Conducting a national greenhouse gas inventory The Brazilian Experience Le Morne, Mauritius, 10 April 2003 José D. G. Miguez Brazilian Ministry of Science.

Slides:



Advertisements
Similar presentations
Scaling up the global initiative on the implementation of the SNA and supporting statistics Meeting on Scaling up the coordination and resources for the.
Advertisements

INDONESIA: UN-REDD PROGRESS Montreaux, Switzerland 15 June 2009.
Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA Components III, IV and V: Conditions for successful preparation and absorption of.
Project design, preparation and approval Basel Convention Resource Mobilization Workshop Nairobi, 3 – 7 December 2006 Andreas Arlt Secretariat of the Basel.
1 Adequate Yearly Progress (AYP) U.S. Department of Education Adapted by TEA September 2003.
NATIONAL SYSTEMS UNDER ARTICLE 5 OF THE KYOTO PROTOCOL EC workshop on Quality Control and Quality Assurance of Greenhouse Gas Inventories and the Establishment.
UNFCCC expert meeting on methods and tools and on data and observations under the Nairobi work programme Introduction to the Nairobi work programme. Technologies.
IPCC Good Practices Guidance and the electronic reporting of GHG inventory tables: useful tools for improving the quality of national GHG inventories of.
Evaluating administrative and institutional capacity building
CAPACITY BUILDING WITHIN THE UNFCCC AND LDCS Richard Muyungi United Republic of Tanzania.
Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
Consultative Group of Experts OTHER INFORMATION CONSIDERED RELEVANT TO THE ACHIEVEMENT OF THE OBJECTIVE OF THE CONVENTION Jack Fitzgerald Workshop on the.
1 The International Legal Framework for Adaptation: Gaps and Challenges New Delhi, 24 October 2002 Jürgen G. J. Lefevere Programme Director Climate Change.
The Monitoring Mechanism of greenhouse gas emissions from the European Community Hartmut Behrend European Commission DG ENV.C.2, Brussels.
1 Workshop on inventories of greenhouse gas emissions from aviation and navigation May 2004, Copenhagen EU greenhouse gas emission trends and projections.
1 Introduction, reporting requirements, workshop objectives Workshop on energy balances and energy related greenhouse gas emission inventories (under WG.
1 Atmospheric Concentrations Source: CDIAC. 2 CGE Greenhouse Gas Inventory Hands-on Training Workshop for the Asian Region - Building an Inventory Management.
UNFCCC WORKSHOP Port Louis, Mauritius (8-11 April 2003) USE OF THE GUIDELINES FOR THE PREPARATION OF NATIONAL COMMUNICATIONS FROM NON-ANNEX I PARTIES MITIGATION.
IPCC Products, Procedures and Processes Amsterdam, 14 May 2010 Dr. Renate Christ, Secretary of the IPCC.
Page 1 Regional Institutional Capacity Building in the Implementation of Clean Development Mechanism in ASEAN Countries March 2004 Jakarta, Indonesia.
Presentation title Overview of measurement, reporting and verification (MRV) for developing country Parties under the Climate Change Convention Asia Pacific.
1 GEF and Adaptation to Climate Change Mauritius, April 2003.
UNFCCC Workshop on the Use of the Guidelines for the Preparation of National Communications from non- Annex I Parties Programmes Containing Measures to.
Global Environment Facility GEF approach to synergistic action on global environment issues Espoo, Finland, July 2 – 3, 2003.
Canada Climate Change Development Fund (CCCDF) Projects in support of national communications Satender Singh Department of Foreign Affairs and International.
1 IPCC IAC Review meeting R.K. Pachauri Chairman, Intergovernmental Panel on Climate Change Amsterdam, May 14, 2010 WMO UNEP.
1 M anaging the National GHG Inventory Process M anaging the National GHG Inventory Process UNDP NCSU Handbook Katarina Mareckova, UNDP UNFCCC regional.
Romania’s Reporting Activities under the UNFCCC and Kyoto Protocol Mr. Vlad Trusca Head of Climate Change Unit, UNFCCC National Focal Point Ministry of.
EVALUATION IN THE GEF Juha Uitto Director
CAPACITY BUILDING ON CLIMATE CHANGE IN UZBEKISTAN: monitoring and evaluating The Centre of Hydrometeorological Service at the Cabinet of Ministers of the.
DEVELOPMENT OF THE NATIONAL INVENTORY SYSTEM IN THE REPUBLIC OF BELARUS Belarus has signed UNFCCC in June, 1992 Ratified in May, 2000.
Plans for establishment of national system (NIS) in the Czech Republic Pavel Fott, CHMI UNFCCC workshop, Bonn, 12 April 2005.
Options and Recommendations Pre-sessional consultations on registries June 2002, Bonn, Germany DEVELOPMENT OF A NATIONAL REGISTRY IN BULGARIA Options.
