PM Components PM_WO_310 PM_WO_310 Components PM_WO_310 Components.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

Números.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
1 WORKING WITH 2007 WORD Part 1 Developed October 2007 with lots of help from.
EuroCondens SGB E.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
& dding ubtracting ractions.
Copyright © 2013 Elsevier Inc. All rights reserved.
Addition and Subtraction Equations
Manuscript Central Training Author Center Module 2.
Slide 1 FastFacts Feature Presentation July 1, 2008 We are using audio during this session, so please dial in to our conference line… Phone number:
David Burdett May 11, 2004 Package Binding for WS CDL.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
1 Advanced Tools for Account Searches and Portfolios Dawn Gamache Cindy Bylander.
The 5S numbers game..
Office 2003 Introductory Concepts and Techniques M i c r o s o f t Windows XP Project An Introduction to Microsoft Windows XP and Office 2003.
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Welcome. © 2008 ADP, Inc. 2 Overview A Look at the Web Site Question and Answer Session Agenda.
Break Time Remaining 10:00.
The basics for simulations
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
Course Registration Overrides SLCM_WP_220 1SLCM_WP_220 Overrides.
PP Test Review Sections 6-1 to 6-6
1 IMDS Tutorial Integrated Microarray Database System.
User Friendly Price Book Maintenance A Family of Enhancements For iSeries 400 DMAS from Copyright I/O International, 2006, 2007, 2008, 2010 Skip Intro.
Microsoft Office 2007 Integration Integrating Office 2007 Applications and the World Wide Web.
2013 Fox Park Adopt-A-Hydrant Fund Raising & Beautification Campaign Now is your chance to take part in an effort to beautify our neighborhood by painting.
Regression with Panel Data
Office 2003 Introductory Concepts and Techniques M i c r o s o f t Office 2003 Integration Integrating Office 2003 Applications and the World Wide Web.
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
 Copyright I/O International, 2013 Visit us at: A Feature Within from Item Class User Friendly Maintenance  Copyright.
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
Adding Up In Chunks.
FAFSA on the Web Preview Presentation December 2013.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Facebook Pages 101: Your Organization’s Foothold on the Social Web A Volunteer Leader Webinar Sponsored by CACO December 1, 2010 Andrew Gossen, Senior.
When you see… Find the zeros You think….
GEtServices Services Training For Suppliers Requests/Proposals.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
1 GIS Maps and Tax Roll Submission. 2 Exporting A New Shapefile.
Subtraction: Adding UP
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
WorkKeys Internet Version Training
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Clock will move after 1 minute
& dding ubtracting ractions.
1.step PMIT start + initial project data input Concept Concept.
Page 1 Orchard Harvest ™ LIS Find a Patient Training.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
Outlook 2013 Web App (OWA) User Guide Durham Technical Community College.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
PM_WO_310 Components v41 PM Components PM_WO_310.
Presentation transcript:

PM Components PM_WO_310 PM_WO_310 Components PM_WO_310 Components

Course Content Introduction Unit 1- Components Process Unit 2 – Editing Components Unit 3 – Documents and Approvals Course Summary PM_WO_310 Components PM_WO_310 Components

Learning Objectives Upon completing this course, participants will be able to: Understand the PM components process through the work order Enter requests for materials on the components tab to generate through the work order Enter requests for services on the components tab through the work order Change components on work order Cancel components on work order Attach documents to a work order PM_WO_310 Components PM_WO_310 Components

Prerequisites and Roles UK_100 IRIS Awareness & Navigation PM_WO_300 Work Orders Roles PM Users PM_WO_310 Components PM_WO_310 Components

Unit 1 Components Process PM_WO_310 Components PM_WO_310 Components

Unit 1- Components Process Maintenance Process Components Process Stock, Non-Stock, and Non-File materials Enter Requisitions for Materials/Services Find Vendors PM_WO_310 Components PM_WO_310 Components

Materials and Inventory Materials Management Inventory will be replacing Stores Inventory Systems On-shelf inventory will be minimized Moving toward “just –in-time” inventory (parts will be requisitioned daily) Moving away from ProCard being used for materials; instead, contracts will be set up PM_WO_310 Components PM_WO_310 Components

