Framework Programme 6, Call 1A Thematic Priority 1.6.2, Area 3.1.2, Task 1.10 Instrument: Co-ordination Action + Additional Research STEPs Scenarios for.

Slides:



Advertisements
Similar presentations
DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
Advertisements

STEPs Scenarios for the Transport System and Energy Supply and their Potential Effects Framework Programme 6, Call 1A Thematic Priority 1.6.2, Area 3.1.2,
STEPs Scenarios for the Transport System and Energy Supply and their Potential Effects Framework Programme 6, Call 1A Thematic Priority 1.6.2, Area 3.1.2,
Unconventional Gas and EU Energy Policy
Towards a European Qualifications Framework for Lifelong Learning Vienna, 21 October 2005 Michael Teutsch European Commission.
Conclusions 4. ESC meeting at Scheveningen, The Netherlands September 2006 The meeting where the first transnational call of SAFEFOODERA was (almost)
European Commission DG Development EC Responses to Soaring Food Prices Philip Mikos – DG Development Policies for the Sustainable management of natural.
STD/PASS/TAGS – Trade and Globalisation Statistics STD/SES/TAGS – Trade and Globalisation Statistics OECD collection of Trade in services data Trade and.
European Reanalysis and Observations for Monitoring Take time to think about the key conclusions of the project and how to report the outcomes.
Regional meeting of PlanCoast partners from Adriatic Sea region, Kotor, Montenegro, March 2007 PROGRESS REPORT (1) 1. SUMMARY of PAP/RAC activities.
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
EU-Regional Policy Structural actions 1 GROWING EVALUATION CAPACITY THE MID TERM EVALUATION IN OBJECTIVE 1 AND 2 REGIONS 8 OCTOBER 2004.
European Commission: Environment Directorate General Slide: 1 The Second European Climate Change Programme Working Group III Carbon Capture and Geological.
The European Qualifications Framework (EQF)
TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
Brest, 27 – 29 of February COBECOS 1 COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 Policy-Oriented Research Second progress meeting Brest, 27 th.
European Commission: Environment Directorate General Slide: 1 ECCP Aviation Working Group Mandate and draft work programme Directorate C – Air and Chemicals.
1 Cohesion Policy Evaluation Network Meeting: Brussels, October 2010 Ex post evaluation of cohesion policy interventions financed.
EUROCHIP 3 WP1 and WP3 Meeting Feeding the project Evaluation 17 September 2010 Sofia, Bulgaria.
D:\data\PowerPoint\Raynal\NCP-EURATOM Meeting - CCAB ppt Slide 1 National Contact Points for EURATOM- Information Exchange Meeting October 16,
The PV Policy Group Project FIRST THEMATIC WORKING GROUP MEETING Friday 07 October 2005 in Catania, Italy Presentation Markus Kurdziel & Corinna Klessmann.
W Helmreich – Presentation to Sub-contractors; Brussels, 13/10/2005 WP 2: Monitoring, Analysis and Information Preparation Sub-contractor Meeting – 13.
1- Sept 2004 PLENARY SESSION ON NEW EUROCITIES STRUCTURES Gijón, 30 September 2004.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
NOV-3733-SL-9715 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions: Dissemination NATURAL HISTORY MUSEUM – UNIV. OF CRETE (NHMC) Project co funded by.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
European Commission - DG Environment CBA in CAFE Cost-Benefit Analysis of the Clean Air for Europe Programme CLRTAP, TFIAM 28th session Haarlem, 7-9 May.
Transfer Review Process To convert statements of SEN into EHC plans The role of Schools.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
PATCH-WORLd PArenTs and CHildren Working, ORganising and Learning together 23/24 October 2009 Sofia Final Conference This project has been funded with.
Management Report Annette Freibauer Management Report Annette Freibauer Max-Planck-Institute for Biogeochemistry, Jena.
BA-DEGREE PROGRAMME: BANKING AND INSURANCE INDUSTRY UNIVERSITY OF APPLIED SCIENCES Welcome to: KICK-OFF MEETING GRAZ Financial Education Levering the Implementation.
Waterways Forward Overview of partners’ specific roles and tasks Delft, 12 February 2010 Kick-off meeting.
ESPON 2013 Programme Info Day on New Calls and Partner Café Call for Proposals on Applied Research.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
OSI conference, Bled April 2004 EU Funding: an introduction Tamsin Rose.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP1 Management 10-11/07/2012COGEN Europe.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels CAFE and the NECD review Stefan Jacobi European Commission, DG Environment,
INFSOM-RI WP NA2 Dissemination, Training and Certification Isabel Matranga Engineering Ingegneria Informatica S.p.A. ETICS 2 Kick.
Josep Juandó & Magüi Pérez Cabaní, Yerevan, Armenia 14th of January, 2014 VERITAS. Tempus project. DISSEMINATION.
Mid-Decade Assessment of the United Nations 2010 World Population and Housing Census Program Arona L. Pistiner Office of the Associate Director for 2020.
INFSO-RI Enabling Grids for E-sciencE Plans for the EGEE-2 EGEE 2 Task Force 3rd EGEE Conference, Athens, April 2005.
Clean Air for Europe TFIAM Conference Planning of the CAFE programme AMIENS May 2004 André Zuber & Matti Vainio Environment DG - European Commission TFIAM.
CAST: Financial and administrative issues Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework.
Review of MGs involvement in SRA process MG meeting 24 th January 2007 Brussels.
1 PRODUCTION OF A MANUAL FOR STATISTICS ON ENERGY CONSUMPTION IN HOUSEHOLDS MESH PROJECT 2 nd Working Meeting Madrid, 4 th May 2012 WP1: Administrative.
Slide 1 / 6 MC-PAD Reporting Seamus Hegarty Human Resources Department – CERN Marie Curie Actions administrator MC-PAD Supervisory Board meeting Jozef.
What Progress on Poverty and Participation?
Informal document GRE-77-18
REVISED WHITE PAPER ON ARTS, CULTURE AND HERITAGE: PC UPDATE
SKADS Controller’s Meeting Timeline Annual Financial Report
Potential Milestones A timeline to finish in one year
WFD and Agriculture Defra UK.
Future deadlines Francesca Liberati, MISSOC Secretariat
CAFE Work Programme Preparing the Thematic strategy on air pollution
SOCIAL DIALOGUE WITHIN EUPAN
Reports Deliverable #21 4th technical progress report by end of July
WP4 Proposed Structure of the Outcome “Tool Kit and Recommendations”
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
CAFE Work Programme Preparing the Thematic strategy on air pollution
DG Environment, Unit D.2 Marine Environment and Water Industry
Green Infrastructure: Working method
WP 1 Management and Coordination
Scene setter European Commission DG Environment
Invasive Alien Species
Presentation transcript:

