Master Scheduling and Rough-Cut Capacity Planning

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Inventory Systems for Dependent Demand
PowerPoint Presentation
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
UNITED NATIONS Shipment Details Report – January 2006.
We need a common denominator to add these fractions.
Summary of Convergence Tests for Series and Solved Problems
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Who Wants To Be A Millionaire?
Negative Numbers What do you understand by this?.
Learning to show the remainder
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Division- the bus stop method
Ch. 6 Master Production Scheduling
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Slippery Slope
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
Partial Products. Category 1 1 x 3-digit problems.
PSSA Preparation.
Essential Cell Biology
Chapter 20 The ISLM Model. Copyright © 2007 Pearson Addison-Wesley. All rights reserved Determination of Aggregate Output.
Supplement D Master Scheduling and Rough-cut Capacity Planning
Aggregate Planning.
11 Material Management Class Note # 2 MPS Practices – Available-to-Promise ( ATP ) Prof. Yuan-Shyi Peter Chiu Feb
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
Chapter 13 – Aggregate Planning Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
Chapter 13 – Aggregate Planning
Lecture 8 Master Product Scheduling (Revisited)
Master Production Scheduling (MPS)
Presentation transcript:

Master Scheduling and Rough-Cut Capacity Planning ISQA 459/559 Mellie Pullman

Learning Objectives Explain the role & objectives of a master production schedule Explain the organizational links to master production scheduling Develop a master production schedule Explain rough-cut capacity planning Calculate available-to-promise quantities Describe time fence policies

Role of the MPS Aggregate plan: Master production schedule: Specifies the resources available (e.g.: regular workforce, overtime, subcontracting, allowable inventory levels & shortages) Master production schedule: Specifies the number & when to produce each end item (the anticipated build schedule) Disaggregates the aggregate plan

Business Planning Hierarchy

Planning Links to MPS

Objectives of MPS Maintain the desired customer service level Utilize resources efficiently Maintain desired inventory levels

Developing an MPS: Assume: Make-to-stock environment Production is in fixed quantities of 125 (MPS) 110 units in beginning inventory (BI)

Sample Problem We start with 110 units in Beginning Inventory Period 1 2 3 4 5 6 7 8 9 10 11 12 Forecast 50 75 Projected Available 110 MPS We start with 110 units in Beginning Inventory Projected Available: How many units are available at the end of each time period? MPS: Replenishment Shipments that need to arrive at the beginning of the time period Projected Available =BI + MPS - Forecast

Step 1 Find first negative “projected available” We start with 110 units in Beginning Inventory Projected Available: How many units are available at the end of each time period? (safety stock criteria could be in place > 5) MPS: Replenishment Shipments that need to arrive at the beginning of the time period

Schedule Production

Repeat

Continue, Until Complete

Evaluating the MPS Customer service issues: Does “available-to-promise” inventory satisfy customer orders? What new orders can we take from customers and when?

Available to Promise When a customer places an order, they do not expect immediate delivery (negotiable). The product will delivered by some later date. ATP = how many uncommitted units the company has available at a given time

New Calculation for Projected Available Period 1 2 3 4 5 6 7 8 9 10 11 12 Forecast 50 75 Customer Orders 35 25 20 15 Projected Available 110 Available to Promise MPS Projected Available = BI + MPS – Max (Customer Orders ; Forecast)

Available-to-Promise “Action Bucket” Period 1 2 3 4 5 6 7 8 9 10 11 12 Forecast 50 75 Customer Orders 35 25 20 15 Projected Available 110 60 85 110 Available to Promise MPS 125 “Action Bucket” = the current period Only calculate ATP during in Action Bucket and when MPS occurs ATP action bucket = BI +MPS-customer orders before next replenishment 110 + 0 – (35+25) = 50

Available-to-Promise “Replenishment periods” 1 2 3 4 5 6 7 8 9 10 11 12 Forecast 50 75 Customer Orders 35 25 20 15 Projected Available 110 60 85 110 Available to Promise 80 125 115 MPS ATP for replenishment periods ATP = MPS - customer orders between current MPS and next scheduled replenishment ATP period 3 = 125 – (25 + 20)= 80 ATP period 5 = 125 – (0 + 15)= 110

New Order Suppose we get an order for 200, can we accept this for delivery in period 5?

Worksheet for New Order for 200 Period 1 2 3 4 5 6 7 8 9 10 11 12 Forecast 50 75 Customer Orders 35 25 20 200 15 Projected Available 110 60 85 Available to Promise 80 MPS 125 Fit in the order for 200 (can’t change MPS)

New Order for 200 Period 1 2 3 4 5 6 7 8 9 10 11 12 Forecast 50 75 Customer Orders 35 25 20 200 15 Projected Available 110 60 85 -40 -115 -65 -15 -90 Available to Promise 80 125 115 MPS Negative number in Projected Available = might be a problem in the future Negative number in Available to Promise= always a problem Solution?

Split up New Order for 200 Check to see if this is OK Period 1 2 3 4 5 6 7 8 9 10 11 12 Forecast 50 75 Customer Orders 45 25 105 20 110 15 Projected Available 110 Available to Promise MPS 125 Check to see if this is OK

Can you now take 2 more orders? Period 1 2 3 4 5 6 7 8 9 10 11 12 Forecast 50 75 Customer Orders 45 25 105 20 110 15 40 Projected Available 110 60 30 -20 -5 -80 -30 Available to Promise MPS 125 50 units to be delivered in Period 8 30 units to be delivered in Period 12

Time Fences

Frozen: no changes are possible with a certain period of time (i. e Frozen: no changes are possible with a certain period of time (i.e. 8 weeks) Time Fence (length of period schedule is frozen, liquid, etc.) Demand Fence: MPS numbers do not change and focus is on orders not forecast Planning Fence: Master Production Scheduler is planning more MPS.

Rough-cut capacity planning An estimate of the plans’ feasibility Given the demonstrated capacity of critical resources (e.g.: direct labor & machine time), have we overloaded the system?

Rough-Cut Capacity Planning Determine required resources & proposed workload: Hours/unit

Calculate Required Labor Hours Compare with hours available

Calculate Required Machine Hours Compare with hours available