Materials and Inventory There will be stock, non-stock, and non-file materials Materials may be planned (used on a routine basis) and unplanned Stock and non-stock will be identified by 6-digit numbers in IRIS PM_WO_310 Components PM_WO_310 Components

Components Process Components can be selected in several ways: A search may be performed to find the part number In the future, the Bill of Material (BOM) may be used to suggest part numbers, if it has been entered for the building, room, or equipment to be maintained In the future, if the BOM has been created, include the Task List on an order also will include any materials on that Task List PM_WO_310 Components PM_WO_310 Components

Planned Materials Planned stock materials result in a Reservation being created in the Storeroom Planned non-stock materials/services result in a Purchase Requisition being created Planned text items are instructions/comments about the materials required for a work order, such as a note to bring a ladder or supplies PM_WO_310 Components PM_WO_310 Components

Unplanned Materials Unplanned stock materials may be issued directly to a work order Storeroom MM Techs will issue the materials and charge it to the work order number The name of the person receiving the materials is recorded PM_WO_310 Components PM_WO_310 Components

Search for Components By Description The description is often used to search for maintenance orders Asterisks can be used as “wildcards” in a search, to let you search using partial information Examples: *bearing* will find all materials with “bearing” in the description *filter*16* will find all materials with “filter” and “16” in the description, such as Filter, Air, 16X20X1 PM_WO_310 Components PM_WO_310 Components

Search for Components By Bill of Materials (BOM) – Future Use BOMs are parts lists that may be created for any Building, Floor, Room, or Equipment BOMs list the parts frequently used to maintain that item Parts may be directly selected from the BOM BOMs can help plan work orders quickly PM_WO_310 Components PM_WO_310 Components

Search for Components By Task List (Future Use) Task Lists are maintenance procedures which include parts and labor These may be created for any Building, Floor, Room, or Equipment Including a Task List on an order will also include any materials on that Task List PM_WO_310 Components PM_WO_310 Components

Stock & Non-Stock Materials Parts which have IRIS material numbers and are kept in Central Stores Non-stock Materials Parts which are used less frequently, have IRIS material numbers, and are ordered as needed PM_WO_310 Components PM_WO_310 Components

Type the Order number and Press Enter Enter Components Type the Order number and Press Enter PM_WO_310 Components PM_WO_310 Components

Click on the Components Tab Enter Components Click on the Components Tab PM_WO_310 Components PM_WO_310 Components

Enter Components – Stock/Non-Stock Click on the Possible Entries icon to search The Material Search box will open PM_WO_310 Components PM_WO_310 Components

Enter Components – Stock/Non-Stock Click on the Tab List icon Several search tabs may be useful for finding the component PM_WO_310 Components PM_WO_310 Components

Enter Components – Stock/Non-Stock Enter the description or part of the description Click on the Continue icon PM_WO_310 Components PM_WO_310 Components

Enter Components – Stock/Non-Stock Double-click on the needed material PM_WO_310 Components PM_WO_310 Components

Enter Components – Stock/Non-Stock Enter the quantity required PM_WO_310 Components PM_WO_310 Components

Enter Components – Stock/Non-Stock For both Stock and Non-Stock items, the UM (Unit of Measure), IC (Item Category), and SLoc (Storage Location) will default PM_WO_310 Components PM_WO_310 Components

Enter Components – Stock/Non-Stock When you have finished adding Components, click on Save PM_WO_310 Components PM_WO_310 Components

Non-File Materials Non-File Materials Parts which are used less frequently, do NOT have IRIS material numbers, and are ordered as needed PM_WO_310 Components PM_WO_310 Components

Enter Components – Non-File Click in the Description field and enter a description of the needed material PM_WO_310 Components PM_WO_310 Components

Enter Components – Non-File Enter the quantity of components, unit of measurement, and the item category (N for Non-stock). The SLoc (storage location) for the delivery will default to Central Stores PM_WO_310 Components PM_WO_310 Components

Enter Components – Non-File Press Enter or click on the Continue icon PM_WO_310 Components PM_WO_310 Components

Enter Components – Non-File When the boxes appear, click on the Continue icon in the first box to close it PM_WO_310 Components PM_WO_310 Components

Enter Components – Non-File Requirement Quantity – defaults from what was entered on the Components tab Price – estimate of the cost Material Group – PM000001 for PM Non-Material Master Material, PM000002 for PM Non-Material Master Service PM_WO_310 Components PM_WO_310 Components

