Park School Modernization Summer 2012. New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.

Slides:



Advertisements
Similar presentations
Tam Valley School Modernization - Phase 1 Summer 2011.
Advertisements

1 Zero Tax Increase Referendum: Community Information Session.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Strawberry Point School Modernization Summer 2012.
HJ S Properties 717 West Main Street, Ashland, WI Apartment Inspection Report - January 2012 Complete by Richards Management – Donald Richards CEO.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725.
Addressing Highest Priority Facility Needs
Progress and Status COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS.
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Edna Maguire School Modernization - Phase 1 Summer 2012.
Buckman Heights Elementary School Fire Report Presented by: Mr. Donald Mellema Facilities Manager Greece Central School District.
May 6, 2010 Irvine Unified School District HMC Architects.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Maintenance and Operations Report Summer Summer 2011 Custodial Update Budget Reductions: Reduced custodial staff by 1 full time equivalent Eliminated.
Hawthorne Plaza 715 N. 9 th Street Salina, Kansas
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
Fund-raising at Central Methodist Nursery School Progress over the last 15 years!
Prop W Independent Citizens’ Oversight Committee Lemon Grove School District Slideshow of Projects Board Presentation May 2013.
Suisun Valley School K Classroom Addition Project.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square.
13 SCHOOL SAFETY CONCERNS AND IMPROVEMENT TRCS Rensizzle Architecture 2013 By: Jonathan, Melanie, Khalil, Abd-Elrahman,Ram Report Investigation Date: October.
Identifying Information: Common Areas - 1 none LEVEL 2.
Riverside Community Schools Overview of Summer Maintenance Projects.
Practice House 1. Make a rectangular foundation 2. Put an interior wall in the middle. 3. Add an exterior door, interior door and at least one window on.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
Kitchen ItemCostWhereStyle Sink Faucet$135 (paid)C-listBrushed stainless Sink ` Main Countertop Island Countertop Island Cabinet Cabinet hardware.
Building Codes Intended to protect the public by establishing minimum standards of building safety.
BRVFD & RS Training Facility Proposal 05/07/2009.
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
HENDERSON MIDDLE SCHOOL “The Grand Old Campus” CAMPUS FACILITY ISSUES.
Seating Room for lighting, recording etc. Area behind Stage Wings Stairs Orchestra Pit Wall for Backdrops.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Galesburg C USD 205 · PSA–Dewberry · Russell Construction Company · Metzger Johnson IEFM Engineering · Bruner, Cooper & Zuck · Johnson Building Systems.
SUMMER 2015 DEFERRED MAINTENANCE
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Preparing For A REAC Inspection Presented by: Patrick Ortiz Lead Housing Programs Analyst New Mexico Mortgage Finance Authority (505)
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
Rosemead.
White Pigeon Community Schools
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Children’s Section of the Library Entrance lobby from Main Street looking east.
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
Wilson Addition. Wilson Addition.
Come see this special home today!
CSUEB Facilities Department Custodial Cleaning Frequency Expectations
May 8, 2018 Bond Program.
Campus Ministry Accessibility
The summer of 2018 and all the work that has taken place
Hannah Ehresman, Kelsey Russell, Kaitlyn Higgins, Lynette Akai
Q:\Pictures\Industrial\NWQ\Crescent IV\Crescent IV - pic for flyer.jpg
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Park Place Wesleyan Gala 2019
Governors club interior renovation
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Park School Modernization Summer 2012

New paint, new glass, new landscape, new flagpole, and new paving Before After Entry

New retaining wall, fence, and walkway around tree made of pavers Before After Sidewalk dead ends into tree

New paint, new asphalt, new lights, new railings, stairs, ramps, seat walls, planters, and planting Before After Southern entrance into school

New window glazing, water fountain, paint, asphalt, lighting and playground striping Before After Back of school

New addition to building adding 3 restrooms, covert old restroom to storage room, new planter with seat walls, plants, and new concrete walkways Before After Old boys restroom

New seat walls, planters, planting, walkways, asphalt, paint, new glazing, and covered walkway Before After Planter

New ball walls, seat walls, planters, planting, walkways, asphalt, paint, new window glazing, and covered walkway Before After Campus

New seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway Before After Campus

New ball walls, seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway Before After Campus

New Exit stairs, paint, and playground striping Before After Exit stairs

New exit stairs and playground striping Before After Exit stairs

New siding on Annex Building Before After Old siding on Annex Building

New ADA compliant ramp and retaining wall Before After Ramp

New entry store front, paint and railing Before After Entry

New Paint Before After Ceiling at front entry

New casework and paint Before After Resource room

New white boards, pin up boards, column cover, carpet, storage closet, ceiling lighting, and heater Before After Lower level classroom

New casework, flooring, in-fill walls, sink, lighting, paint and pin-up boards Before After Lower level classroom

Flooring, paint, pin-up panels, restroom addition, convert old restroom to storage room, and new fire alarm with sprinkler Before After Hallway

Building addition for three restrooms, new water fountain, fire alarm with sprinkler, flooring and paint Before After Hallway

New carpet, paint, door, counter, pin-up panels Before After Administrative offices

New wall creating nurse station, new paint, flooring, doors Before After Administrative Office

Remove wall, new casework, new sink Before After Staff work room

New window glazing where windows failed Before After Typical Classroom

New projector, screen, speakers, clock, paint, carpet, fire alarm with sprinkler, ceiling fans, and thermostat controls for radiator Before After Typical classroom

New storefront exit system, larger landing with abrasive action carpet new railing Before After Exit stairs

All new fixtures and finishes Before After Typical upper restroom