Park School Modernization Summer 2012
New paint, new glass, new landscape, new flagpole, and new paving Before After Entry
New retaining wall, fence, and walkway around tree made of pavers Before After Sidewalk dead ends into tree
New paint, new asphalt, new lights, new railings, stairs, ramps, seat walls, planters, and planting Before After Southern entrance into school
New window glazing, water fountain, paint, asphalt, lighting and playground striping Before After Back of school
New addition to building adding 3 restrooms, covert old restroom to storage room, new planter with seat walls, plants, and new concrete walkways Before After Old boys restroom
New seat walls, planters, planting, walkways, asphalt, paint, new glazing, and covered walkway Before After Planter
New ball walls, seat walls, planters, planting, walkways, asphalt, paint, new window glazing, and covered walkway Before After Campus
New seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway Before After Campus
New ball walls, seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway Before After Campus
New Exit stairs, paint, and playground striping Before After Exit stairs
New exit stairs and playground striping Before After Exit stairs
New siding on Annex Building Before After Old siding on Annex Building
New ADA compliant ramp and retaining wall Before After Ramp
New entry store front, paint and railing Before After Entry
New Paint Before After Ceiling at front entry
New casework and paint Before After Resource room
New white boards, pin up boards, column cover, carpet, storage closet, ceiling lighting, and heater Before After Lower level classroom
New casework, flooring, in-fill walls, sink, lighting, paint and pin-up boards Before After Lower level classroom
Flooring, paint, pin-up panels, restroom addition, convert old restroom to storage room, and new fire alarm with sprinkler Before After Hallway
Building addition for three restrooms, new water fountain, fire alarm with sprinkler, flooring and paint Before After Hallway
New carpet, paint, door, counter, pin-up panels Before After Administrative offices
New wall creating nurse station, new paint, flooring, doors Before After Administrative Office
Remove wall, new casework, new sink Before After Staff work room
New window glazing where windows failed Before After Typical Classroom
New projector, screen, speakers, clock, paint, carpet, fire alarm with sprinkler, ceiling fans, and thermostat controls for radiator Before After Typical classroom
New storefront exit system, larger landing with abrasive action carpet new railing Before After Exit stairs
All new fixtures and finishes Before After Typical upper restroom