 60 days past their due date will be escalated to the actionee’s AVP and to the VP, Facilities Management and Development. 7

Corrective and Preventive Actions  Root Cause Analysis Tools — Ishikawa / Fishbone / Cause and Effect Diagram 8

Corrective and Preventive Actions  Root Cause Analysis Tools - Continued — 5 Whys is an interactive question-asking technique used to explore the cause-and-effect relationships underlying a particular problem. — Example: — The vehicle will not start. (the problem)  Why? - The battery is dead. (first why)  Why? - The alternator is not functioning. (second why)  Why? - The alternator belt has broken. (third why)  Why? - The alternator belt was well beyond its useful service life and not replaced. (fourth why)  Why? - The vehicle was not maintained according to the recommended service schedule. (fifth why, a root cause)  Why? - Replacement parts are not available because of the extreme age of the vehicle. (sixth why, optional footnote) — Start maintaining the vehicle according to the recommended service schedule. (possible 5th Why solution) — Adapt a similar car part to the car. (possible 6th Why solution) 9