8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright 2004 - All rights reserved Costs and Cash Flows.

Slides:



Advertisements
Similar presentations
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Advertisements

Accounting The Make up of Costs
1 LECTURE 6 The Cost of Capital Cost of Capital Components Debt Preferred Ordinary Shares WACC.
Flexible Budgets, Variances, and Management Control: II
Managerial Accounting
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Copyright 2008 The McGraw-Hill Companies 20-1 Economic Costs Profits Compared Short-Run Production Relationships Law of Diminishing Returns Short-Run Production.
Mathematics of Compound Interest
Some Practice Questions in Engineering Economics
Risk, Return, and the Time Value of Money
Copyright © Cengage Learning. All rights reserved.
Cost Analysis for Decision Making
Financial and Managerial Accounting
Financial Management Series Number 3 Using Net Present Value To Evaluate The Value of Money Over Time Alan Probst Local Government Specialist Local Government.
Key Concepts and Skills
5.2 Costs and Revenues IBBM.
Introduction to Cost Behavior and Cost-Volume Relationships
Income Measurement and Profitablity Analysis
Copyright © Cengage Learning. All rights reserved.
Chapter 9: Replacement Analysis
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 8 Capital Budgeting Cash Flows.
Cost-Volume-Profit Relationships
Capital Budgeting Cash Flow
The Time Value of Money.
Time Value of Money Time value of money: $1 received today is not the same as $1 received in the future. How do we equate cash flows received or paid at.
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Product and Service Design
Strategic Capacity Planning
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Capacity and Constraint Management
Capacity and Constraint Management
Chapter 5 Capacity Planning For Products and Services
Strategic Capacity Planning for Products and Services
Copyright Oxford University Press 2011 Chapter 2 Engineering Costs and Cost Estimating.
CHAPTER 1: UNDERSTANDING THE FINANCIAL PLANNING PROCESS.
2009 Foster School of Business Cost Accounting L.DuCharme 1 Decision Making and Relevant Information Chapter 11.
Chapter 5: Time Value of Money: The Basic Concepts
Pricing Decisions and Cost Management
Relevant Costs for Decision Making
Fundamentals of Cost Analysis for Decision Making
Product Costing in Service and Manufacturing Entities
FIRM BEHAVIOR AND THE ORGANIZATION OF INDUSTRY
Chapter 13 Preparing The Systems Proposal Systems Analysis and Design Kendall and Kendall Fifth Edition.
Cost-Revenue Analysis for Decision Making
Decision-Making Steps
Key Concepts and Skills
COST CONCEPTS AND DESIGN ECONOMICS
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 21-1 INCREMENTAL ANALYSIS Chapter 21.
CHAPTER 2 COST CONCEPTS AND THE ECONOMIC ENVIRONMENT.
Engineering Economy: Eide (chapter 13) & Chase (pages )
Operations Management
1. Cost Concepts & Design Economics
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Engineering Economics.
CTC 475 Review  Course Requirements  Applications  Multiple Decision Criteria  Selling The Project  PSP.
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
Accounting Principles, Ninth Edition
Financial and Managerial Accounting John J. Wild Third Edition John J. Wild Third Edition McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies,
Financial Project Metrics in Feasibility Study
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Time Value of Money Don’t put your.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
What is this course about?
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
CHAPTER 14 COST ANALYSIS FOR PLANNING McGraw-Hill/Irwin©The McGraw-Hill Companies, Inc., 2002.
Chapter 2 FUNDAMENTAL COST CONCEPTS
Costing and Finance P R Upadhyay.
CTC 475 Review Course Requirements Applications
Capacity Planning For Products and Services
Presentation transcript:

8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Costs and Cash Flows

2 Engineering Economic Analysis - Seven Steps 1. Recognize and formulate the problem. 2. Develop feasible alternatives. 3. Develop cash flows for each alternative. 4. Select a criterion (or criteria) for determining the preferred alternative. 5. Analyze and compare alternatives. 6. Select the preferred alternative. 7. Perform monitoring and post-evaluation.

3 Cash Flows A cash flow is a receipt or payment of an amount of money defined by 1) its dollar value and 2) the time of its occurrence Cash flow diagrams represent costs and revenues over time. Cost and Revenue estimation for the future always involve uncertainty.

