Subdivision Plat Submittals Subdivision Plat Submittals

Slides:



Advertisements
Similar presentations
Unit 12 Construction Surveying
Advertisements

Boundary Surveys. Lecture Outline Cover Boundary Surveys as needed by civil engineers to locate a site ( property) Sections covered: parts of 21-1 to.
Land or Site Description
Legal Descriptions and Site Plan Requirements
Board of County Commissioners
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
Guidelines for accepting Report of Water Right Conveyance Forms (100%) 1.Terminology 2.Questions to ask yourself when reviewing a report of water right.
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON.
Standards of Practice Route Surveys Title 46 Professional and Occupational Standards Part LXI. Professional Engineers and Land Surveyors 1.
Florida Real Estate Principles, Practices & Law 38th Edition
Plot Plans & Legal Descriptions. Site or Plot Plans  A plot or site is an area of land generally one lot or construction site in size  The term plot.
Real Estate Law Legal Descriptions of Property Real Estate Law Legal Descriptions of Property.
Land or Site Description Wayne Foss, MBA, MAI, CRE Foss Consulting Group
S U R V E Y R E P O S I T O R Y F I L I N G I N F O R M A T I O N Survey Filing Information Quick Reference N E B R A S K A S U R V E Y R E C O R D R E.
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
HOW DOES PLATTING AFFECT MY WASTEWATER PERMIT APPROVAL? A PRESENTATION BY EMIL HADDAD, R.P.L.S. E.I.C. SURVEYING COMPANY.
Weld County Division 6 Wind Generators and Permitting Requirements Sec Wind generator standards. Chris Gathman, Planner III, Weld County WIND.
Planning & Community Development Department Amendment to Fuller Master Plan 135 North Oakland Avenue Predevelopment Plan Review City Council Meeting June.
Platting – Subdividing the Land Surface – Subdivision Process – Development Process Fragmenting Space – Real Property Units.
Planning & Community Development Department 245 South Los Robles Avenue Predevelopment Plan Review City Council December 8, 2014.
Property Rights and Legal Descriptions Chapter 2.
Platting Update Orange County BCC January 27, 2015.
LAFCO Procedures: There’s a Lot Going On Behind the Scenes Roseanne Chamberlain Executive Officer Amador LAFCO Staff Workshop April 3, 2008.
Chapter 14 Legal Descriptions and Site Plan Requirements.
Sharman S. Brooks Senior Planner Kristine Goddard, AICP Principal Planner
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Chapter 12 Legal Descriptions and Site Plan Requirements.
PLANNING DEPARTMENT CITY OF PEARLAND PLANNING DAY MARCH 13, 2008.
Public Hearing (PH 1) City Council Meeting February 7, 2012.
Principles of California Real Estate Lesson 1: The Nature of Real Property.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
SURVEYING AND LAND RECORDS MANAGEMENT: A LIST OF THE MOST COMMON MISTAKES IN LAND RECORDS AND AN ANALYSIS OF HOW THEY OCCUR.
Site Plan Requirements © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture.
A 1,240 Acre Master Development Plan Proposal, West of Willcox, AZ. Cochise County Board of Supervisors August 23, 2011 Docket MDP / Z
Request for Plat Abandonment for the Kayenta Estates Minor Subdivision (S-06-02) Board of Supervisors December 4, 2012.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Chapter 15 Site Plan Layout. Driveway style and Slope Design Considerations  Minimum lawn slope of 5% for first 10’ (5/8” per foot)  Minimum concrete.
COURSE 900 Day 2 - Property Descriptions Welcome to the International Right of Way Association’s R3.PPT
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
Public Hearings June 30, Case: CDR Project: Village F Master PD / LUP Applicant: Eric Warren, Poulos & Bennett District: 1 Acreage:1,
How to Read Site Plans and Development Plans Mary Pennock, Principal Planner Lee Garman, Principal Planner 2014 Commonwealth Planning and Zoning Conference.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Easements, Establishments, Abandonments and Vacations.
S Bachmann Springs Phase One Subdivision Abandonment Request.
Modern Real Estate Practice in Pennsylvania 12th Edition Chapter 4: Legal Descriptions.
Alachua County Plat Review Process January 26, 2010.
North Carolina General Statute May 2009 Gary Thompson, PLS work
Permit Process & Application Guide
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Subdivision Process. Subdivision – Sketch Plan Subdivision Preliminary Plan.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
ANNEXATION Statutory Overview July 19, 2011 David L. Yearout, AICP, CFM.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Site plans/Lot of record/Tenant houses Subdivision Plats Combined Preliminary/final Addition Correction Plat of public taking Plat of court action Preliminary.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
1 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Items 6D & 6E ZA & ZA OWNERS:Timothy & Lori Livingston and James.
Chapter 2 Reading Site Plans. Chapter Overview Introduction to Reading Site Plans Understanding Legal Descriptions Site Plan Fundamentals Topography Reading.
Presented by Kelsey Lang, Planning Associate June 27, 2016
Political & Billboard Signage
Florida Real Estate Principles, Practices & Law 39th Edition
Common Surveys Used For Commercial Real Estate Transactions
Modern Real Estate Practice in Illinois
Boundary Surveys 1.
Site Plan Requirements
AMBASSADOR WEST – CHANGES TO APPROVED PROJECT TO RESET ENTITLEMENT TIME LIMITS (City Ventures) City Council 3/28/11.
Competency: Create site plan drawings
Subdivision Applications
Item #: 3.1 Public Hearing – Vacating Lot 15 of Cherapple Farms, Plat C, and Lot 17 of Cherapple Farms, Plat E, and approving the final plat of Cherapple.
Presentation transcript:

