Earthwork Profile Leveling 1.

Slides:



Advertisements
Similar presentations
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Advertisements

Fill in missing numbers or operations
AP STUDY SESSION 2.
1
& dding ubtracting ractions.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
1 When you see… Find the zeros You think…. 2 To find the zeros...
Whiteboardmaths.com © 2004 All rights reserved
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
CALENDAR.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
The basics for simulations
Factoring Quadratics — ax² + bx + c Topic
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
The Frequency Table or Frequency Distribution Table
MAT 205 F08 Chapter 12 Complex Numbers.
Leveling {Differential Leveling}
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
Do Now 4/17/13 Take out HW from last night. Copy HW in your planner.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
When you see… Find the zeros You think….
Before Between After.
25 seconds left…...
Subtraction: Adding UP
: 3 00.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Static Equilibrium; Elasticity and Fracture
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
& dding ubtracting ractions.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
1 Applications Stream cross sections Highways Canals Sewers Water mains Sidewalks Retaining walls Fences Application of Differential Leveling Introduction.
Unit: Surveying Lesson: Differential Leveling
Section II Applications of Measurements
Differential Leveling
Presentation transcript:

Earthwork Profile Leveling 1

Profile Leveling To collect data about topography along a reference line. Mainly to compute volumes of cut and fill for a proposed linear structure, such as: highways, railroads, transmission lines, canals. Then the best route can be chosen. The result: elevations at definite points (stations) along a reference line, usually the center line. 4

Staking and Stationing the Reference Line First, topography is studied, a center line is chosen. Second, points (stations) are marked (staked). Stations are set at starting and ending points, then intermediate stations. Distance between the intermediate stations is usually 100ft, could be less if topography is rough. Stationing: a system adopted to specify the relative positions of points along the reference line. Distances are written in the form of a sum: A + B. A is hundreds of feet, B is feet. 5

For example station K is (10+24. 5) = 1024 For example station K is (10+24.5) = 1024.5ft from a certain zero, may not exist. First station is usually designated with arbitrary value: 10+00, 100+00 To compute distances along the line, erase the + sign, and subtract the two numbers Distance between the stations:(20+68) and (30+34) = 3034 - 2068 = 966 ft 6

First a backsight at a BM is observed. Then, a number of intermediate foresights are observed at the stations needed, do not have to be at equal distances. When the distance becomes too long, or readings become hard to observe, a turning point is constructed. You cannot keep the backsight distance equal to the foresight distance. 9

Figure 5.11 Profile leveling.

Elevation computation: Elevation of line of sight (LS) = EBM + BSBM. Elevation of any intermediate point = ELS - FSIP. Handle new level positions as in differential leveling, construct a turning point and knowing BS and FS readings, compute a new elevation of line of sight. See figure (5-12) page 119 for example of field data and adjustment.

Leveling for other Purposes BS IS IS IS FS BS FS 1 4 5 2 3 6 A LEVELING PROCESS THAT INCLUDED 6 POINTS AND 7 READINGS.

Point BS IS FS HI = E + BS Elevation (E) = HI – (IS or) FS BM 761 2.11 Example: Compute the elevations of points 1 through 5 if the elevation of the BM is 22.13 ft Point BS IS FS HI = E + BS Elevation (E) = HI – (IS or) FS BM 761 2.11 22.13 1 1.14 2 0.95 3 1.76 0.84 4 2.01 1.55 5 1.88

Point BS IS FS HI = E + BS Elevation (E) = HI – (IS or FS) BM 761 2.11 Answer Point BS IS FS HI = E + BS Elevation (E) = HI – (IS or FS) BM 761 2.11 22.13 1 1.14 2 0.95 3 1.76 0.84 4 2.01 1.55 5 1.88 = 2.11 + 22.13 24.24 = 24.24 – 1.14 23.10 = 24.24 – 0.95 23.29 = 23.40 + 1.76 25.16 = 24.24 – 0.84 23.40 = 23.31 + 2.01 25.32 = 24.86 – 1.55 23.31 23.44 = 25.32 – 1.88

Drawing and Using Profiles Drawn using a software now.The following is for reference only, will not be in exams. To manually draw a profile and compute earthwork: {the following is for reference only, will not be included in exams} Assume the horizontal axis is the distance and the vertical axis is the elevation. Use a larger scale for the elevation than the distance scale, usually 10 times larger. Draw the design line at the proposed grade. Compute the areas of cut and fill. Multiply area by width to get volumes. Gradient (percent grade) is the rise or fall in ft per 100 ft, or meter per 100 meter. 10

Figure 5.13 Plot of profile.