Hydropower Development Policy & Regulatory Framework

Slides:



Advertisements
Similar presentations
Regulatory Framework and Emerging Issues Mahesh Vipradas.
Advertisements

Orientation Session on International Public Sector Accounting Standards (IPSAS) September 1, 2009.
1 MDG Needs Assessment Process in Tajikistan Temur Basilia MDG Team Leader UNDP Tajikistan July 2005.
Reliability in British Columbia
- GDP 2011 versus 2010 – increase by 5.5%
1 Insurance Contracts Bill Richard Clarke QC October 2005.
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
18th amendment to constitution of pakistan
REGULATORY FRAMEWORK FOR ENERGY INFRASTRUCTURE INVESTMENT – GHANAS EXPERIENCE (PURC). ABUJA – NIGERIA MAY 1, 2008 By Commissioner Andrew Quayson Chairman,
formulation of national trade policies
PERSPECTIVES OF THE COMMON BALTIC ELECTRICITY MARKET Prof. Inna Steinbuka, Chair, Public Utilities Commission, Latvia The Institute of Economic Affairs.
New ways of thinking about management and organization are a key for Croatian participation in the European Union and in an integrated European Power.
The Role of ESCO in Wholesale Trade of Electricity (Capacity) ( REVIEW OF WHOLESALE TRADE OF ELECTRICITY) KUTAISI September,
1 Public Economics South African research topics Andrew Donaldson National Treasury August 2009.
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Global Marketing 20.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Hydropower Development: Experience of Nepal
1 FOREIGN INVESTMENT IN CUBA Republic of Slovenia October 15, 2013.
BY S. U. YAMUSA II AND A. H. ANSARI
6 -19 Nov Ministry of Industry Electricity of Vietnam Institute of Energy Participant To Thi NGOC Nov KOICA – Follow- Up Workshop in.
1 VIABILITY OF SOLAR ENERGY BASED ELECTRICITY GRID- REGULATORY CHALLENGES AND OPPORTUNITIES Nigerian Electricity Regulatory Commission, Abuja Presentation.
1 Georgian National Energy and Water Supply Regulatory Commission Activities of the Commission Summary Legal Department Maka Salkhinashvili 26 June - 3.
+ PROJECT BACKGROUND: KENYA THE NEED FOR CONSUMER PARTICIPATION IN THE REFORMS PROCESS OF THE ELECTRICTY SUB-SECTOR Susanne Rabisch, CUTS Nairobi.
Empowering Rural Electrification in Myanmar: Opportunities and Policies Tungapuri Hotel Nay Pyi Daw, Myanmar Dr. Chris Greacen March 9, 2013.
Electricity Reforms and Regulations in Nepal Navin Dahal South Asia Watch on Trade, Economics & Environment (SAWTEE)
Location Map - Nepal Nepal Source:Great Rivers of the World, National Geographic Society, 1984.
ACTIVITIES OF SUPPORTING SMES DEVELOPMENT IN VIETNAM
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
Competition and Regulation Interface in Developing Countries: Realities from the Power Sector By Ama Asantewah Ahene* and Emmanuel A. Codjoe** *Institute.
Second Conference on Legal Challenges and Opportunities of Mexico’s Increased Global Interaction American Bar Association Los Cabos, Mexico, November 2013.
INDIANA SHOULD STUDY ELECTRICITY CUSTOMER CHOICE & INDUSTRY RESTRUCTURING Regulatory Flexibility Committee Indiana General Assembly Philip R. O’Connor,
Electricity Reforms in Bangladesh
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Comparative Legal and Regulatory Framework of Nepal and India relating to Hydropower Development Advocate Amar Jibi Ghimire.
Policy and Regulatory Framework in Power Sector in Cambodia
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Prof F.D. Yamba I NTERNATIONAL S EMINAR REFIT AND CHALLENGES IN ZAMBIA 30 TH – 1 ST M ARCH, 2015.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Presentation on the Green Energy Act for South Simcoe Municipalities Susan Lloyd Swail M.E.S. Planning Candidate Intern at Nottawasaga Futures Green Economy.
Overview of NER and its Future Business Direction Presentation to Standing Committee on Minerals and Energy Parliament 09 May 2001.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
LEGAL FRAMEWORK, POLICIES AND REGULATIONS AND ORGANIZATIONAL SET UP IN INDIA -Dr. Aditi Raja Director, Finance, KPTCL
ANRE May, 19-20, 2008 Bucharest - Romania 1 Romanian Energy Regulatory Authority – ANRE – Regulatory Issues in Romania Bogdan Anton Expert ANRE – Annual.
1.
1. Mirza Hamid Hasan 29 September  Need for Regulation  Historical regulation authority and mechanism  Creation of present regulatory agencies.
Role of NEPRA - Looking Ahead Khalid Saeed September,
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
Institutional arrangement for energy statistics in India D. Sahoo Dy. Director General Central Statistical Organization, India.
LEGAL FRAMEWORK, POLICIES AND REGULATIONS AND ORGANIZATIONAL SET UP IN INDIA -Dr. Aditi Raja Director, Finance, KPTCL
Generation Subcommittee, Day Two Arne Olson Energy & Environmental Economics, Inc. (E3) Presented to: Subcommittee on Generation Resources Boise, Idaho.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
1 Per capita Energy Consumption National Energy Policy Declaration 1. Providing Basic Energy Needs 2. Ensuring Energy Security 3. Promoting Energy.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
RFPEG Belize 2013 Public Utilities Commission. Objectives of RFPEG Belize 2013 PUC Act: Section 22 (1)It shall be the duty of the Commission to ensure.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Budapest, September 28-29, 2004 RES – E market developement in Poland.
Commission Chairperson Phil Montgomery Presentation to Alaska Delegation September 5, 2014 Integrating Wisconsin’s Grid: an Energy Policy Perspective Public.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Nepal’s Water Resources at a Glance
POWER SECTOR REFORM: OPPORTUNITIES FOR THE NIGERIAN ENGINEERS
The Government Role in BOT
a. Financing b. Designing c. Construction d. Operating
Policies and Responsibilities of the State
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Presentation transcript:

Hydropower Development Policy & Regulatory Framework Keshab Dhoj Adhikari Senior Divisional Engineer Ministry of Water Resource 23 September 2008

What Constitute HP Policy Hydropower Development Policy-2001 Water Resources Strategy-2002 Electricity Act 1992 & Rules 1993 Periodic plans, annual budget speech, EPA & EPR, custom & tax provisions, etc.

What Constitute HP Policy contd… Other relevant Acts & Regulations Foreign Investment and Technology Transfer Act Company Act Electricity Tariff Fixation Regulation, etc.

Other important Acts on anvil Electricity Act and Rules (proposed) Nepal Electricity Regulatory Commission Act (proposed)

Institutions currently involved MoWR and DoED Electricity Tariff Fixation Committee Ministry of Environment, Science and Technology Ministry of Forest and Soil Conservation

Objectives of HP-2001 Generate electricity at low cost; Provide reliable and quality electricity at a reasonable price; Combine electrification with the economic activities; Extend rural electrification; and Develop hydropower as an export commodity

Key Policy Provisions (HP-2001) ‘Competition’ emphasized BOOT model; first sector to adopt one (not under the BOOT ACT) In case of multipurpose projects, GoN may participate Environment- 10% d/s release (min) Facilitate property acquisition

Key Policy Provisions (HP-2001) contd… Water rights guaranteed Various provisions for RE No expropriation Foreign exchange facility for dividend and loan Additional 5 year term (max) for projects at risk

Other Important Aspects of Policies Terms of License Survey License for 5 years Generation License Internal consumption 35 years Export Oriented 30 years In case of reservoir 5 years extension on the basis of construction period Captive Plant as it remains in operation Transmission and Distribution 25 years with ten years renewable

Some Important Aspects of Policies (contd..) Transfer of Projects Every hydropower project has to be transferred to the government, free of costs, after the completion of license period Licensee has to involve the government in the operation of the project two years prior to the completion of license period

Some Important Aspects of Policies (contd..) Utilization of Local Resources Developers are encouraged to- utilize Nepalese labour, skill, means and resources to the maximum extent possible and have to give priority to utilize local labour carry out works in such a way so as to transfer technology to the Nepalese citizens

Private Sector Participation Ever since Hydropower Development Policy 1992 was formulated, Government hasn’t turned back and made adequate policy commitments for the enhanced participation of private sector.

