Info Requirement Model OPERATIONSPLANNINGDESIGNCONSTRUCTION ESDACESDACESDACESDAC 2 111 22 2 1 = MUST HAVE FOREWARD PASS BACKWARD PASS = NICE TO HAVE (If.

Slides:



Advertisements
Similar presentations
Info Requirement Model OPERATIONSPLANNINGDESIGNCONSTRUCTION ESDACESDACESDACESDAC = MUST HAVE FOREWARD PASS BACKWARD PASS = NICE TO HAVE (If.
Advertisements

Building Information Management (BIM)
The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex.
Models. The Future of Building Services Model Content.
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
BIM EXECUTION PLANNING PROCESS
06/06/07 – 07/11/07 BIM Building Information Modeling.
PROJECT TIME CONTROL. PROJECT SCHEDULING REFERENCES PRIMARY REFERENCE IN THIS PRESENTATION IS Operations Management, Ed 6, Heizer & Render, Prentice Hall,
Designer contractor engineers Builders Owner.
Welcome.. Guide Continue Welcome to the BIM Execution Planning Guide Tool. When prompted, please provide the appropriate information. If there are questions.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
Typical phases of a project: 1.Schematic Design 2.Design Development 3.Construction Documents 4.Construction Administration.
Projmgmt-1/25 DePaul University Project Management I - Dynamics Of Estimation Instructor: David A. Lash.
Phase Difference = Phase Difference = 0.05.
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Project Execution Planning for Building Information Modeling A buildingSMART Alliance project sponsored by: The Charles Pankow Foundation Construction.
Project Execution Planning for Building Information Modeling A buildingSMART Alliance project sponsored by: The Charles Pankow Foundation Construction.
Interior Construction
Project Execution Planning for Building Information Modeling
Facility: 8 Buildings: Administration, Cargo, NII (2), Export Control, Maintenance Garage, Veterinary Services, POV Secondary Inspection Tenants: CBP,
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Predesign Conceptual Design Design Development Detailed Design & Documentation Construction Operations and Maintenance.
Project Execution Planning for Building Information Modeling Progress Meeting #2 – July 29 th, 2008 A buildingSMART Alliance project sponsored by: The.
Trimble Buildings An example of a business strategy dependent on 3D indoor mapping and modeling Trevor Venter & Brent Godfrey November 2013.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
BIM-GIS Larisa Kruger, GISP Enterprise GIS Manager The Ohio State University.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
UTSA WAYFINDING September 29, 2010 Business Affairs: Your Partner for Successful Solutions Next Steps.
The Influence of BIM on Quantity Surveyors Presented by: Syukri Zulkipli Alex Lim.
Overview of Building Information Modeling What does it mean for Civil Engineering?
Operation & Maintenance Construction & Logistics 4D/5D Construction Fabrication Documentation Analysis Detail Design Conceptual Design Programming Renovation.
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Virtual Building Solutions Better Buildings. Better Built. BIM Marketing.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
What does a Civil Engineer do?
The Construction Process TimeCost Linked Schedules Linked Estimating Recipes The Building Model: 5D Concept.
Copyright 2013 Field Training Services Pre Job Planning Tim Faller Field Training Services
Dana K “Deke” Smith FAIA Birgitta Foster Executive Director Assisting Director buildingSMART alliance 1.
The Western Renewable Energy Zone Initiative: Phase 1
advices for advancing the productivity of the construction industry:
7D 6D 5D 4D 3D bIM Dimensions bIM Services ESTIMATING
Bond Oversight Committee
BIM EXECUTION PLANNING PROCESS
EXTRA SLIDES.
Evaluating Utility Allowance Options
Project Execution Planning for Building Information Modeling
CONTRACT DOCUMENTS & CONSTRUCTION
Design Quality (30%) - 6slides Explain your key concept? (2slides)
HPC on a collective journey in 1D-6D
 BIM Training across the AEC industry is continuing apace. Students and professional need to acquire skill- based training and knowledge to meet the.
BIM EXECUTION PLANNING PROCESS
ريكاوري (بازگشت به حالت اوليه)
Inspection Metrics Gerry Fallon.
Computer-Integrated Design and Manufacture of Façades
Facility Asset Data Exchange (FADE) Construction phase
Telescope Ray Diagram Click to see each stage.
Far Experimental Hall Hutches Civil Construction
Traffic light SMART product innovation Method name Traffic Light
DBIA Manual of Practice

North Augusta High School – Phase 2A and 2B
For More Details:
Presentation transcript:

Info Requirement Model OPERATIONSPLANNINGDESIGNCONSTRUCTION ESDACESDACESDACESDAC = MUST HAVE FOREWARD PASS BACKWARD PASS = NICE TO HAVE (If Low Impact Cost)

CONSTRUCTION ESTIMATINGSCHEDULINGDOC MGMTANALYSISCOORDINATION Quantity Take-offs ROM Estimating Detailed Estimating Constructability Reviews Site Planning 4-D Scheduling 3D Shop Drawing Review Quantity Take-offs 4-D Project Phasing 4-D Tenant Phasing 4-D Construction Sequencing COORDINATION 3D MEP Coordination 3D Design Coordination Digital Fabrication 3D Laser Scanning 3D As-Built Project Progress (% Complete) Emergency Evacuation Plan LEED Rating Analysis 3D As-Built Energy / Lighting Analysis Form Work Design O & M Training O & M Manuals

CONSTRUCTION ESTIMATINGSCHEDULINGDOC MGMTANALYSISCOORDINATION Quantity Take-offs ROM Estimating Detailed Estimating Constructability Reviews Site Planning 4-D Scheduling 3D Shop Drawing Review Quantity Take-offs 4-D Project Phasing 4-D Tenant Phasing 4-D Construction Sequencing COORDINATION 3D MEP Coordination 3D Design Coordination Digital Fabrication 3D Laser Scanning 3D As-Built Project Progress (% Complete) Emergency Evacuation Plan LEED Rating Analysis 3D As-Built Energy / Lighting Analysis Form Work Design O & M Training O & M Manuals

CONSTRUCTION ESTIMATINGSCHEDULINGDOC MGMTANALYSISCOORDINATION Quantity Take-offs ROM Estimating Detailed Estimating Constructability Reviews Site Planning 4-D Scheduling 3D Shop Drawing Review Quantity Take-offs 4-D Project Phasing 4-D Tenant Phasing 4-D Construction Sequencing COORDINATION 3D MEP Coordination 3D Design Coordination Digital Fabrication 3D Laser Scanning 3D As-Built Project Progress (% Complete) Emergency Evacuation Plan LEED Rating Analysis 3D As-Built Energy / Lighting Analysis Form Work Design O & M Training O & M Manuals

Detailed Estimating Models Required Model Level of Detail Compitancies