Framework Programme 6, Call 1A Thematic Priority 1.6.2, Area 3.1.2, Task 1.10 Instrument: Co-ordination Action + Additional Research STEPs Scenarios for the Transport System and Energy Supply and their Potential Effects Management issues Adriaan Nuijten Buck Consultants International

Adriaan Nuijten Bratislava, March 2006Slide 2 Management issues Reporting and cost statements second periodReporting and cost statements second period Project planningProject planning

Adriaan Nuijten Bratislava, March 2006Slide 3 Reporting and cost statements Deadline = deadline (surely for the Commission)Deadline = deadline (surely for the Commission) –45 days after end of period –BCI needs some weeks compilation time BCI apologises for late notificationBCI apologises for late notification

Adriaan Nuijten Bratislava, March 2006Slide 4 Reporting and cost statements (2) Bad news: BCI still has not all items; more than two weeks after the deadlineBad news: BCI still has not all items; more than two weeks after the deadline partnerC-formReporting input AUEB-RC/TRANSLOGPaperNo BCIPaperYes ITSPaperYes JRC-IPTSPaperYes KUL-SADL Yes, brief S&WPaperYes SenterNovemPaperYes Stratec Yes TIS.ptPaperYes, brief TRL Yes, brief TRTPaperYes TTR Yes UPM-TRANSYTPaperYes WSP-LTPaperYes, brief

Adriaan Nuijten Bratislava, March 2006Slide 5 Reporting and cost statements (3) Good news: we received an extension of the EU deadlineGood news: we received an extension of the EU deadline Next time, please observe:Next time, please observe: –plan enough time for this in the weeks after the reporting period ends –timely response is needed even if partner had a marginal role in project –send paper C-forms by secured mail / courier –inform us in time when you cannot make it!

Adriaan Nuijten Bratislava, March 2006Slide 6 Reporting and cost statements (3) Planning of last reporting period; two options:Planning of last reporting period; two options: –Reporting immediately after Gothenburg; project deadline mid August –Extension until end September can be requested Proposal: no extension neededProposal: no extension needed –Deadline for input 15 July; –Paper C-forms 1st August.

Adriaan Nuijten Bratislava, March 2006Slide 7 Planning of the last half year of STEPs WP5 finalised by end MarchWP5 finalised by end March Leuven meeting to discuss Gothenburg conference and Final ReportingLeuven meeting to discuss Gothenburg conference and Final Reporting –18 May –WP6/7/8 partners and WP leaders –Additional travel budget available Reporting (WP6)Reporting (WP6) –Starts as soon as possible

Framework Programme 6, Call 1A Thematic Priority 1.6.2, Area 3.1.2, Task 1.10 Instrument: Co-ordination Action + Additional Research STEPs Scenarios for the Transport System and Energy Supply and their Potential Effects WP6: Final reports kickoff Adriaan Nuijten Buck Consultants International

Adriaan Nuijten Bratislava, March 2006Slide 9 STEPs Final reports For Gothenburg conference: Main outcomes, conclusions and recommendationsFor Gothenburg conference: Main outcomes, conclusions and recommendations –Non-official –10-20 pages –Professionally designed, brochure-like –Design also to be used for EU report covers and conference advertisements Official reports for Commission

Adriaan Nuijten Bratislava, March 2006Slide 10 STEPs Final reports (2) Official EU Reports (after conference)Official EU Reports (after conference) –Publishable final report 1 Project execution 2 Dissemination and use –Final plan for using and disseminating the knowledge –Final management report –Final report on the distribution of the Communitys contribution

Adriaan Nuijten Bratislava, March 2006Slide 11 STEPs Final reports (3) Partners in WPPartners in WP –BCI (leading) and KUL-SADL Starts in AprilStarts in April BCI and KUL meet early AprilBCI and KUL meet early April Texts Gothenburg reportTexts Gothenburg report –to be ready in draft for Leuven Meeting –finalised in May EU reportsEU reports –Part of reporting on last phase –After Gothenburg conference