Enter Components – Non-File For Services – Enter PM000002 in the Material Group field PM_WO_310 Components PM_WO_310 Components

Enter Components – Non-File Purchasing Group – will default to 000/UK00 (000 = Work Order / UK00 = Purchasing PM_WO_310 Components PM_WO_310 Components

Enter Components – Non-File Goods Recipient – who receives the goods Requisitioner – who is requesting Unloading Point – where goods are delivered Vendor Material Number – plus additional description of the material (model, size, color, etc.) PM_WO_310 Components PM_WO_310 Components

Find Vendors – Non-File Click in the Vendor field, then click on the Possible Entries icon PM_WO_310 Components PM_WO_310 Components

Find Vendors – Non-File Click on the Tab List icon in the upper-right corner PM_WO_310 Components PM_WO_310 Components

Find Vendors – Non-File Click on UK Vendor Search PM_WO_310 Components PM_WO_310 Components

Enter Components – Non-File Enter the name or part of the name for the Vendor You can use wildcards (*) in your search Click on the Continue icon PM_WO_310 Components PM_WO_310 Components

Find Vendors – Non-File Double-click on the Vendor’s name PM_WO_310 Components PM_WO_310 Components

Find Vendors – Non-File Click on the Continue icon PM_WO_310 Components PM_WO_310 Components

Vendor Master Data A vendor master data is maintained in the IRIS system If a desired vendor is not found in the database the department should do the following: Download the UK Vendor Form located at http://www.uky.edu/Purchasing/vendapp102606.pdf or from UK’s forms page Submit to desired vendor for completion Fax or mail the completed form to Purchasing Once this form is received, Purchasing will create the vendor information in IRIS PM_WO_310 Components PM_WO_310 Components

Non-File Components If you accidentally close the Non-File component detail box before you entered all the necessary information, click on the Select icon to the left of the component PM_WO_310 Components PM_WO_310 Components

Non-File Components Click on the Purchasing button PM_WO_310 Components PM_WO_310 Components

Non-File Components You can enter the missing details PM_WO_310 Components PM_WO_310 Components

Non-File Components When you are finished, click on the Back icon to return to the Components tab PM_WO_310 Components PM_WO_310 Components

Summary Maintenance Process Components Process Stock, Non-Stock, and Non-File materials Enter Requests/Requisitions for Materials/Services Find Vendors Click Attachment (upper right corner) to view or print QRC Add Stock /Non-Stock Component and QRC Add Non-File Component PM_WO_310 Components PM_WO_310 Components

Unit 2 Editing Components PM_WO_310 Components PM_WO_310 Components

Unit 2- Editing Components Change requests/requisitions for materials/services Cancel requests/requisitions for materials/services PM_WO_310 Components PM_WO_310 Components

Change Components To Change a component: Pull up the work order Go to the Components Tab PM_WO_310 Components PM_WO_310 Components

Change Components Notice that the Stock and Non-stock components are grayed-out which means they cannot be changed by selecting a new component; you can change the quantity and Unit of Measure. PM_WO_310 Components PM_WO_310 Components

Change Components For the Non-File Component, you can change any of the information PM_WO_310 Components PM_WO_310 Components

Change Components To change the description of a Stock or Non-Stock component, click on the Select icon to the left of the component PM_WO_310 Components PM_WO_310 Components

Change Components At the bottom of the screen, click on the Delete Row icon When the Confirm. box appears, click on Yes PM_WO_310 Components PM_WO_310 Components

Change Components To add the new component, click on the Possible Entries icon to search for it The Material Search box will open PM_WO_310 Components PM_WO_310 Components

Enter Components – Stock/Non-Stock Enter the description or part of the description Click on the Continue icon PM_WO_310 Components PM_WO_310 Components

Enter Components – Stock/Non-Stock When the list appears, double-click on the item PM_WO_310 Components PM_WO_310 Components

Change Components Press Enter and the new component will be added PM_WO_310 Components PM_WO_310 Components

Cancel Components To cancel a component: Pull up the work order Go to the Components Tab PM_WO_310 Components PM_WO_310 Components

Cancel Components To cancel a component, click on the Select icon to the left of the component PM_WO_310 Components PM_WO_310 Components

