AGEC/FNR 406 LECTURE 10 Rice drying on the Philippine National Highway.

Slides:



Advertisements
Similar presentations
LIBOR Finance 101.
Advertisements

Chapter 7 Capital Budgeting Processes And Techniques
Lecture-1 Financial Decision Making and the Law of one Price
© 2012 Jones et al: Strategic Managerial Accounting: Hospitality, Tourism & Events Applications 6thedition, Goodfellow Publishers Chapter 14 Capital Investment.
Hospitality Financial Management By Robert E. Chatfield and Michael C. Dalbor ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ.
Chapter 9 - Capital Budgeting Decision Criteria. Capital Budgeting: The process of planning for purchases of long- term assets.  For example: Suppose.
Capital Budgeting Processes And Techniques
Chapter 9. Capital Budgeting: the process of planning for purchases of long- term assets. n example: Suppose our firm must decide whether to purchase.
9-0 Chapter 9: Outline Net Present Value The Payback Rule The Discounted Payback The Average Accounting Return The Internal Rate of Return The Profitability.
© 2009 Cengage Learning/South-Western Capital Budgeting Chapter 8.
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
Capital Investment Decisions. learning objectives what is an investment the five main investment appraisal criteria methods accounting rate of return.
Ch9. The Basic of Capital Budgeting Goal: To understand the advantage and disadvantage in different investment analyzing tools Tool: - Net Present Value.
0 Net Present Value and Other Investment Criteria.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. NPV, Internal Rate of Return (IRR), and the Profitability Index.
KHALID AZIZ Capital Budgeting. 2 JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP MODULE.
Chapter 17 Investment Analysis
© Harry Campbell & Richard Brown School of Economics The University of Queensland BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets.
Financing Corporations Oct 8, Four Types of Cash Flows 1. Lump Sum Type Time 2. Annuity Type Time 3. Bond Type Time 4. Irregular Payment Type Time.
AGEC 608 Lecture 06, p. 1 AGEC 608: Lecture 6 Objective: Outline approach for discounting benefits and costs that accrue at different points in time Readings:
Valuation Under Certainty Investors must be concerned with: - Time - Uncertainty First, examine the effects of time for one-period assets. Money has time.
Internal Rate of Return (IRR). Is the rate of interest at which –The present value of expected cash inflows from a project Equals –The present value of.
Cost-Benefit Analysis. 2 Cost Benefit Analysis Identify & evaluate all costs & benefits Discount Assess project(s) by calculating Benefit/Cost Ratio (B/C)
Key Concepts and Skills
AGEC/FNR 406 LECTURE 9 Corn growing at site of former rainforest.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Net Present Value and Other Investment Criteria Chapter Nine.
Avimanyu Datta. Time Value of Money based on: * Discounted Rate can be different for Benefits and Cost. We will assume they are same.
Chapter 9. Capital Budgeting Techniques and Practice  2000, Prentice Hall, Inc.
Class 4 Benefit Cost Analysis
Economic Concepts Related to Appraisals. Time Value of Money The basic idea is that a dollar today is worth more than a dollar tomorrow Why? – Consumption.
Topic 9 Time Value of Money.
© 2010 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible Web site, in whole or in part.
9-0 Net Present Value and Other Investment Criteria Chapter 9 Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
ALI SALMAN1 LECTURE - 11 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Project Management Lecture 28 Dr. Arshad Zaheer Source: CASE material and online sources.
Steve Paulone Facilitator Sources of capital  Two basic sources – stocks (equity – both common and preferred) and debt (loans or bonds)  Capital buys.
Capital Budgeting Net Present Value (NPV)
Chapter 4 The Time Value of Money
Risk, Return, and the Time Value of Money Chapter 14.
Thank you Presentation to Cox Business Students FINA 3320: Financial Management Lecture 6: Time Value of Money – Part 1 The Basics of Time Value of Money.
Long-Term (Capital Investment) Decisions
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Net Present Value and Payback Module 2.2.
Analytical Tools Marginal analysis Discounted cash flow.
The Capital Budgeting Decision Chapter 12. Chapter 12 - Outline What is Capital Budgeting? 3 Methods of Evaluating Investment Proposals Payback IRR NPV.
Time Value of Money, Discounted Cash Flow Analysis (NPV) & Internal Rate of Return.
0 CHAPTER 10 Long-Term (Capital Investment) Decisions © 2009 Cengage Learning.
BNFN 521 INVESTMENT APPRAISAL Lecture Notes Lecture Three.
Ch. 10: Capital Budgeting Techniques and Practice  2000, Prentice Hall, Inc.
Chapter 6 Capital Budgeting Criteria. Capital Budgeting: The process of planning for purchases of long-term assets. For example: Suppose our firm must.
Chapter 8 Long-Term (Capital Investment) Decisions.
Net Present Value and Other Investment Criteria Chapter 8.
AGEC 407 Investment Analysis Time value of money –$1 received today is worth more than $1 received in the future Why? –Earning potential –Risk –Inflation.
Capital Budgeting Decision-making Criteria
CAPITAL BUDGETING CAPITAL: capital here refers to long term assets used in production BUDGET: is a plan that details projected inflows and outflows during.
Capital Budgeting. Typical Capital Budgeting Decisions Capital budgeting tends to fall into two broad categories...  Screening decisions. Does a proposed.
1 Economic Justification. 2 Used to evaluate project alternatives Compare projects Often a hurdle rate (eg. An IRR of > 20%) Variety of measurements:
 2005, Pearson Prentice Hall Chapter 9 - Capital Budgeting Decision Criteria.
1 Chapter 5: Essential Formulae in Project Appraisal A Coverage of the Formulae and Symbols Used to Evaluate Investment Projects.
CH 9 NET PRESENT VALUE AND OTHER INVESTMENT CRETERIA.
Introduction to Valuation: The Time Value of Money Net Present Value Internal Rate of Return.
© John Wiley & Sons, 2011 Chapter 12: Strategic Investment Decisions Eldenburg & Wolcott’s Cost Management, 2eSlide # 1 Cost Management Measuring, Monitoring,
Cost Benefit Evaluation Techniques
Fundamentals of Finance
Ch. 9: Capital Budgeting Decision Criteria
Rice drying on the Philippine National Highway
NPV and Other Investment Rules
Long-Term (Capital Investment) Decisions
التقييم المالي للمشروع
Payback and NPV By Sahar Hussein
Presentation transcript:

AGEC/FNR 406 LECTURE 10 Rice drying on the Philippine National Highway

Benefit-Cost Measures Lecture Goals: 1.Present three tools of benefit-cost analysis 2. Discuss advantages and disadvantages of BCA Don’t neglect to review the BCA packet!

Three BCA tools: 1. Net Present Value (NPV) 2. Benefit-Cost Ratio (BCR) 3. Net Present Value (NPV)

Net Present Value (NPV) The net present value of benefits is the present value of those net benefits. Net benefit is simply the sum of benefits minus the sum of costs. NPV is the current value of all net benefits associated with a project The net benefits are converted to present value by discounting.

NPV Formula

Key Point If the project has a NPV > 0, then it is worth considering on its economic merits. If the project has a NPV < 0, then it fails to return benefits greater than the value of the resources used.

NPV Example -50/(1+.1) 0 + 0/(1+.1) /(1+.1) 2 = -8.68

Benefit Cost Ratio (BCR) BCR is computed as the PV of Benefits divided by the present value of Costs. Discounted benefits and discounted costs are calculated and summed separately, then divided.

BCR Formula

Key Point If the project has a BCR > 1, then it is worth considering on its economic merits. If the project has a BCR < 1, then it fails to return benefits larger than its costs.

BCR Example Num. = 100/(1.1) /(1.1) /(1.1) 2 = Den. = 150/(1.1) /(1.1) 1 +50/(1.1) 2 = BCR = / = 0.97 < 1

Internal Rate of Return (IRR) The IRR is the maximum interest rate that could be paid for the project resources that would leave enough money to cover investment costs and still allow society to break even. The IRR is the discount rate at which the PVof benefits equals the present value of costs.

IRR Formula Solve for the IRR by finding i that solves: PV(Benefits) = PV(Costs) Use algebra or a spreadsheet

Key Point The IRR must exceed the chosen discount rate for the project to be accepted.

IRR Example 100/(1 + i) /(1 + i) /(1 + i) 2 = 150/(1 + i) /(1 + i) 1 +50/(1 + i) 2 i = 0

Advantages of BCA 1. Provides a framework 2. BCA is quantitative 3. BCA is based on facts 4. The methods provide clarity 5. Results allow comparability

Disadvantages of BCA 1. Requires valuation 2. Discount rate sensitivity 3. Plagued by uncertainty 4. Silent on equity 5. BCA is anthropocentric