NuSTORM 26-26 March 2013 CERN Welcome and introduction.

Slides:



Advertisements
Similar presentations
Introduction to the objectives and structure of the workshop Birgitte Kjær ETC/SCP & Jasmina Bogdanovic EEA 2013 workshop on Waste Policy Implementation.
Advertisements

MICE & nuSTORM V. Blackmore University of Oxford Neutrino Oscillation Workshop September 13 th, /30V. Blackmore: MICE.
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Neutrinos in CHIPP Allan Clark Neuchâtel Meeting June 2004.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
Frictional Cooling MC Collaboration Meeting June 11-12/2003 Raphael Galea.
3/31/2005 KEK, Japan 1 G4Beamline for KEK test K. Yonehara Illinois Institute of Tech.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
A. Kurup, I. Puri, Y. Uchida, Y. Yap, Imperial College London, UK R. B. Appleby, S. Tygier, The University of Manchester and the Cockcroft Institute, UK.
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
The meeting in Paris: The agenda has been built and optimized.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
Opportunities for Experiments Based on Stored Muon Beams at Fermilab Milorad Popovic Jean-Francois Ostiguy Fermilab August, 2014.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
Round-table: Discussion on Future Machines. With the discovery of the Higgs Boson Self-consistent model (SM) accounting for all Particle Physics phenomena.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
European design study on Neutrinofacilities - Euronu within FP7.
ESSnuSB Project for Leptonic CP Violation Discovery based on the European Spallation Source Linac NOW 2014, 10/9E. Wildner, CERN 2 Elena WILDNER CERN for.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
STORM STATUS & E.Wildner, CERN Acknowledgements to all nuSTORM collaborators arXiv: v1.
General Introduction Markus Nordberg (CERN DG-DI-DI) 1
Proposal Preparation. Documents for June PAC  Full Proposal  Starting point is LOI + updates in EOI  Project Definition Report  Cost estimate  Excel-based.
Neutrinos from Stored Muons STORM physics with a μ storage ring.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Science Requirements and Instrumentation for Future Neutrino Experiments Gina Rameika, Fermilab Instrumentation Frontier Community Planning January 9 –
K. Long, R. Roser, 23 July 2014 Report from the Neutrino Summit.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
EUROnu Review: 14 th April 2011 Summary of WP3 J. Pozimski.
Goals of the consultation meetings From the ToR, the goals of the meeting in the first year should be: communicate that the panel exists; collect input.
A neo-conventional neutrino beam Moving beyond Simon van der Meer’s paradigm.
A Muon-based Accelerator Staging Scenario (MASS)
Accelerator R&D for Future Neutrino Projects
Kickoff close-out Joerg Jaeckel, Mike Lamont, Claude Vallée.
Neutrino beams from the decay of muons
nuSTORM at Fermilab D Adey
MOMENT Overview Jingyu Tang Institute of High Energy Physics, CAS
EDM kick-off meeting Introduction
Welcome !! to the Conference on Beam Diagnostics
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
nuSTORM: Neutrinos from STORed Muons
nuSTORM and the Physics Beyond Colliders workshop
Accelerator R&D for Future Neutrino Projects
Neutrino Oscillation Physics with a Neutrino Factory
Future physics at nuSTORM
NuSTORM - μ Storage Ring with Injection
Neutrino beams in China
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.1 Coping with climate change European Commission Research.
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Present and Future test facilities for High-intensity Targetry CERN
XVth International Workshop on Neutrino Factories, Betabeams and Superbeams LAGUNA-LBNO Many thanks to D. Duchesneau, F. Di Lodovico, T. Patzak, A. Rubbia.
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
What is μ-e Conversion ? μ μ-+(A,Z)→e-+(A,Z) muon decay in orbit
Based on material presented at various meetings
Understanding Neutrino Events at Liquid Argon Detectors
Presentation transcript:

NuSTORM March 2013 CERN Welcome and introduction

Welcome Coffee breaks: we may need to go to the restaurant, self service Dinner transportation has to be timely: 26 Mars 18 :10 de 18 :10 Bat 866 aile D et dépôt des personnes au restaurant 1 (Glassbox) C02 tomorrow C02 Please keep timing! Hope you will enjoy

864-1-C02

Next Generation neutrino facilities EU Strategy o Long Baseline (MH, CP) o World Wide Collaboration o Staging How to get there o Building test Facilities including crucial Technology Features o Evaluate, with accuracy, physics reach and potential for high precision measurement facilities o Worldwide collaborative efforts to pave the way to a high precision neutrino and muon program STORM gives essential opportunities to evaluate/test o Production/capture of pions o Transport/Injection o Magnets o Instrumentation/Diagnostics o Detectors o Etc. STORM has discovery potential o e and e -bar cross-section o Sterile neutrinos o …

Workshop aim Set up and sign an EOI to get support to: Investigate in detail how STORM could be implemented at CERN (CDR, TDR) Develop options for decisive European contributions to the STORM facility and experimental programme if STORM done elsewhere STORM would give essential information to go further to develop neutrino/muon physics facilities

The facility Find a suitable proton beam (Energy, pulse length, structure, etc.) Develop a target station & proton absorber Design an efficient pion capture/transport system Detectors Pion extraction (gives possibilities to use pions for more physics) Design injection system Ring Design and instrumentation STORM potential compared classical neutrino production on target