Cancel Components At the bottom of the screen, click on the Delete Row icon When the Confirm. Prompt box appears, click on Yes PM_WO_310 Components PM_WO_310 Components

Summary Change requests/requisitions for materials/services Cancel requests/requisitions for materials/services Click Attachment (upper right corner) to view or print QRC Change Stock /Non-Stock Component, QRC Change Non-File Component, and QRC Cancel Components PM_WO_310 Components PM_WO_310 Components

Documents And Approvals Unit 3 PM_WO_310 Components

Unit 3- Documents and Approvals Entering item long text Attaching supporting documents Release approvals PM_WO_310 Components PM_WO_310 Components

Enter Item Long Text Comments about the Line Item can be entered in the Long Text area, which will print on the purchase order Click on the Create Text icon PM_WO_310 Components PM_WO_310 Components

Enter Item Long Text Enter detailed information about the line item in this field. This can be used for all Material Management numbers & for Non-File items Word documents can be directly cut and pasted to this section PM_WO_310 Components PM_WO_310 Components

Enter Item Long Text Click on the Back icon to close the Long Text window PM_WO_310 Components PM_WO_310 Components

Attaching Supporting Documents Supporting Documents can include: Certificates of insurance Drawings Warranties Quotes PM_WO_310 Components PM_WO_310 Components

Attaching Supporting Documents To attach a document, click on the Services for Objects icon PM_WO_310 Components PM_WO_310 Components

Attaching Supporting Documents Click on the Select icon to the left of Maintenance Order Click on the Enter icon PM_WO_310 Components PM_WO_310 Components

Attaching Supporting Documents Follow the menu and click on Create Attachment to immediately create the attachment PM_WO_310 Components PM_WO_310 Components

Attaching Supporting Documents In the Look In: field, find the document folder on your computer Double-click on the file name and the file will be attached immediately to the work order PM_WO_310 Components PM_WO_310 Components

View Attached Supporting Documents To view the attachment, click on the Services for Objects icon PM_WO_310 Components PM_WO_310 Components

View Attached Supporting Documents Click on the Select icon to the left of Maintenance Order Click on the Enter icon PM_WO_310 Components PM_WO_310 Components

View Attached Supporting Documents Click on Attachment List Note: When the Attachment List is in BOLD, a document is attached PM_WO_310 Components PM_WO_310 Components

View Attached Supporting Documents Double-click on the attachment to open it PM_WO_310 Components PM_WO_310 Components

View Attached Supporting Documents Click on the Close icon to close the document PM_WO_310 Components PM_WO_310 Components

Release Approvals Needed for over $10,000 per line item Follows normal approval process through the business officer PM_WO_310 Components PM_WO_310 Components

Summary Entering item long text Attaching supporting documents Release approvals Click Attachment (upper right corner) to view or print QRC Add Item Long Text and QRC Attach Supporting Documents PM_WO_310 Components PM_WO_310 Components

Help Websites For Quick Reference Cards Click on Attachment (upper right corner) Click on QRC Print myHelp website: http://myHelp.uky.edu/rwd/HTML/index.html Contains Quick Reference Cards (QRCs), updated course manuals, Simulations, Frequently Asked Questions, and other job aids IRIS website http://www.uky.edu/IRIS/ Contains Information Directory, Forms, and other references PM_WO_310 Components SLCM_WP_210 Grading

Course Summary Understand the PM components process through the work order Enter requests for materials through the work order Enter requests for services through the work order Change components on work order Cancel components on work order Attach documents to a work order PM_WO_310 Components PM_WO_310 Components

Course Assessment Instructions To begin the course assessment, click Continue (bottom left corner of the screen) Click Here to continue when the system message appears Click Start Test to continue If you pass the assessment successfully, click End Test (located at the bottom right of your screen Click Close (lower right corner of the screen) PM_WO_310 Components CM_200 Student Lifecycle Management Overview v11 Course Title v1

Course Completion Instructions Click Logoff (lower right corner) When the WBT window closes, go back to your original browser window Click on the browser window in your taskbar and wait for the screen to refresh Scroll down the page until you see the Confirm Participation section To complete the course, click Confirm Participation PM_WO_310 Components CM_200 Student Lifecycle Management Overview v11 PBC_200 Position Budget Control