Emerging Institutions Independent Electricity Regulatory Commission (NERC) to replace ETFC with enhanced regulatory role Existing vertically integrated utility(ies) to be unbundled One agency will be allowed to do business either generation or transmission or distribution Separate Rural Electrification Fund

Establishment of Grid Authority Operation and control of the National Grid shall be in accordance with the Grid Code A Licensee may transmit the electric powers inside or outside the country by obtaining access to the National Grid No discrimination in accessing grid

Special provisions in new EA >100 kW developer-registered firm; <100 kW individual and firm After completion of submission, award of license Survey within 21 days Cap. <10 MW within 60 days 10 MW<Cap.<50 MW within 90 days Cap.> 50 MW within 120 days T & D within 90 days; Trade within 45 days 15

Special provisions in new EA A developer to get license either for generation or for transmission or for distribution except in special cases Security deposit for construction license Duration Survey license initially for 2 years and extension up to a total maximum of 5 years Generation 35 years for domestic consumption; 30 years for export 16

Special provisions in new EA Duration contd.. 15 years for thermal 35 years for captive hydro and in case of captive thermal till the industry is operated May be extended by 5 years, at the most, for storage projects May be extended by 5 years, at the most, if the project suffers from serious geological and hydrological uncertainties 25 years for transmission, distribution and trading 17

Provisions in new EA National Grid Power purchase & import/export GoN, in consultation with NERC, to declare national grid and its codes Indiscriminate access to grid Power purchase & import/export Price to be set on the basis of fixed percentage of avoided cost or average tariff or ROE Also by bidding following a NERC declared procedure NERC may declare other methods once power whole sale market is established 18

Provisions in new EA Import/Export Royalty (as per HP-2001) Trade license for power import and export No separate export license needed for export oriented generation licensee GoN may ask for selling 10%(max) of energy for domestic consumption Royalty (as per HP-2001) Applicable only for > 2 MW projects Currency of royalty payment same as the currency of power purchase 19

Water rights & environment Water rights ensured for generation period Downstream release of 10% of mean monthly flow or as stipulated in approved EIA report whichever is greater 20

Land acquisition, resettlement Govt. land and forest area to be provided on lease Govt. to facilitate acquiring private land and property Developers to compensate for land and properties thus acquired Developers to prepare and implement R&R plan 21

Tax Exemption custom duty 1% of cost of imported material and equipment and NO VAT Above exemption only for the construction period and applicable for spare parts also No income tax for > 2MW Income tax holiday for first 10 years after commissioning and first 7 years incase of transmission and distributio 22

Other incentives 15% tax on the annual income for generation companies Expatriates to get other incentives like foreign exchange, duty free and visa facilities Protection from change in law regarding tax exemption for the entire license period 23

Some other important provisions No expropriation All power projects to be considered as Priority Projects and incentives to be provided accordingly A bonus of 2% of net income (not exceeding annual salary) for the employees; the surplus in welfare fund Annual Reports to be submitted to NERC and DOED 24

Draft NERC Act NERC- 5 man strong commission (including at least a woman) GON appoints Chairperson and members of NERC Recommendation Committee VC (NPC), Coordinator Power sector expert from private sector (GON nominee), Member MOWR Secretary, Member 25

Draft NERC Act Eligibility criterion- Master degree in Economics or Commerce or Management or Accounts or Law or Engineering and a minimum of 10 years experience in relevant field 5 year term and can be reappointed for one more term 26

Roles and responsibilities Technical aspect Regulate for maintaining safety and quality Formulate policy and action plan for the reliability and effectiveness of power system Prepare O&M procedure code Prepare and enforce Grid code and distribution code Review LCGE and see whether a project fits it (not applicable for <10 MW) 27

Roles and responsibilities Tariff fixation Declare bases of tariff Determine wholesale price Determine PPA process and buy back rate for 1 to 10 MW plants Fix wheeling charge and retail tariff Review and provide consent to PPAs, etc. 28

Roles and responsibilities Maintain competition and protect consumers’ interest Avoid monopoly or find out ways and means to avoid monopoly Regulate merging, sale of plant, acquisition or takeover, etc. Capacity building and enhancing good governance in companies Advise GoN in related matters 29

Roles and responsibilities Monitoring and inspection Dispute resolution Impose fines- up to Rs. 500,000.00 Public hearing in the process of tariff fixation Employ a NGO to advocate on behalf of consumers NERC may review its own doing 30

Some other provisions in NERC Act NERC will get 1% of revenue from companies (except generation) Appeal in Appellate Courts 31

THANK YOU