2005 INDE SYSTEMS Co.,Ltd. All rights reserved INDE SYSTEMS CO., LTD. 300 CHONCHON-DONG, SUWON, 440-746, SOUTH KOREA / TEL: +82-31-290-7457 / FAX: +82-31-299-6782.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
CALENDAR.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 10 second questions
ZMQS ZMQS
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Bright Futures Guidelines Priorities and Screening Tables
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
: 3 00.
5 minutes.
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Presentation transcript:

2005 INDE SYSTEMS Co.,Ltd. All rights reserved INDE SYSTEMS CO., LTD. 300 CHONCHON-DONG, SUWON, , SOUTH KOREA / TEL: / FAX: AIM 33 Images EF Joining Process H. J. Shin INDE Systems Co., Ltd.,

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-before heating

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-heating 1sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-heating 23sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-heating 45sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling 34sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process- 1min 1sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling1min 14sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling 2min 3sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling 3min 22sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling 4min 8sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling 4min 58sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling 5min 47sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling 6min 38sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling 7min 27sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling 8min 19sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling 9min 8sec

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling 9min 58sec design cooling time ends

INDE SYSTEMS Co.,Ltd. All rights reserved EF Joining Process-cooling 12min 17sec