SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department1 Test Facilities for HEP and Photon Science at SLAC FACET ● NLCTA ● ASTA ● ESA ● ESB.

Slides:



Advertisements
Similar presentations
Balance Chemical Reactions Kentlake Science Department2 Synthesis Reactions Occur when two or more substances combine to form one compound.
Advertisements

Plasma Wakefield Acceleration at CLARA G. Xia Cockcroft Institute University of Manchester 113/01/2014IoP CLARA Community Meeting.
L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures.
SLAC Electron Beam Test Facilities 5 MeV to 20 GeV Carsten Hast, SLAC SiD Workshop, Oct. 15 th, SLAC 2013 FACET ● ESTB ● NLCTA ● ASTA.
SLAC Electron Beam Test Facilities 5 MeV to 23 GeV Carsten Hast, Head Test Facilities SAREC Meeting at SLAC, July 2013 FACET ● ESTB ● NLCTA ● ASTA.
Sub-femtosecond bunch length diagnostic ATF Users Meeting April 26, 2012 Gerard Andonian, A. Murokh, J. Rosenzweig, P. Musumeci, E. Hemsing, D. Xiang,
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011.
ESTB Test Beam Procedures User Support Operations Schedules Carsten Hast March 17 th 2011.
ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.
SLAC Accelerator Research and Introduction to SAREC Tor Raubenheimer FACET Users Meeting August 29 th - 30 th, 2011.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
Welcome! Mauro Pivi SLAC, ESTB Workshop March 2011, SLAC.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Accelerator Systems Division FACET Accelerator Overview John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
AS Diagnostic Collaboration Mark Boland
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Low Emittance RF Gun Developments for PAL-XFEL
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
NLCTA and ESA (Next Linear Collider Test Accelerator and End Station A) Carsten Hast Test Facilities Department Head SLAC DOE HEP Review July 7 – 9, 2008.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
FACET Update ARD Status Meeting Christine Clarke April 14 th 2011.
The End Station Test Beam (ESTB) at SLAC Carsten Hast For the everlasting never giving up SLAC Test Beam Gang R. Erickson, T. Fieguth, C. Hast, J. Jaros,
SLAC End Station A Test Beam ESTB Carsten Hast SLAC National Accelerator Laboratory ALCPG11 Eugene, Oregon March 22 nd, 2011.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD.
SLAC ARD Test Facilities Tor Raubenheimer December 8 th, 2010.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
Overview of Beam Diagnostics from the Advanced Accelerator Concepts Workshop (AAC06) Vic Scarpine Instrumentation Meeting 20 Sept 2006.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
End Station A Test Beam Facility ESTB Carsten Hast SiD Workshop SLAC, January 16-18, 2013,
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
SLAC Accelerator Research Program Tor Raubenheimer SLUO Meeting, July 17, 2009.
1 June 7, 2006M. Woods, SLAC Collimator design, wakefields (T-480) BPM energy spectrometer.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Carsten Hast User Facilities for HEP and Photon Science at SLAC
Beam dynamics for an X-band LINAC driving a 1 keV FEL
The FACET Facility at SLAC
Status and Interest of the X-ray FEL SINAP
Chris Adolphsen Sergei Nagaitsev
SuperB Injection, RF stations, Vibration and Operations
End Station A Test Beam ESTB Design, Performance, Infrastructure, Status Mauro Pivi, SLAC on behalf of the ESTB team: C. Hast, T. Beukers T. Fieguth, R.
SLAC ESTB End Station A Test Beam Other Test Beams
Paul Scherrer Institut
Electron Source Configuration
End Station Test Beam (ESTB) at SLAC
Advanced Research Electron Accelerator Laboratory
FACET Accelerator Overview
SLAC Beam Test Facilities Overview (emphasis ESTB) Carsten Hast, SLAC
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
FACET Accelerator Overview
Linac Diagnostics Commissioning Experience
Presentation transcript:

SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department1 Test Facilities for HEP and Photon Science at SLAC FACET ● NLCTA ● ASTA ● ESA ● ESB ARD, December 2010 Carsten Hast Test Facilities Department

SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department2 ESA ESB & NLCTA FACET ASTA

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department3 Test Facilities Cast of Characters

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department4 ARD Test Facilities’ Goals High Energy Physics –Support Research for Linear Collider High and Ultra High Gradients Plasma Acceleration Direct Laser Acceleration Machine Detector Interface Studies –Detector Development LC Detectors B-Factories others Photon Science –Gun Development New Materials New Designs Different Frequencies –Novel Seeding Techniques for FELs and other FEL Fundamentals Echo Enabled Harmonic Generation Emittance exchange THz Radiation Coherent Optical Transition Radiation etc.

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department5 Accelerator Structure Test Area (ASTA) Stephen will talk about that in a little while

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department6 End Station Test Beam (ESTB) at ESA World’s only high-energy primary electron beam for Test Beams Kick 13.6 GeV LCLS beam to ESA x 10 9 e - 5 Hz

Kicker Magnets and other Hardware 4 new kicker magnets for BSY including power supplies and modulators and vacuum chambers are designed and components are being ordered Build new PPS system and install new beam dump ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department7

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department8 ESA Experimental Area Beam

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department9 ESA Infrastructure Available Instrumentation Trigger counters Halo veto counters High resolution beam hodoscope Particle ID (Cerenkov, TOF, shower counter) Small, high field solenoid sturdy support table with remote movers Cranes 15 and 50-ton cranes available

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department10 18 feet Wakefield boxWire ScannersRF BPMs T-487: long. bunch profile “IP BPMs” T-488 Ceramic gap for EMI studies BPM energy spectrometer (T-474/491) Synch Stripe energy spectrometer (T-475) Collimator design, wakefields (T-480) Bunch length diagnostics (T-487) Smith-Purcell Radiation IP BPMs—background studies (T-488) LCLS beam to ESA (T490) Linac BPM prototypes EMI (electro-magnetic interference) Irradiation Experiments Dipoles + Wiggler ESA Primary Beam Equipment Layout

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department11 ESTB Detector Test Area Beam spot:  < 1mm

Enlisted Help! Mauro joined the ESTB team and will lead the effort to make ESA “usable” again –Need to reinstall BPMs which are on loan to Berkley –Complete the beam line –Install a dump –Improve the experimental infrastructure –Clean Up!!!!!!!!!!! ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department12

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department13 ESTB Status New BSY kicker magnets, power supply and vacuum chambers –All items are in the design and purchasing stage (based on existing hardware) –Will be installed during the down March/April 2011 New small beam dump for ESA –Design is clear –Radiation protection calculations are ongoing –Will be installed early 2011 New Personnel Protection System (PPS) –Design has started and implementation plan is under development –Scheduled to be done by June 2011 There will be a User Workshop at SLAC Thursday, March in conjunction with 2011 Linear Collider Workshop of the Americas (ALCPG11), University of Oregon in Eugene, March 19-23, 2011 First beam summer 2011

SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department14 End Station B

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department15 ESB NLCTA TTF Couplers Marx Modulator X-Band Plasma Switches L-Band Laser E-163 DLA S-Band Gun Echo-7RF Testing XBTA Big Pipe 2-Pack

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department16 Big Pipe (aka: C^2 pipe dreams) Remember: Chris A. describing the Klystron Cluster Concept for ILC?

