Title: Name 最终装配垂直度检验 On this page is information about operators that are trained and certified to perform this Standard Work. The operators signing.

Slides:



Advertisements
Similar presentations
TITLE: Resistance and Inductance Testing SWI:REVISION:DATE:PAGES:WORK STATION: Resistance-InductanceA1/1/2014# OF Technology in Motion STANDARD.
Advertisements

TITLE: Pilot Diameter and Depth Measuring SWI:REVISION:DATE:PAGES:WORK STATION: MI Shop-Pilot Dia./DepthB # OF 6Shop Technology in Motion STANDARD.
Title: Name On this page is information about operators that are trained and certified to perform this Standard Work. The operators signing below have.
Title: Name 轴的检验 On this page is information about operators that are trained and certified to perform this Standard Work. The operators signing below.
TITLE: Pilot Diameter Measuring SWI:REVISION:DATE:PAGES:WORK STATION: MI Shop-Pilot Dia.A # OF 4Shop Technology in Motion STANDARD WORK INSTRUCTION.
COMPANY MAINTENANCE MANUAL
AS9102 First Article Inspection Report
3 Title Blocks and Part Lists Permission granted to reproduce for educational use only. Describe drawing sheet sizes and formats Identify marginal information.
Cornerstone Base Station for Calibration Management Applied System Technologies, Inc N.W. 53rd Street, Suite 101 Fort Lauderdale, Florida
Global Supplier Quality Manual PPAP Requirements
PPAP Requirements Training
First Article Inspection Report
SDC PUBLICATIONS © 2011 Chapter 11 Assembly Drawings and Blocks Learning Objectives:  Create an Assembly Drawing from Part files.  Using AutoCAD with.
1 MC Assembly via Test Cell Crane FPA Stage 3 Peer Review August 12, 2005 T. Brown.
Cornerstone Cal Station for Calibration Management Applied System Technologies, Inc N.W. 53rd Street, Suite 101 Fort Lauderdale, Florida
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
Supplementary Training Modules on Good Manufacturing Practice
Aviation Maintenance Management
Lease Agreement Instructions
By: Leonardo Medina Period: 5. What career I want to do?  I want to become a mechanical engineering.
First Article Inspection
4 Unit Title Blocks and Notes. 4 Unit Title Blocks and Notes.
BASIC KAIZEN TOOLS TARGET PROGRESS REPORT STANDARDIZED WORK SHEET
DUPAGE FLIGHT STANDARDS DISTRICT OFFICE WEST CHICAGO, ILLINOIS
Detail and Assembly Drawing
PRESENTS.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
CAPF 73 CAP VEHICLE INSPECTION GUIDE AND USAGE DATA INSTRUCTIONS.
Maintenance "Personal Minimums"
Aloe Vera of America: A Quality IASC-Certified Producer of Aloe Vera Presented by Walt Jones.
High Schools United with NASA to Create Hardware (HUNCH)
Lab # 3: The Programmable Robot General Engineering Polytechnic University.
Completing Teacher and Assistant Principal Evaluations in PeopleSoft Follow steps on the next slides in order.
WorkManager Concepts & Schema Course Outline The Old “Business Rules” Traditional LBNL CAD Method New “Business Rules” Engineering Data Management WorkManager.
Lab # 3: The Programmable Robot General Engineering Polytechnic University.
3-4 Notes. Proving a Journal Page 1)Add each of the amount columns 2)Add the debit column totals, and then add the credit column totals. 3)Verify that.
Proving and Ruling a Journal Accounting 1 Chapter 3 Section 4.
1 System for Administration, Training, and Educational Resources for NASA External Training Requests.
92 G ACF Portal USER’S MANUAL. TABLE OF CONTENTS GENERAL INFORMATION S ECTION 1.1 P ROGRAM COORDINATOR RESPONSIBILITIES (DFAC Manager) S ECTION 1.2 S.
Documentation.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
Working Drawings Stephen W. Crown Ph.D.. Working Drawings A final set of drawings providing all the details and information needed to manufacture and.
Simon Calibration Instructions Main Antenna Jig Peter Karlsson V2.
Technical Publications
Before performing the operation check that all the components that will be sewn aren’t damaged, contaminated, or incorrectly cut, according to the S0123.
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
2016 Maintenance Innovation Challenge
Welcome to the Electronic Permit Submittal and Processing System (EPSAP) Professional Engineer Submittal Instructions.
SAFE WORK INSTRUCTIONS
Accelerator Operations Department Readiness (Part 2)
Advisors, Please Complete These Three Registration Steps in Order!
Advisors, Please Complete These Three Registration Steps in Order!
First Article Inspection
SAFE WORK INSTRUCTIONS
Goodyear Napanee Contractor Safety
SAFE WORK INSTRUCTIONS
Detail Drawings and Assembly Drawings
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
Design & Drafting Technology Unit 6
Notes: Position and Time
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
Guide for successful completion of First Article Inspection Reports
Certificate of Completion
Guide for successful completion of First Article Inspection Reports
L&V Manpower Development Prepared by: HR department Mar, 2013
Summer Training Department of Industrial Engineering
LESSON 7-1 Preparing an Income Statement
Presentation transcript:

Title: Name 最终装配垂直度检验 On this page is information about operators that are trained and certified to perform this Standard Work. The operators signing below have read this SWI and have successfully performed the work described in it in the presence of the Supervisor or Engineer signing in the second column on the date in the third column. Trained and capable of performing this work: Supervisor or engineer giving Approving to perform: Date: Operator 1 Operator 2 Operator 3 Operator 4 Operator 5 Operator 6

Perpendicularity Tolerances Title: Name Safety Requirements: Safety glasses Operator Maintenance 1) 2) 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5) Material / Components 1) Mechanical sheet 2) Print 3) 4) 5) In Process Check 1)开始检验前,参考图纸或检查表上的可接收垂直度公差. 2) Mechanical sheet Perpendicularity Tolerances

2. 将指示器夹在轴端上. (注意: 有些夹指示器轴太短.) Title: Name Safety Requirements: Safety glasses Operator Maintenance 1) Verify calibration on dial indicator. 2) 3) 4) 5) Tools & Fixtures 1)V-block fixture 2)Dial indicator 3) 4) 5) Material / Components 1) motor 2) 3) 4) 5) In Process Check 1)如果轴太长,请将两块V型块叠放保证足够的空间. 2) 确保电机水平安全地放置在V型块上. 1. 将电机垂直置于V型块上 2. 将指示器夹在轴端上. (注意: 有些夹指示器轴太短.)

正确的表角度 错误的表角度 3. 将测试器的面和指针尽可能于被测表面平行. 真确的指针角度 错误的指针角度 减小此角度 Title: Name Safety Requirements: Safety glasses Operator Maintenance 1) 2) 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5) Material / Components 1) motor 2) 3) 4) 5) In Process Check 验证测量值不能超过表的量程. (测量器的表应在“0”~“1”) 正确的表角度 错误的表角度 3. 将测试器的面和指针尽可能于被测表面平行. 真确的指针角度 错误的指针角度 减小此角度

4. 将针头置于被测表面,保证针头尽可能远离中心 Title: Name Safety Requirements: Safety glasses Operator Maintenance 1) 2) 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5) Material / Components 1) 2) 3) 4) 5) In Process Check 1)Verify that indicator will not run out of travel distance. 2)在第5步旋转过程应避免指针碰到障碍物 (洞, 突起, ect.) 4. 将针头置于被测表面,保证针头尽可能远离中心 5. 旋转时指示器清零 6. 360度旋转千分表读取每个数值的总和(例如:右边0.0021+左边0.0090=总和为0.0030)

Record variance measured by dial indicator on mechanical sheet. Title: Name Safety Requirements: Safety glasses Operator Maintenance 1) 2) 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5) Material / Components 1) 2) 3) 4) 5) In Process Check 1) 测量值需在图纸或检查表的公差范围以内才算合格Measurements must be within the tolerance on the Mechanical Sheet and Print to pass inspection. 2) 7. 在表单上记录测量变化值 Record variance measured by dial indicator on mechanical sheet. 8.重复1~7步测量图纸上其它表面的垂直度 Repeat steps 1 through 7 to measure the perpendicularity of any other surface on the print.

Signatures of Authorization Revision: Date: Reason for Change: Editor: A 9-26-06 New SWI Into. Tony Dick Signatures of Authorization Production: Manufacturing: Quality: Design: Other: