Strategic Capacity Planning
Advertisements

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Chapter 5 Capacity Planning.
Halil SATIK Industrial Engineering Department, Dokuz Eylul University, Turkey.
CAPACITY PLANNING FOR PRODUCTS AND SERVICES.
Chapter 3: Strategic Capacity Management
Capacity Planning.
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Chapter 11 Strategic Capacity Management
Strategic Capacity Planning and Facility Location
Product and Service Design
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Strategic Capacity Planning for Products and Services McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 5 Strategic Capacity Planning
Capacity Planning ABI301.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J S 7-1 Operations Management Capacity Planning Supplement 7.
Chapter 5 Capacity Planning For Products and Services
Aggregate Capacity Planning Lecture # 5 Aggregate Capacity Planning Lecture # 5.
Strategic Capacity Planning for Products and Services
Example of a Decision Tree Problem: The Payoff Table
Global Manufacturing and Materials Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Capacity planning.
CAPACITY LOAD OUTPUT.
5–1. 5–2 Chapter Five Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Strategic Capacity Planning & Aggregate Planning
Strategic Capacity Planning Defined
Strategic Capacity Planning for Products and Services
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Decision Trees  Used.
Strategic Capacity Planning Based on slides for Chase Acquilano and Jacobs, Operations Management, McGraw-Hill.
Operations Management Capacity Planning Supplement 7
For Products and Services
Operations Management
Operations Planning Horizons
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
1 Slides used in class may be different from slides in student pack Chapter 11 Strategic Capacity Planning  Strategic Capacity Planning Defined  Capacity.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 4 Strategic Capacity Management.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Capacity Planning.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Strategic Capacity Planning for Products and Services Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without.
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
Tata McGraw CHAPTER 5 Strategic Capacity Management.
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
Strategic Capacity Planning for Products and Services McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Strategic Capacity Planning for Products and Services McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Fall 2015 Bruce Duggan Providence University College.
MGT 563 OPERATIONS STRATEGIES Dr. Aneel SALMAN Department of Management Sciences COMSATS Institute of Information Technology, Islamabad.
Capacity Planning Pertemuan 04
 Capacity is the ability of a process or system to hold, receive, store or accommodate.  In business terms, it is the amount of output that a system.
Operations Management For Competitive Advantage 1 Strategic Capacity Management Operations Management For Competitive Advantage Chapter 9.
Strategic Capacity Planning for Products and Services McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
STRATEGIC CAPACITY MANAGEMENT Chapter Five Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 3: Strategic Capacity Management
Chapter 5 Capacity Planning.
Operations Management
For Products and Services
Chapter 5 Capacity Planning.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 3: Strategic Capacity Management
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Stevenson 5 Capacity Planning.
Capacity Planning For Products and Services
Production and Operations Management
Capacity Planning For Products and Services
Presentation transcript:

1 EMBA-2, BUP EO Strategic Capacity Planning

EO M. AsadEMBA-2 Strategic Capacity Planning What is Capacity refers to an upper limit or ceiling on the load that an operating unit (plant, department, machine, stores and etc) can handle. Goal of Strategic capacity planning is to achieve a match between long term supply capabilities and predicted level of long term demand to supports the firms long term competitive strategy.

EO M. AsadEMBA-2 Basic questions in capacity handling 1. What kind of capacity is needed? – Depends on product/services that management intend to provide. 2. How much is needed? – The volume and certainty of anticipated demand – Strategic objectives in terms of growth, customer service and competitions – The cost of expansion and operation – Time Dimension of Capacity: Long Range Intermediate Range Short Range

EO M. AsadEMBA-2 Basic questions in capacity handling 3. When is it needed? –Capacity lead strategy –Capacity lag strategy –Average capacity strategy

EO M. AsadEMBA-2 Capacity Panning Concept Capacity used -rate of output actually achieved Best operating level -capacity for which the process was designed and thus is the volume at which average unit cost is minimized. Capacity Utilization Ratio revels how close a firm to its best operating point :

EO M. AsadEMBA-2 Design capacity = 50 trucks/day Effective capacity = 40 trucks/day Actual output = 36 units/day Efficiency = = 90% Effective capacity 40 units/ day Utilization = Actual output = 36 units/day = 72% Design capacity 50 units/day Designing Measuring Capacity Effective capacity-affected by periodic maintenance, lunch break, problem in scheduling and operation, imbalance line etc Actual capacity affected by breakdown, absenteeism, shortage and poor quality of raw material etc

EO M. AsadEMBA-2 Capacity Panning Concept Economies of Scale : as a plant gets larger and volume increases the average cost per unit of output drops. Reasons for economies of scale are: –Reducing the fix cost per unit –Construction costs increases at a decreasing rate –Processing costs decrease as output rate increases because operations become more standard. Diseconomies of Scale : when higher level of output cost more per unit to produce. Reasons for diseconomies of scale are: –Distribution costs increases due to traffic congestion and shipping from one large facility to several smaller ones. –Complexity increases costs, command and communication become more problem. –Inflexibility can be issue –Increased bureaucracy, slowing decision making and late approval