1 Working for Meaningful Outcomes in Durban June 2011.
Newton Paciornik Ministry of Science and Technology General Coordination on Global Climate Change Capacity-building in Brazil.
Presentation title Current and emerging data needs of the global climate change regime - requirements/guidelines for data reporting - the review/verification.
Methods for Identifying Urgent Adaptation Needs and Actions under the LDC NAPA Dr. Paul V. Desanker Vice-Chair, UNFCCC LDC Expert Group Miombo AIACC Project.
Legal aspects - Overview Ad hoc Working Group on the Durban Platform (ADP) New agreement: - form - substance Design features & legal techniques.
VIRTUAL HEALTH LIBRARY JAMAICA PROJECT Presented by Swarna Bandara VHL Coordinator At the 4th VHL Meeting in Bahia, Salvador Sept. 2005
Aaron Zazueta Chief Evaluation Officer 2013 EVALUATION IN THE GEF.
SECTION IV: GENERAL DESCRIPTION OF STEPS TAKEN OR ENVISAGED BY NON-ANNEX I PARTY TO IMPLEMENT THE CONVENTION Workshop on the Use of the Guidelines for.
1 Enabling environments for technology transfer under the UNFCCC Daniele Violetti Programme Officer, Technology Climate Change Secretariat (UNFCCC) UNFCCC.
1 UNFCCC Workshop on Enabling Environments for Technology Transfer Ghent, Belgium, 9-10 April 2003.
1 UNFCCC national communications process/ linkages with AIACC AIACC Africa and Indian Ocean Islands Regional Workshop 24 May 2003 Dakar, Senegal Festus.
National obligations and Commitments Compiled with UNFCCC [Metodija Dimovski] [UNFCCC National Focal Point] [Head of Department of European Integration]
Brazil’s Policy Towards Climate Change Brazil signed the FCCC in 1992; ratified by National Congress in February in 1994 Since June 1994 the Ministry of.
Current situation concerning national inventory system in Ukraine 1. Previous national inventories Up to date 3 national inventories were prepared and.
Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL.
Paul Desanker Financial and Technical Support UNFCCC secretariat Framework for Capacity- building in Developing Countries Expert Workshop.
UNFCCC Workshop on the use of the guidelines, Mauritius, 8-11 april 2003 Part IV : General description of steps taken or envisaged to implement the Convention.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
GOVERNMENT OF PAKISTAN MINISTRY OF ENVIRONMENT PRESENTATION TO ENVIRONMENTAL INITIATIVES AND UNFCCC IMPLEMENTATION IN PAKISTAN.
Designated National Authority of Clean Development Mechanism (DNA-CDM) By: Prof. Dr. Mohamed A. El-Shahawy Supervisor of Climate Change Unit Egyptian Environmental.
National System in Romania - facts and challenges - Mr. Vlad Trusca Ministry of Environment and Water Management - UNFCCC Workshop on National Systems.
UNFCCC Workshop on the preparation of national communications from non-Annex I Parties General description of steps taken or envisaged by non-Annex I.
Guidelines for non-Annex I National Communications Implications for Assessment of Impacts of, and Adaptation to Climate Change Asia-Pacific Regional Workshop.
Capacity Development for the Clean Development Mechanism in the PHILIPPINES STATUS REPORT Asian Regional Workshop 16 th January 2003 Phuket, Thailand.
1 NATIONAL SYSTEMS UNFCCC Workshop on National Systems under Article 5, paragraph 1, of the Kyoto Protocol 11–12 April 2005 Wissenschaftszentrum, Bonn,
TECHNOLOGY TRANSFER AND NATIONAL COMMUNICATIONS UNFCCC /UNDP EXPERT MEETING ON METHODOLOGIES FOR TECHONOLGY NEEDS ASSESSMENTS SEOUL, KOREA April.
UNDP Guidance for National Communication Project Proposals UNFCCC Workshop on the Preparation of National Communications from non-Annex I Parties Manila,
UNFCCC secretariat, Financial and Technical Support Programme Tshering Sherpa, Associate Programme Officer Compilation of information contained in recently.
Capacity Building for Improving the Quality of GHG Inventories Europe /CIS Region Katarina Mareckova UNDP-GEF regional project manager UNFCCC workshop,
REDD+ negotiations and key milestones from Cancun to Durban Geneva, 9 May 2011 Clea Paz-Rivera, UN-REDD Secretariat.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
16-18 January 2003, Phuket, Thailand
Implementation Subprogramme
ADAPTATION TO CLIMATE CHANGE
Global Climate Change Alliance: Intra-ACP Programme
Enhanced transparency framework and examples of flexibilities
Article 6 of UNFCCC & The New Delhi Work Programme An overview
Presentation transcript:

Conducting a national greenhouse gas inventory The Brazilian Experience Le Morne, Mauritius, 10 April 2003 José D. G. Miguez Brazilian Ministry of Science and Technology

Brazilian Initial National Communication Definition of Success –within timeframe –within budget –high quality 4 years late Out of funds since December reports available on the Internet –LUCF is still missing

Strategy Large country (8.5M), population (175M) and economy (500 G) Emphasis on inventory preparation –Mitigation ( CDM ) –Adaptation (Regional Climate Change Model) Education and public awareness –Web page publishing since 1995

Timeframe Art –3 years after entry into force (May 1994) –3 years after availability of funds (SBI/2001/INF9) Country endorsement 8/31/95 GEF Council Approval 6/14/96 Signature by UNDP 8/1/96 (timeframe 1.5 y) First disbursement 12/96 Last disbursement 2/01 Since 2/01 financial resources from federal budget –Low speed

Budget Meet “agreed” full costs –USCS project US$ 0.4mi (signed in 1995) –request US$ 3mi; approved by GEF US$ 1.5mi Additional funding required IBAMA, ELETROBRAS, FAPESP, Federal Budget – out of funds since Feb, 2001 Federal Budget ( ) ‘survival’ funds Coordination by MCT (in kind contribution) only coordinator, no staff; 3 professionals with scholarships from CNPq Bureaucracy Brazilian Government (MCT, MRE, ABC, MF) UNDP first GEF Project, Contract in US$

Budget (current situation) No bridge funds Federal Budget – Climate Change Program – 2000 US$ 800K; – 2001 US$ 400K; – 2002 US$ 150K; – 2003 US$ 300K Concept paper for 2NC (hold under analysis) – conditional to submission of 1NC – conditional to the use of Decision 17/CP.8 Legal problem in using Federal Budget in 2003 –remaining staff guaranteed until June, 03

Budget and compliance Art 4.7 –extent to which developing country Parties will effectively implement their commitments will depend on the effective implementation by developed country Parties of their commitments related to financial resources and transfer of technology and will take fully into account that economic and social development and poverty eradication are the first and overriding priorities of developing country Parties Art. 13

Quality 1996 Revised IPCC Guidelines UNFCCC Guidelines (Decision 10/CP.2) comprehensive scope sectors/gases steps taken or envisaged to implement the UNFCCC involvement of institutions and experts –Most knowledgeable or provider of information activity data x emission factor –Complex (Amazonian region) –Pioneer (Savannah burning, Reservoirs) –Lack of information –Methodology for activity data uncertainty

Quality (ctnd) Client - MCT (high quality product) – UNFCCC (any product) – GEF/UNDP (financial aspects and timeframe) QA/QC (GPG IPCC) (delays not foreseen) –initial reports not accepted in MCT screening –capacity building (learning by doing) –pioneer and complex work Sugar cane burning (IPCC EF, field measurement, US EPA) –lack of sufficient human and financial resources Uncertainty and responsibility

Project Control Progress measurement –Contracts were not well done Communication among participants –different institutions –spread all over Brazil –need of newsletter Corrective interventions –lack of alternatives –lack of financial resources –lack of authority

Participants Staff of participating institutions MCT Staff - shrinking (future ?) Government full political support Coordination –Sectoral - institutions top management (other duties) –Project - Lack of authority

Positive Results Brazil constituted a multi-institutional and multi-stakeholder team under coordination of MCT –core scientific group will be able to assist Brazil in complying with future commitments (2NC) 100 institutions and 500 professionals involved –Sectoral/Industry coordination –Different level of success in coordination Methodology established Capacity building process going on 16 reports prepared in 3 languages (summary of 5000 pages of reports) Two reviews by GEF (positive comments of available reports by auditors Prof. Sathaye and Dr. Jarle) National Communication to be submitted later this year