Subdivision Plat Submittals Subdivision Plat Submittals Wichita - Sedgwick County Metropolitan Area Planning Department

Agenda Subdivision Committee Meeting Calendar Fee Calculation Signs Filing a Complete Application for Approval Submitting a Complete Plat Sketch Plat Preliminary Plat Final Plat

Subdivision Committee Meeting Calendar Available end of December Included in Subdivision Application Packet About 23 meetings a year Closing dates: 17 days prior to Subdivision meeting at noon

Fee Calculation Based on number of lots for Residential plats Based on acreage for Non-Residential plats Based on combination of lots and acres for Residential/Non-Residential plats

Fee Calculation (cont’d) Preliminary plat fee same as One-Step plat Small Tract plat – 5 lots with no new streets; 10 ac. for residential; 5 ac. for non-residential Final portion of overall Preliminary plat Revised plat fee Replat as condition of zone change Payable within 7 days

Sign Courtesy to neighbors Up 13 days prior to Subdivision meeting Primary street frontage visible to motorists

Filing a Complete Application Pre-application conference if controversial City vs. County General location Tax control number Gross size, no. of lots, minimum area Zoning: existing and proposed New streets Owner’s signature

Submitting a Complete Plat 40 folded copies Associated CUP drawings, conditional use site plans Minimum scale 1:100; 1:200 if over 100 acres Maximum size 24 x 36 Disk for GIS

Sketch Plat 5 copies Distribution to City or County Engineering, Water/Sewer or County Code, Traffic Engineering Letter sent within 3 weeks OR 40 copies Review by Subdivision Committee

Preliminary Plat Existing Conditions Name of plat VICINITY MAP 69TH ST. NO. 53RD ST. NO. WEST ST. MERIDIAN AVE. SEC. 13, T26S, R1W SITE Date, north point and scale “Preliminary Plat” title Vicinity map Name on plat that matches application name

Preliminary Plat (cont’d) Existing Conditions Adjoining plat name or owner’s name Legal description Existing zoning/proposed zoning Associated zone case, conditional use or CUP Existing driveway locations on property, abutting property and property across street

Preliminary Plat (cont’d) Existing Conditions Streets within or adjacent to plat (ROW width) Easements (access easement and pipeline easement documents) Topographical survey FEMA mapped 100-year floodplain Natural features e.g. lakes, tree rows

Preliminary Plat (cont’d) Existing Conditions Existing structures denoting those to be removed Existing sanitary sewers, storm sewers, water lines, pipelines, gas lines, underground wiring on property or adjoining streets Tax parcel map for County plats denoting existing ownership pattern

Proposed Subdivision Plat Preliminary Plat Proposed Subdivision Plat New streets (ROW width, names) Access controls Proposed easements Lots (dimensions, lot area, lot numbers) Setback lines (optional) Drainage concept

Final Plat Name of plat Date, scale, north point, legend Legal description Tie points to section corners or platted lot corners Tract boundary lines Lot lines with dimensions

Final Plat (cont’d) Street ROW widths, centerlines and names for new or existing streets within and adjacent to plat Existing easements with recording information or referenced in plattor’s text if proposed Lot and block numbers Setback lines (optional)

Final Plat (cont’d) Minimum building pads established Reserve language in plattor’s text Certifications of owner, mortgagor, surveyor, MAPC, County surveyor, City Council for City plat or 3-mile ring, County Commissioners for County plats, County Clerk, Register of Deeds Title work

Final Plat Tracing Mylar and 4 copies Supporting documents Submitted at least 2 weeks prior to City Council meeting Closure computations CD Title work Check for recording

Frequent Subdivision Problems

Commercial Plat

SITE - LOOKING NORTHWEST 53RD ST. N.

SITE - LOOKING NORTH 53RD ST. N.

Q & A’s