T0 offline status Alla Maevskaya Institute for Nuclear Research, Moscow 8 October 2007 ALICE offline week For T0 group.

Slides:



Advertisements
Similar presentations
TDC130: High performance Time to Digital Converter in 130 nm
Advertisements

Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
VETO Analysis Update Michael Wood University of Massachusetts, Amherst Outline Introduction and basics Reconstruction packages Efficiencies Simulation.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
TOF offline and calibration A. De Caro (University and INFN of Salerno)
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Time over Threshold Electronics for Neutrino Telescopy George Bourlis + multiplicity.
The Time-of-Flight system of the PAMELA experiment: in-flight performances. Rita Carbone INFN and University of Napoli RICAP ’07, Rome,
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
PHOS offline status report Yuri Kharlov ALICE offline week 7 April 2008.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Analysis of Endstation A setup Josef Uher. Quartz bar Start counter.
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
Offline report – 7TeV data taking period (Mar.30 – Apr.6) ALICE SRC April 6, 2010.
T0 status1W.H.Trzaska HIP Jyväskylä Status of T0 project ALICE Comprehensive Review IV March 23, 2004.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
CERN November 22, 20041W.H.Trzaska HIP Jyväskylä T0 answers Meeting with LHCC referees CERN, November 22, 2004.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
STaRBoard Jamal Rorie 5/09/06 Physics 476. Why do we need ToF info? Used to determine species of particle –Central Drift Chamber records path –ToF records.
Thomas Jefferson National Accelerator Facility Page Hall B:User Software Contributions Gerard Gilfoyle University of Richmond 12 GeV Upgrade Software Review.
T0 offline status Alla Maevskaya for T0 team 8 March 2011 ALICE offline week.
Online Reconstruction 1M.Ellis - CM th October 2008.
C. Oppedisano, 9 October 2007, ALICE Offline Week 1 RECONSTRUCTION ALGORITHM CALIBRATION OBJECT ESD STRUCTURE ONGOING TASKS.
PMT Readout and Floor Triggering Charge estimation using the times over the thresholds Event Building and Triggering + multiplicity George Bourlis.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
FIT (Fast Interaction Trigger) detector development for ALICE experiment at LHC (CREN) Institute for Nuclear Research (INR RAS) National Research Nuclear.
CERN September 29, 20041W.H.Trzaska HIP Jyväskylä T0 – TDR 22 nd LHCC meeting; Open Session CERN, September 29, 2004 W.H.Trzaska (for T0 collaboration)
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
The ALICE Experiment Event by Event fluctuations ALICE TOF Calibration 30th November 2007Chiara Zampolli1.
M. Oldenburg GridPP Metadata Workshop — July 4–7 2006, Oxford University 1 Markus Oldenburg GridPP Metadata Workshop July 4–7 2006, Oxford University ALICE.
ALICE Offline Week October 4 th 2006 Silvia Arcelli & Chiara Zampolli TOF Online Calibration - Strategy - TOF Detector Algorithm - TOF Preprocessor.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
J/ψ simulations: background studies and first results using a compact RICH detector Alla Maevskaya INR RAS Moscow CBM Collaboration meeting September 2007.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
 offline code: changes/updates, open items, readiness  1 st data taking plans and readiness.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
1 Tomasz Malkiewicz University of Jyväskylä Finland ALICE T0 detector Alignment and Calibration status ALICE Offline week.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
 13 Readout Electronics A First Look 28-Jan-2004.
EZDC spectra reconstruction and calibration
MoNA detector physics How to detect neutrons. Thomas Baumann NSCL.
TOF CALIBRATION DATABASE
ALICE Offline Week, CERN
FIT Front End Electronics & Readout
Sheng-Li Liu, James Pinfold. University of Alberta
Hellenic Open University
A First Look J. Pilcher 12-Mar-2004
Hellenic Open University
CLAS12 Timing Calibration
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Presentation transcript:

T0 offline status Alla Maevskaya Institute for Nuclear Research, Moscow 8 October 2007 ALICE offline week For T0 group

Outline T0 status T0 status Test of T0 electronics by LCS Test of T0 electronics by LCS Tools show data for LCS Tools show data for LCS Calibration Calibration Reconstruction Reconstruction QA QA Addendum: how HPTDC works Addendum: how HPTDC works 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

