Last Planner ® National Capital Region Community of Practice Victor Sanvido – Southland Industries Matt Bruening – Southland Industries 1.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

1 A B C
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
3rd Annual Plex/2E Worldwide Users Conference 13A Batch Processing in 2E Jeffrey A. Welsh, STAR BASE Consulting, Inc. September 20, 2007.
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Myra Shields Training Manager Introduction to OvidSP.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
David Burdett May 11, 2004 Package Binding for WS CDL.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
The 5S numbers game..
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Green Eggs and Ham.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Subtraction: Adding UP
Prof.ir. Klaas H.J. Robers, January 16, 2013 Supervising a graduating student 1.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Prof.ir. Klaas H.J. Robers, 14 July Graduation: a process organised by YOU.
1 Let’s Recapitulate. 2 Regular Languages DFAs NFAs Regular Expressions Regular Grammars.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
famous photographer Ara Guler famous photographer ARA GULER.
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.

Presentation transcript:

Last Planner ® National Capital Region Community of Practice Victor Sanvido – Southland Industries Matt Bruening – Southland Industries 1

Agenda Introductions Parade of Trades and Review Milestone Master Planning Pull Planning Make Ready Planning Weekly Work Plan Reliable Promising Measuring Performance What will you change? 2

Learning Outcomes 1.Understand LPS is a system change and an integral part of the overall lean transformation of a project or an enterprise 2.Understand the Last Planner System and its goal of reliable workflow 3.Understand that LPS requires new thinking and new behavior from top managers and participants 4.Be aware of how the LPS can eliminate waste in your process 3

Introductions Name Organization Experience with Lean or Last Planner Personal goals/outcomes for the training Existing concerns about Lean or Last Planner 4

5

Parade of Trades tables of 6 or 7 arrows point to screen 6

each take your sheet 1 = concreter …… 7 = painter give the dice to the painter give the chips to the concreter check you have 35 pieces (units of work) place pieces on your left 7 Parade of Trades

dots on the die represent the number of units of work your team can do that week each die has an average roll of 3.5 each trade has to deliver 35 units of work how many weeks to complete the work for each trade? 10 weeks for the whole project? 16 weeks 8 Parade of Trades

9

painter says “start week 1” & passes die to the left die travels round group until it meets a trade (concrete) with available work to the left concrete rolls die records number rolled on record sheet … 10 Parade of Trades

pass die to painter … 11 number on dice here number of pieces passed to next trade number of pieces on your left Parade of Trades

painter says “start week 2” & passes die to the left die travels round group until it meets a trade (bricklayer) with available work to the left bricklayer rolls die records number rolled on record sheet … 12 Parade of Trades

13 number on dice here number of pieces passed to next trade number of pieces on your left number on dice here number of pieces passed to next trade number of pieces on your left when you have processed all 35 pieces total both these two cols Parade of Trades

Please complete this form for each trade Then total the two center columns 14 total of column 1 total of column 3 highest number in col 3 week all pieces complete total these two cols circle color of dots on your dice Parade of Trades

Results Review 15 Parade of Trades

Parade of Trades Results # Weeks to Complete # Weeks to Complete Worst Best 16

17 Project Flow

Discussion How do we cope with unpredictable workflow now? Who manages the coping? How would more predictable workflow benefit the company? Projects? What obstacles do you see to making the workflow more predictable? 18

Different Form of Managing Projects 19

Learning Set milestones Specify handoffs Clarify coordination Make ready & Launch Re-Planning when needed Promise Measure PPC & Act on reasons for failure to keep promises SHOULD CAN WILL DID Weekly Work Planning Lookahead Planning Master Scheduling Milestones Master Scheduling Phase “Pull” Planning 20

Conversations & Commitments request promise declare complete declare acceptance after Fernando Flores 1. prepare 2. negotiate conditions of satisfaction & due date 3. perform 4. assess promise cycle builds trust quality 21

Making Reliable Promises I have the ability to say “no” I am competent to perform - or I have access to competence I estimate how long hands-on it will take I have the capacity & I’ll allocate it I am not having a private unspoken conversation in conflict with promise I will be responsible (clean up the mess) I can do it when … commitment processes are conversation acts 22

Which Of These Are Promises? I will do … yes maybe I can do … perhaps I will … yes I will do … if … I could do it no I cannot do it Sure I’ll try to do … & which of these are useful? 23

Create Reliable Workflow stick to commitments/promises make work ready coordinate actions learn & improve rapidly essential to project success 24

Master Planning High level view of project overview: 1.Confirms feasibility of project 2.Highlights long-lead items 3.Identifies phases 4.Establish common understanding of the deliverables for each phase. 25

26 Milestone Master Planning

Pull Planning Process This is about the conversation! Start at the end of the process and work backwards Reliable hand-offs Focus on the batch size of a handoff Understand the Conditions of Satisfaction for Hand-off 27

28

29

Make Ready Planning What work is coming up in the next 3-4 weeks? Have all the constraints been removed? What can we do? 30

31 Make Ready Planning

Weekly Work Plan Have all the constraints been removed? What will we do this week? What is our back-up plan? Who relies on this work? 32

33 Group Discussion What needs to be on the plan to complete a task?

34 Task Requirements Supervisor Labor Material Tools/Equipment Information Safe Work Place Prerequisite Work Temporary Facilities (Scaffolding, etc.) Performance Goals

Weekly Work Plan 35

36 Weekly Work Plan

37

Learning Measuring percent of plan complete (PPC) Deep dive into reasons for failure Developing and implementing lessons learned 38

PPC 39

Reasons for Variance 40

What will you change? list individually then discuss in groups of 3-4 report back 41 What are the implications of this for the way you lead and manage? How will you change your behavior to support LPS?

Learning Outcomes 1.Understand LPS is a system change and an integral part of the overall lean transformation of a project or an enterprise 2.Understand the Last Planner System and its goal of reliable workflow 3.Understand that LPS requires new thinking and new behavior from top managers and participants 4.Be aware of how the LPS can eliminate waste in your process 42

QUESTIONS? 43

Thank You 44