Electrical Safety Reference: The Power of Training Electrical Safety

Slides:



Advertisements
Similar presentations
Hazards Of Electricity
Advertisements

Captain I Gary C. Dize Health and Safety Division
Electrical Safety 1926 Subpart K ‑ Electrical
Copyright Alcohol Medical Scholars Program1 How to Give a Lecture Marianne Guschwan, M.D. NYU and Bellevue Hospital Susan F. Tapert, Ph.D. UCSD and VA.
Revenue Protection & Safety Field Safety. Safety First Section 1.5 Personal Protective Equipment.
6/4/2014ASHA Marketing Program1 American Saddlebred Horse Association Marketing Blueprint.
Electrical Safety.
Murray State University
Module 1: Safety. Objectives Outline safety rules that apply to conditions at homes, labs and workshops, and jobs. Identify electrical hazards and learn.
Best Practices: Rubber Insulating Gloves and Sleeves while Performing Distribution Power Line Tasks via the Live Line Tool Method.
 E4 Electrical Installation #1 Power Distribution.
MABAS Division 10 - Com Ed Program1 Electrical Safety Reference: The Power of Training Electrical Safety Commonwealth Edison Company.
10 The Service Entrance. 10 The Service Entrance.
Two-mode Safety and Battery System Service
ELECTRICAL SAFETY-RELATED WORK PRACTICES Qualified Persons Those people that have training in avoiding electrical hazards while working on or near exposed.
Electrical Safety and Grounding Essentials Copyright © Texas Education Agency, All rights reserved.
Electricity Service Delivery 2 Aim To provide students with information to enable them to deal with the effects of electricity at incidents.
Electrical Safety INSTRUCTOR’S NOTES:
Electrical Safety. Defective Insulation To protect you, electrical wires are insulated by a plastic.
Electrical Safety INSTRUCTOR’S NOTES:
Electrical Safety.
SAFETY State of Georgia BASIC FIRE FIGHTER TRAINING COURSE Module 1.
Safety Inspections & Hazard Recognition. Importance of Jobsite Safety Inspections Jobsite Inspections are a method of evaluating the implementation and.
1a.  Exposed part  Live or energized part  De-energized part 1a.
Chapter 8 Tools and Equipment. Introduction This chapter covers the following topics : Handling hand and power tools Storing hand and power tools Using.
Working On or Near Energized Conductors and FR Clothing.
Mitsubishi I-MiEV Isolation Procedure.
Working Safely Near Power Lines NOVA SCOTIA ASPHALT USER PRODUCER ASSOCIATION.
E4 Electrical Installation
EQUIPMENT FOR SAFETY SMKN 13 Bandung.
E4 Electrical Installation
Personal Protective Equipment
A4 Insulator Changeout.
Electrical Safety.
Cutting an In-Line Dead-end Single Phase
Murray State University
Voltage Regulator Bypass
A 3 Insulator Changeout with Jib
C 4 Insulator Changeout With Hoists
Equipotential Grounding Procedures Protective Grounding Training
Protective Grounding Single Phase Tangent
C5.21L Three Phase Dead End Insulator Changeout
A4 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives.
Cutting in Bells Single Phase
Cutting in Bells Three Phase
C3 Insulator Changeout With Jib
Relocating a Three Phase Transformer Bank
A1 Pole Changeout Energized
Adding an A5 tap to an A1 © 2018 Iowa Association of Electric Cooperatives DISCLAIMER: This job hazard analysis (JHA) has been made available for informational.
A 3 Insulator Changeout with Jib
C3 Insulator Changeout With Jib
C3 Insulator Changeout With Hoists
Cutting an In-Line Dead-end Single Phase
A1 to A6 Conversion Tangent to Double Dead End
A5 Insulator Change Transformer Pole
A2 Pole Changeout Energized
A1 Pole Changeout Energized
A 3 Insulator Changeout with Jib
Installing a single phase tap on an existing C1.11
A1 Insulator Changeout Energized
A4 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives DISCLAIMER: This job hazard analysis (JHA) has been made available for informational.
Cutting an In-Line Dead-end Single Phase
Protective Grounding Single Phase Tangent
C5.21L Three Phase Dead End Insulator Changeout
Pad mounted 120/240 open 4 wire service
Adding an A5 tap to an A1 © 2018 Iowa Association of Electric Cooperatives.
Voltage Regulator Bypass
A2 Insulator Changeout Energized
C1 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives.
A1 Insulator Changeout Energized
Presentation transcript:

Electrical Safety Reference: The Power of Training Electrical Safety Commonwealth Edison Company MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program Knowledge Objectives The Firefighter shall be able to: Explain the basic function of overhead wires and equipment Identify Type A and S Meters Explain hazards of step potential, touch potential, vehicles in contact with energized lines, and downed wire movement MABAS Division 10 - Com Ed Program

Performance Objectives Given the proper tools and equipment, the firefighter shall be able to: Remove residential meters Conduct low voltage electrical tests Cut service entrance “drip loops” MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program Introduction This program is designed to train firefighters in properly removing meters or cutting drip loops to disconnect service to a residence that is on fire. ComEd prefers that the electrical service be left intact Call ComEd for service disconnects MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program If the Incident Commander decides the service must be disconnected immediately: Call ComEd Open buildings main disconnect Remove meter if necessary Cut drip loops when meter cannot be removed Utilize Voltage Tester to verify power disconnect MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program Firefighters are only to remove the meter to the residence that is on fire MABAS Division 10 - Com Ed Program

Transmission & Distribution System Power Plants Switchyard Transmission Substation Distribution Transformers Residential Service MABAS Division 10 - Com Ed Program

Transmission Pole Configuration Highest voltage is usually located at top of pole. Other voltages may be present on pole also Transmission Poles Distribution Poles Secondaries Cable and Phone may also be present MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program Residential Meters Removable (type S) Non Removable (type A) MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program Downed Wires Voltage Gradient is present Consider the Step Potential Guarding wires and exposed live electrical equipment Principles for guarding wires, and electrical equipment Precautions Rescue Procedures MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program

All cables & wires must be treated as energized until proven dead ! MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program Service Wires Identifying Service Drop Cable Open Wire construction Triplex Identifying telephone and cable wires MABAS Division 10 - Com Ed Program

When service is to be interrupted Follow these steps: Don protective equipment Open Mains if possible Remove meter if necessary Cut the tap (drip loops) at the house MABAS Division 10 - Com Ed Program

Safety Equipment Needed Rubber glove set Leather over rubber Eye/Face protection Full Protective clothing recommended Voltage Tester Meter Cover Hotstick MABAS Division 10 - Com Ed Program

Rubber gloves and protectors Precautions Testing and Inspecting Exchange MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program Live Line Tool Also known as Hotstick Inspect for damage prior to use Tool may be used for cutting drip loops only!! MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program Low Voltage Tester Tests for de-energized circuits Tests for secondary voltage Checking & using Condition Operation Interpreting the tester reading MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program Removing a Type S Meter Protective Clothing required Open disconnect if possible Remove meter Cut meter seal with wire cutters Remove meter retaining ring Contact top outer edge with a downward and outward angle Grasp meter with two hands and pull straight out. Do not twist meter while removing MABAS Division 10 - Com Ed Program

Steps for Cutting Drip Loops Identify the drip loop at building Identify the neutral wire first DO NOT CUT X and Y conductors should be cut Separate two parts from each other Cut neutral wire Avoid cutting support wire if present MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program

MABAS Division 10 - Com Ed Program Summary This program was designed to aid the firefighter on the scene of a fire or emergency to correctly and safely remove electrical hazards. WHEN IN DOUBT, WAIT FOR ComEd TO ARRIVE ON THE SCENE MABAS Division 10 - Com Ed Program

Written Exam and Practical Take 15 question written examination Complete practical evaluation Cut Drip loop connection Identify type A and S meters Remove type S meter MABAS Division 10 - Com Ed Program