T0-C was installed in April and the T0 electronics production was completed in September. Electronics installation and testing will be completed before end testing will be completed before end At this moment we are completing the final tests of electronics in the T0 lab with T0-A and we are going to move the electronics to Point 2 to be able to run the detector during the magnet-on period in December. T0-A is now scheduled for installation in Jan/Feb Status of T0 T0-A T0-C 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Readout electronics Fast electronics Configuration during the September 2007 test: Hardware -T0-A detector -Laser system -New shoe-boxes (from F.Formenti) -Fast electronics (final version) -Readout electronics CPDM + TRM + VME64X backplane + DRM (final version) Already tested : -new shoe-boxes -T0 Trigger Unit (T0TU) -Start Laser system from pre-pulser comes from TTC -Busy signal generated by DRM -time & amplitude resolutions -NIM crate control & Thresh. For CFD -new version of TVDC 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Trigger: T0C T0C Trigger: central central Trigger: semi-central s-centr Trigger: T0A T0A Trigger: vertex position in given range TVDC 2 full multiplicities QTC full (T0 A + T0 C ) /2 meaner 48 Charge –to-Time Converter amplitudes QTC 24 Leading Edge Discriminators (LED-CFD amplitude) LEDCFD 24 Constant Fraction Discriminators (Time) T0 readout channels 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Current electronics test with Laser Calibration System (LCS) The electronics test is running now. Our engineers use AliRoot based tools to see what they measure. The same tool (extended with writing to OCDB) can be used for Laser Calibration Runs in between physics runs. 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Tools to show spectra from LCS AliT0CalibLaserData file with 105 1D histograms as readout output 24 QTC (QT1-QT0) 24 LED-CFD 24 CFD vs QTC walk correction by QTC 24 CFD vs LED-CFD walk correction by LED 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

LaserDataViewer Test shows that with full scheme we can provide time resolution 30-40ps 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

What T0 will measure Time when particles from interaction point hit T0 with accuracy 30-40ps ….with time reference synchronized for each T0 channel and TOF Time when particles from interaction point hit T0 with accuracy 30-40ps ….with time reference synchronized for each T0 channel and TOF Interaction time (T C +T A )/2 that does not depend on vertex position but has the synchronized reference time for T0 and TOF. Can be used directly in number of channel units by TOF as START signal. Resolution of this signal is not worse than 30ps Interaction time (T C +T A )/2 that does not depend on vertex position but has the synchronized reference time for T0 and TOF. Can be used directly in number of channel units by TOF as START signal. Resolution of this signal is not worse than 30ps Vertex position with accuracy ~1cm. (T C -T A )/2 can be calibrated to cm units after 1 st run using ITS vertex Vertex position with accuracy ~1cm. (T C -T A )/2 can be calibrated to cm units after 1 st run using ITS vertex Granted: multiplicity in region 4.61 < η< 4.92 && -3.28< η <-2.97 with good φ division Granted: multiplicity in region 4.61 < η< 4.92 && -3.28< η <-2.97 with good φ division 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Calibration procedure Time signal on the exit of CFD channel consists of time of flight of particles time of flight of particles time delays in cables and electronics unique for each channel and not changing during run time delays in cables and electronics unique for each channel and not changing during run time shift depending on amplitude (walk) time shift depending on amplitude (walk) Time signals will be equalized on the entrance of OR module for perfect online trigger signals. Time delays of channels on LCS are not the same as for the beam. So equalizing of time delays during data taking can be done only offline using DA information collected during run. 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Laser calibration Before 1 st run and between runs LCS can:  check channel condition  plot histograms for CFD, LED and QTC  compare with existing in OCDB (Ref)  write in OCDB new one if old was different (QA)  using CFD, LED and QTC data produce 48 TGraphs “Walk correction”  write “Walk correction” to OCDB  write to OCBD scale to convert amplitude signal to MIP’s unit 1MIP1MIP 8MIPs8MIPs AmpAmp Eval(Amp)Eval(Amp) ΔTwalk 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Equalizing of channels Apply walk correction Equalize time delay in channels We decided that PTM1 will be the reference PMT with time T1 Event by event DA fill histograms with ΔT i eq = T1-T i Mean value of ΔT i eq spectrum shows only the difference in delays between channels More about DA in Tomek’s presentation If can be possible to read information about 1MIP amplitude range (measured by LCS and written in OCDB) DA can choose only 1Mip signals and will provide information for one step perfect calibration and reconstruction 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Because mean values are equal for 1MIP events 1MIP events and and “PYTHIA cocktail” we can use CFD signal without amplitude selection as input for procedure for equalizing channels Emulation of PYTHIA time and amplitude spectra with LCS Particle multiplicity on the 1 PMT according to PYTHIA Amplitude spectra of 1&2MIPs generated by LCS Time spectra corresponding to 1&2 MIPs amplitude spectra Time spectra corresponding to 1MIP amplitude 1MIP1MIP 2MIP2MIP 2MIP2MIP 1MIP1MIP 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Calibration parameters in OCDB ΔTwalk QTCvsCFD 24 TGraphLCSBetween runs Δ Twalk LED-CFDvsCFD 24 TGraphLCSBetween runs Δ Teq24 FloatDA during physics run Each run Vertex position #channel->cm TGraphofflineAfter 1 st run Refresh time-to-time LookUpTableTMapofflineNow Change if need Amplitude scale #channel->MIPs 24 x 6 FloatLCSBetween runs 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Calibration parameters in OCDB(ref) CFD24 fitted TH1FLCSBetween runs LED24 TH1FLCSBetween runs QTC24 Fitted TH1F LCSBetween runs QTC24 Fitted TH1FDA data takingEach physics run LED-CFD24 Fitted TH1FDA data takingEach physics run And more … about it in Tomek’s presentation 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Reconstruction Input for reconstruction: after calibration each time channel will be T i = T CFD + ΔTwalk + Δ Teq Choose PMT with smallest time on both (A & C) sides T0A & T0C ( or weighted mean – is not clear yet ) Choose PMT with smallest time on both (A & C) sides T0A & T0C ( or weighted mean – is not clear yet ) Calculate interaction time (T A +T C )/2 Calculate interaction time (T A +T C )/2 Vertex position as (T A -T C )/2 Vertex position as (T A -T C )/2 Convert amplitude information to 1, 2…MIPs units Convert amplitude information to 1, 2…MIPs units 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