EO M. AsadEMBA-2 Capacity Panning Concept The Experience Curve - As plants produce more products, they gain experience in the best production methods and reduce their costs per unit Capacity Focus - The concept of the focused factory holds that production facilities work best when they focus on a fairly limited set of production objectives. –Plants Within Plants (PWP) extend focus concept to find best operating level Capacity Flexibility – Ability to increase or decrease production levels, or to shift production capacity from one product or service to another. –Flexible plants, Flexible process, Flexible workers

EO M. AsadEMBA-2 Determining Capacity Requirements 1. Forecast sales within each individual product line 2. Calculate equipment and labor requirements to meet the forecasts 3. Project equipment and labor availability over the planning horizon Capacity Cushion – is an amount of capacity in excess of expected demand. This may be positive or negative. –Positive Capacity Cushion - when a firms design capacity is more than capacity required to meet its demand –Negative Capacity Cushion - when a firms design capacity is less than capacity required to meet its demand

EO M. AsadEMBA-2 Example of Capacity Requirements A manufacturer produces two lines of mustard, FancyFine and Generic line. Each is sold in small and family-size plastic bottles. The following table shows forecast demand for the next four years.

EO M. AsadEMBA-2 Example of Capacity Requirements (Continued) : Equipment and Labor Requirements Three 100,000 units-per-year machines are available for small-bottle production. Two operators required per machine. Two 120,000 units-per-year machines are available for family-sized-bottle production. Three operators required per machine.

EO M. AsadEMBA-2 Question: What are the Year 1 values for capacity, machine, and labor? 150,000/300,000=50% At 2 operators for 100,000, it takes 3 operators for 150,000 At 1 machine for 100,000, it takes 1.5 machines for 150,000 © The McGraw-Hill Companies, Inc., 2004

EO M. AsadEMBA-2 Question: What are the values for columns 2, 3 and 4 in the table below? 56.67% % % % % % © The McGraw-Hill Companies, Inc., 2004

EO M. AsadEMBA-2 Example of a Decision Tree Problem A glass factory specializing in crystal is experiencing a substantial backlog, and the firm's management is considering three courses of action: A) Arrange for subcontracting B) Construct new facilities C) Do nothing (no change) The correct choice depends largely upon demand, which may be low, medium, or high. By consensus, management estimates the respective demand probabilities as 0.1, 0.5, and 0.4. A glass factory specializing in crystal is experiencing a substantial backlog, and the firm's management is considering three courses of action: A) Arrange for subcontracting B) Construct new facilities C) Do nothing (no change) The correct choice depends largely upon demand, which may be low, medium, or high. By consensus, management estimates the respective demand probabilities as 0.1, 0.5, and 0.4.

EO M. AsadEMBA-2 Example of a Decision Tree Problem (Continued): The Payoff Table The management also estimates the profits when choosing from the three alternatives (A, B, and C) under the differing probable levels of demand. These profits, in thousands of Taka are presented in the table below:

EO M. AsadEMBA-2 Example of a Decision Tree Problem (Continued): Step 1. We start by drawing the three decisions A B C

EO M. AsadEMBA-2 Example of Decision Tree Problem (Continued): Step 2. Add our possible states of nature, probabilities, and payoffs A B C High demand (0.4) Medium demand (0.5) Low demand (0.1) Tk 90 Tk 50 Tk 10 High demand (0.4) Medium demand (0.5) Low demand (0.1) Tk 200 Tk 25 - Tk 120 High demand (0.4) Medium demand (0.5) Low demand (0.1) Tk 60 Tk 40 Tk 20

EO M. AsadEMBA-2 Example of Decision Tree Problem (Continued): Step 3. Determine the expected value of each decision High demand (0.4) Medium demand (0.5) Low demand (0.1) A A $90 $50 $10 EV A =0.4(90)+0.5(50)+0.1(10)=$62 $62

EO M. AsadEMBA-2 Example of Decision Tree Problem Step 4. Make decision High demand (0.4) Medium demand (0.5) Low demand (0.1) High demand (0.4) Medium demand (0.5) Low demand (0.1) A B C High demand (0.4) Medium demand (0.5) Low demand (0.1) $90 $50 $10 $200 $25 -$120 $60 $40 $20 Tk 62 $80.5 Tk 46 Alternative B generates the greatest expected profit, so our choice is B or to construct a new facility Tk 82

EO M. AsadEMBA-2 Planning Service Capacity vs. Manufacturing Capacity Time: Goods can not be stored for later use and capacity must be available to provide a service when it is needed Location: Service goods must be at the customer demand point and capacity must be located near the customer Volatility of Demand: Much greater than in manufacturing Capacity Utilization & Service Quality Best operating point is near 70% of capacity From 70% to 100% of service capacity, what do you think happens to service quality?