4 Top-Down Estimate The first step in the determination of the cash flows is the estimation of costs and revenues. The top-down approach takes data from similar projects and modifies them to reflect the current project. Estimate your cost of a college degree: use the cost of your brother’s degree three years ago and adjust it for inflation. Add $5000 for the cost of your participation in extra curricular activities (your brother was a bookworm)

5 Bottom-Up Estimates The bottom-up approach is more detailed, breaking down the project in small manageable units and estimating the cost of the parts first. Bottom-Up: Break down anticipated expenses in categories: tuition and fees, books and supplies, living expenses, transportation and estimate each as accurately as possible.

6 Cost Terminology Variable costs change with the level of output Fixed costs do not change with the level output

7 Cost Terminology (cont’d) Recurring/Nonrecurring Costs: If costs occur every time the organization produces goods or services, they are called recurring. Variable costs are recurring. Direct/Indirect Costs: If costs can be reasonably measured and allocated to specific output, they are called direct. Overhead Costs: all costs of providing goods and services other than direct labor and direct material. Cash/Book Cost: Cost that involves a payment of cash is called a cash cost. Costs reflected in the accounting system only are called book costs.

8 Opportunity Costs Opportunity Cost: Cost of forgoing the chance to earn interest (or profit) on investment funds. Example: Your grandmother owns her home, but lives with your parents. She rents her $185,000-house for $400/month. Good idea or lost opportunity?

9 Sunk Costs Sunk Costs: Past costs that are unrecoverable are not relevant for decision-making purposes. Example: You are shopping for a new car, and, that afternoon, find one you really like for $1000. You leave a $100 deposit and plan to return the next day. That evening, your friend offers to sell you her car for $850. What to do think?

10 Life Cycle Costs

11 Life Cycle Phases The life cycle of a project is separated into two general time periods: the acquisition phase: needs assessments and definition of requirements conceptual design, advanced development, and prototype testing detailed design, production planning, facility and resource acquisition the operation phase: production or construction maintenance and support retirement and disposal

12 Life-Cycle Cost The Life-cycle cost is the sum of all the costs and revenues over the entire life of the structure, or system. All amounts are expressed in dollars and they must be time-equivalent. This time-equivalency is important because a dollar today is worth more than a dollar next year because of the interest (profit) it can earn.

13 Analysis Period The study period for a project is the life- cycle of the product, structure, system, or service studied. However, the accuracy of the cost and revenue estimates decrease with increases in the length of the period, and the effort required to develop cash flows increases with the length of the period. Thus, a shorter time horizon can also be selected.

14 Present Economy Studies When the influence of time on money is not a significant consideration, analyses are referred to as present economy studies Time horizon is one year or less No opportunity for earning interest or profit The criterion for selection is usually Select the alternative that maximizes profit Select the alternative that minimizes cost

15 Material Selection Example After machining, the finished volume of a certain metal part is 0.17 inch 3 Which raw material to choose? BrassAluminum Machining time/piece (min) Cost of material ($/lb) Scrap value ($/lb) 0.24none Cost of operator ($/hr) Density of material (lb/in 3 ) Volume of raw material (in 3 )

16 Labor and Material Costs Labor cost per piece = (time per piece)(labor cost per time) Brass: (0.64 min/piece)($12/hr)(1hr/60 min) = $0.128/pc Aluminum: (0.42 min/piece)($12/hr)(1hr/60 min) = $0.084/pc Material cost per piece = (volume of raw)(lb per volume)(cost per lb)- (leftover vol. of raw)(lb per vol.)(scrap value per lb) Brass: (0.3 in 3 )(0.31 lb/in 3 )($0.96/lb) - (0.13 in 3 )(0.31 lb/in 3 )($0.24/lb) =$0.080/pc Aluminum : (0.45 in 3 )(0.10 lb/in 3 )($0.52/lb) =$0.023/pc

17 Total Cost Brass: $0.128/pc /pc = 0.208/pc Aluminum: $0.084/pc /pc = 0.107/pc Choose aluminum to minimize total cost

18 Make vs. Buy Example A company, not operating at full capacity, is considering making a part currently bought. MakeBuy Direct Material$1.50 Direct Labor$1.35 Overhead - variable$0.90 Overhead - fixed$4.25 Total Unit Cost$8.00$7.50

19 Analysis Utilizing the excess capacity has no opportunity costs since the plant cannot invest unused capacity as easily as it can invest unused cash. Therefore, this product will not change fixed overhead for the plant. So the real cost per unit is: $ $ $0.90 = $3.75 Therefore, it is better to make the product in-house.