2 nd step of reconstruction If DA could not choose only 1 MIP particles for calculation ΔTeq we can improve time resolution by 2 nd step of reconstruction using data of 1 st step for calibration. This improves the time resolution by ~5ps for p+p runs and is necessary for ion+ion runs reconstruction 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Filling ESD In ESD we have to write for physical issues: Amplitude for each PMT Amplitude for each PMT Mean time Mean time Vertex position Vertex position T0A T0A T0C T0C 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

QA of reconstruction For our own understanding of reconstruction quality we need for each PMT event-by-event time in number of channels, amplitude (LED and QTC), All 5 trigger signals 24 INT, 48 Float, 5 Bool We can write them in any place from where we can get them and look in: ???? ESD, ESDfriend, QA special place ???? We can write them in any place from where we can get them and look in: ???? ESD, ESDfriend, QA special place ???? 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

QA of raw data We need QA control of raw data and detector condition immediately after run. This knowledge allows us between runs understand detector status during run understand detector status during run recalibrate detector if it is necessary recalibrate detector if it is necessary repair something…. repair something…. If Monitoring system will store histograms in the place we can reach them If Monitoring system will store histograms in the place we can reach them Collect by DA CFD, LED and QTC (additional 72 histograms), (additional 72 histograms), write to OCDB or RefCDB. After shuttle finish his work we can connect laptop and we can connect laptop andinvestigate histograms histograms Collect by DA CFD, LED and QTC (additional 72 histograms), (additional 72 histograms), write to OCDB or RefCDB. After shuttle finish his work we can connect laptop and we can connect laptop andinvestigate histograms histograms 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

To be done This weekend we more or less finished our discussions about calibration and now we are ready to extend existing codes to fulfill it. In the middle of November T0 offline will be “ready” for the 1 st run 8 October 2007 Alla Maevskaya INR Moscow ALICE offline week

Addendum

What is a TDC and its use I TDC's are used to measure time (intervals) with high precision TDC's are used to measure time (intervals) with high precision Start – stop measurement Start – stop measurement Measurement of time interval between two events: start signal – stop signal Measurement of time interval between two events: start signal – stop signal Used to measure relatively short time intervals with high precision Used to measure relatively short time intervals with high precision Like a stop watch used to measure sport competitions Like a stop watch used to measure sport competitions Start Stop From presentation of author of HPTDC

Time scale (clock) Hits What is a TDC and its use II Time tagging Measure time of occurrence of events with a given time reference Time reference (Clock) Events to be measured (Hit) Used to measure relative occurrence of many events on a defined time scale Such a time scale will have limited range: like 12 hour or 24 hour time scale on your watch when having no date and year Such a time scale will have limited range: like 12 hour or 24 hour time scale on your watch when having no date and year Like a normal watch From presentation of author of HPTDC