Common Cause Variation

Slides:



Advertisements
Similar presentations
Control Charts for Variables
Advertisements

Quality Assurance (Quality Control)
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
Quality management: SPC II
Agenda Review homework Lecture/discussion Week 10 assignment
 Variable - a single quality characteristic that can be measured on a numerical scale.  When working with variables, we should monitor both the mean.
13–1. 13–2 Chapter Thirteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 10 Quality Control McGraw-Hill/Irwin
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
originally developed by Walter A. Shewhart
Statistical Process Control
Control Charts for Variables
MIM 558 Comparative Operations Management Dr. Alan Raedels, C.P.M.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
Control Charts are tools for tracking variation based on the principles of probability and statistics SPC: Statistical Process Control.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e KR: Chapter 7 Statistical Process Control.
Uses of sampling in Quality 1. Why sample? Samples give us information about a Population. For us, the population could be manufactured items, internet.
X-bar and R Control Charts
Statistical Applications in Quality and Productivity Management Sections 1 – 8. Skip 5.
There are no two things in the world that are exactly the same… And if there was, we would say they’re different. - unknown.
Created with MindGenius Business 2005® 3. Sampling (ELO) “A defined procedure whereby a part of a substance, material or product is taken to provide for.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Steps in Using the and R Chart
Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
Statistical Process Control Chapters A B C D E F G H.
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
Process Capability and SPC
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
Process Capability and Statistical Process Control.
Control Charts for Attributes
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control (SPC)
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
Chapter 6. Control Charts for Variables. Subgroup Data with Unknown  and 
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
Process Capability and Capacity COB 300 C Dr. Busing.
Statistical Quality Control
1 Six Sigma Green Belt Introduction to Control Charts Sigma Quality Management.
ENGM 620: Quality Management Session 8 – 30 October 2012 Process Capability.
Slide 1 Copyright © 2004 Pearson Education, Inc..
Quality Control  Statistical Process Control (SPC)
Quality Control All activities undertaken to control materials, processes and products in order to ensure quality of conformance Detects defects before.
In the name of Allah,the Most Beneficient, Presented by Nudrat Rehman Roll#
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
10 March 2016Materi ke-3 Lecture 3 Statistical Process Control Using Control Charts.
Les Jones IET 603. Shewhart Control Charts for: characteristics such as: length, width, temperature and volume. 1.Understand the statistical basis of.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Unit-3 Control chart Presented by N.vigneshwari. Today’s topic  Control chart.
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
1 Chapter 14 StatisticalProcessControl The Management & Control of Quality, 7e.
Assignable variation Deviations with a specific cause or source. Click here for Hint assignable variation or SPC or LTPD?
Acceptable quality level (AQL) Proportion of defects a consumer considers acceptable. Click here for Hint AQL or producer’s risk or assignable variation?
OPSM301 Operations Management Spring 2012
Tech 31: Unit 3 Control Charts for Variables
Quality.
Process Capability and Capability Index
acceptable quality level (AQL) Proportion of defects
Statistical Process Control (SPC)
Statistics 4/26 Objective: Students will be able to find measures of statistical dispersion. Standards: 1.02 Summarize and analyze univariate data to solve.
Agenda Review homework Lecture/discussion Week 10 assignment
IENG 486: Statistical Quality & Process Control
Effect of Measurement Error on SPC
Basic Training for Statistical Process Control
Basic Training for Statistical Process Control
Control chart (Ex 3-2) Subgroup No. Measurement Average Range Date
Glossary Attributes Data Average Basic Statistical Methods Capability
Steps in Using the and R Chart
Presumptions Subgroups (samples) of data are formed.
Presentation transcript:

Common Cause Variation Sampling and Process Monitoring

Attributes of Common Cause Variation It is the variation inherent to a Process. It cannot be reduced unless one changes the Process. It can be considered to be the background noise present in a Process. It can obscure signals of Special Cause Variation. It can be estimated Statistically. Estimates of Common Cause are derived from Sampling Plans.

What is a Sampling Plan? A protocol for collecting samples which we typically refer to as subgroups (i=1,…,k). The sampling protocol tells us how to select items for each sample (examples: random sampling, stratified random sampling, periodic sampling such as every 100 items, etc.) A protocol for measuring one or more characteristics of the items in the samples. The measurement protocol tells us what type of characteristic (quantitative or qualitative) is to be measured and how. The Sampling Plan will determine what we think Common Cause Variation is, i.e. within subgroup variation.

Estimating Common Cause for quantitative data. Common Cause Variation (or just Common Cause) is denoted . It is an estimate of Common Cause variation within the subgroups in terms of the standard deviation of the within subgroup variation. It is assumed that within subgroup variation is homogeneous (important assumption). For within subgroup variation to reflect Common Cause, the process must be sampled under the most homogeneous operating conditions possible

Estimating Common Cause Common Cause, σc , is estimated by either using the sample standard deviations or the ranges of the data in the subgroups. or where R-bar is the average of the Ranges of each of the subgroups and d2 is a constant.

Common Cause of Subgroup Averages If Then the standard deviation of X-bar is

Then 99% of the time… Our Subgroup means should be within three times of Which should be our approximate Process Mean.

Estimates of Common Cause are used to: Monitor the process for consistency of within subgroup variation using an R-bar or s chart. Monitor the process for signals of special cause when making comparisons between subgroup (shifts in the mean) using an X-bar chart. Comparing the process performance to specifications, for example, tolerance. This is done with a Capability study. Setting targets for future performance, for example, Six Sigma.

Questions: What does a sampling protocol do? What does a measurement protocol do? Is Common Cause signal or noise? Does our sampling plan actually tell us what Common Cause actually is? What measures of variation do we use to estimate Common Cause? What is the estimate of Common Cause actually useful for?