VeriSTAR-HLC (Hull Life Cycle) overview

Slides:



Advertisements
Similar presentations
Copyright © 2008 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Chapter 2 Introduction to XHTML Programming the World Wide Web Fourth edition.
Advertisements

Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Working with MS-ACCESS IS 240 – Database Management Lecture #2 – Assoc. Prof. M. E. Kabay, PhD, CISSP Norwich University
McGraw-Hill©The McGraw-Hill Companies, Inc., 2003 Chapter 11 Ethernet Evolution: Fast and Gigabit Ethernet.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 4 Computing Platforms.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
By Rick Clements Software Testing 101 By Rick Clements
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Projects in Computing and Information Systems A Student’s Guide
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
Excel Functions. Part 1. Introduction 2 An Excel function is a formula or a procedure that is performed in the Visual Basic environment, outside the.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Computer Literacy BASICS
Break Time Remaining 10:00.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Chapter 15 Integrated Services Digital Network ISDN Services History Subscriber Access Layers BISDN WCB/McGraw-Hill The McGraw-Hill Companies, Inc., 1998.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
BEEF & VEAL MARKET SITUATION "Single CMO" Management Committee 18 April 2013.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2013, 2009, 2006 Pearson Education, Inc.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 6 Ethernet Fundamentals.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Compliance Assurance Process (CAP) Permanency
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
©2008 Prentice Hall Business Publishing, Auditing 12/e, Arens/Beasley/Elder The Impact of Information Technology on the Audit Process Chapter 12.
Essential Cell Biology
James A. Senn’s Information Technology, 3rd Edition
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
CpSc 3220 Designing a Database
Presentation transcript:

VeriSTAR-HLC (Hull Life Cycle) overview 2013.01.21 Philippe Renard

VeriSTAR-HLC Interface

Ships in service today have no 3D model

Manual processing Today, manual processing of : Thickness measurement reports Repairs preparation Structural condition assessment « at sea, steel is life »

How to get ships 3D models ?

3D models could be exported from shipyard - Model exported from Tribon, Foran, Catia, Intergraph, etc - This is the best solution, cheaper and more accurate than class-made CAD file OpenHCM - 3D model VeriSTAR-HLC Shipyard

3D models could be built from scratch If the model cannot be exported from shipyard, it can be built from the main drawings 3D model 3D Model editor VeriSTAR-HLC

V-HLC is based on the OpenHCM standard European project CAS (2005-2008) created the OpenHCM standard Phase n°3 Geometrical model (not F.E.M.) OpenHCM Phase n°2 Condition Assessment System Partners - Bureau Veritas (initiator and coordinator) Germanischer Lloyd Russian Register of Shipping Materiaal Metingen Europe LISNAVE SENER Cybernétix Instituto Superior Tecnico INTERTANKO TOTAL Automatic entry of measurement data Phase n°1 Measurement Operator

OpenHCM consortium The OpenHCM consortium manages the evolution of the standard, taking into account the feed-back from implementations

VeriSTAR-HLC functions

Thickness measurement company "TMCo" interface module

Rules assessment - generation of IACS tables

Search for inspection data Crack layer Picture layer Warning layer Report layer Bracket in bad condition Web-frame 72 Tank 6P L42 2003-08-02

Means of access For inspection manual module Means of access: ladders, railings, etc. manholes, Condition of means of access

Condition forecast

Finite Element Model (under development) V-HLC is automatically interfaced with the finite element model V-HLC V-HULL

References: pilot operations and contracts

Spanish shipyard - OpenHCM export Export from SENER Foran CAD - May 2009 Bahia Uno 04301C (BV Class, oil tanker, Loa 71 m) Delivered - Sept 2004 at Astilleros de Murueta, Vizcaya OpenHCM of DECK in V-HLC

UTM campaign on board LNG carrier Test of software on board in real conditions CAP - February 2010 Bachir Chihani 32Y705 LNG carrier, Loa 281.7 m Delivered 1979

Ultrasonic thickness measurements "UTM" campaign on board LNG vessel Preparation of the 3D model Input of UTM directly into the model using V-HLC Feedback from TM company Improvements of software

DSME (alias Daewoo, Korea) - OpenHCM export EXMAR LNG vessels

Pilot operation with EXMAR / Excalibur Taking thickness measurements "UTM" on board Entry of UTM into V-HLC model while on board Courtesy from DSME Instant display of thickness measurements results

Other uses

VeriSTAR-SIM (Structural Integrity Management) Structural Integrity Management for Topsides Structures of fixed offshore platforms and jackets Is a module of V-HLC Input of inspection results Performs risk assessment of each component and inspection program scheduling

VeriSTAR SIM - Fixed Topsides Structures

VeriSTAR SIM - Jackets

Related cooperative projects European Union projects FLAGSHIP RISPECT HLC-AIMS Life cycle management JIP (hull of FPSOs) Participants are Exxon Mobil, oil majors and all main class societies

Owner’s benefits

Data remains in database forever Easy access to history of all ships 20 years ago 5 years ago 15 years ago Today

Hull monitoring capabilities For managers of superintendents office, to check quickly the hull condition of their ships Increase of chartering opportunities

Easy preparation of steel repairs Today’s preparation is done on paper drawings

Easy preparation of steel repairs Tomorrow, with V-HLC, scope of repairs will be shown as 3D views + renewal steel tons + repainted surface