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department17 Big Pipe (on steroids…) B-Target Room

SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department18 End Station B

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department19 NLCTA Plans Improve NLCTA –Control System, more uniform DAQ –Better beam diagnostics –Fix Phase jitter (between klystrons and lasers) –Install another RegenAmplifier in laser room for more flexibility –And many more Ongoing Program –Echo Echo 7-15 Narrow-band beatwave THz emission Studies COTR properties and micro-bunching instabilities –Continue E-163 –Continue X-Band RF tests New Installations –Upgrade spectrometer –Install transverse cavities for increased slice energy spread Redo EEHG Emittance Exchange with transverse cavities New X-Band Test Area –structure testing –X-Band gun with100 MeV linac

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department20 X-Band Test Area

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department21 Coherent Optical Transition Radiation Gerard Agostino Diktys

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department22 Coherent Optical Transition Radiation Goal of the experiment: Reconstruct transverse distribution of micro-bunching in amplitude and phase Far Field only Far Field and Near Field simultaneously Phase can be found with a phase retrieval iterative algorithm We have invited Diktys to give a seminar about that next year

Preliminary Results Decent signal from microbunching instability but few photons survive after bandpass filter Unexpected Interference pattern in the far field zone Pattern appears at two locations along NLCTA Etalon effect in the exit vacuum window? Near future plans: COTR imaging and ECHO experiments are compatible More data will be gathered during ECHO runs with motorized camera lenses ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department23

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department24 FACET Update

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department25 FACET User Area

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department26 FACET User Trailer User trailer is in purchasing, had job walk this morning and are waiting for bids

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department27 SAREC Review Process SLAC Accelerator Research Experimental program Committee –evaluate the merit of proposed R&D in SLAC’s experimental accelerator research facilities for advancing world-class accelerator science or accelerator technology –evaluate the feasibility of proposed R&D in SLAC’s acc. res. facilities –review the progress of existing R&D in SLAC’s acc. res. facilities 1 st Meeting: January 10 th to 12 th 2011 Members: Uwe Bergmann (SLAC), Gerry Dugan (Cornell), Eric Esarey (LBL), Jie Gao (IHEP), Kathy Harkay (ANL), Carsten Hast (SLAC, Scientific Secretary), Sergei Nagaitsev (FNAL), Andrei Seryi (Chair, John Adams Institute) Vitaly Yakimenko (BNL), Kaoru Yokoya (KEK) Frank Zimmermann (CERN) Sarec was a Vulcan astrophysicist and elder who served as the ambassador to Earth during the 2240s and 2250s. He was married to a Human woman, Amanda Grayson, and was the father of Spock and Sybok.

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department28 FACET Proposals Review SAREC Agenda: Monday 10 th Morning: Tour of FACET and ESB Afternoon: Welcome, ASTA,NLCTA and FACET status Tuesday 11 th Presentation of FACET proposals Wednesday 12 th (closed) Q/A for each proposal Discussion Briefing of ARD management

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department29 FACET Proposals FACET Proposals: –Ultrafast Processes in Magnetic Solids (Durr, SLAC) –Plasma Wakefield Acceleration (Hogan, Joshi, Muggli, SOCAL) –Opical Diffraction Radiation Beam-size Monitor (Lumpkin, FNAL) –Metallic Structures Periodic Structures (Tantawi, SLAC) –Wakefield Acceleration in Dielectric Structures (Rosenzweig, Travish, Hogan, Muggli, SOCAL) –Bunch Time Profile Measurement using Smith-Purcell Radiation (Reichold, OXFORD) –Measurements for the CLIC Study (Schulte, CERN) –PASER (Schachter, TECHNION) –HG Dielectric Wakefield Measurments (Kanareykin, EUCLID TECHLABS) –THz Radiation (Frisch, SLAC)

ARD Test FacilitiesCarsten Hast - ARD Test Facilities Department30 FACET Schedule Construction finished in May 2011 Linac down ends May 15 th LCLS User run starts June 2 nd Bring up Sectors 0 to 20 late May Start beam operation of S 0 to 20 and damping ring during June User Assisted Commissioning and Early Science July and August 2010 FACET project will install new chicane in S10 during September to November CD4 review in December 2011 First User Run mid January 2012 to end of March 2012

SLAC User FacilitiesCarsten Hast - ARD Test Facilities Department31 Summary We do a lot of stuff ASTA ESA ESB FACET User Area NLCTA Plus a little bit of LCLS and ATF II Want to help? –NLCTA upgrades and future run plans need a lot of ARD support Let’s talk how YOU can help!!!!!!!!