International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012.

Slides:



Advertisements
Similar presentations
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Advertisements

Global Aviation Safety Plan
SIP/2012/ASBU/Nairobi-WP/19
ICAO AVIATION SAFETY PROGRAMMES
Global ATM Operational Concept
Federal Aviation Administration GOLD Amendment Program By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar.
Regional RAIM Prediction System – Progress Report
Federal Aviation Administration GOLD Introduction By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar GOLD.
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
Federal Aviation Administration Required Communication Performance (RCP) Date:26-30 March 2007 Presented to:ICAO Worldwide Symposium on Performance of.
Introduction to Required Communication Performance (RCP) and Required Surveillance Performance (RSP) Read Slide. SOCM/2 Christine Falk 8-10 February.
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 Satellite AIRCOM Infrastructure Reinforcement.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
Foreign Air Operator Validation & Surveillance Part I ~~ History.
Federal Aviation Administration Agenda Item 2.2: Post-Implementation Analysis of Data Link Performance Following Release 15 (R15) Ground Earth Station.
FANS (Future Air Navigation System) Flight Crew Procedures
ATS DATALINK CENTRAL REPORTING AGENCY ACTIVITIES
FANS 1/A over Iridium (FOI)
Performance based communication and surveillance
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
Introduction to Navigation Specifications
System of Systems (DRAFT) To be approved by the ICAO Council
Planning and implementation
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
1 June 2014Page 1 The ICAO EUR Regional Aviation Safety Team (IE-REST) FSFI International Workshop, 14 May 2013 Nicolas Rallo Regional Officer, Safety.
Regional Preparatory Workshop for the ITU WRC-2015
Global Operational Data Link Document (GOLD)
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
49 th Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, India, 8-12 October Presented by the International.
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
Federal Aviation Administration Performance Based Communication and Surveillance (PBCS) Data Link Operational Authorization Process Date:13-14 May 2013.
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
Workshop on preparations for ANConf/12 − ASBU methodology
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Traffic Management and FUA integration
Pan regional ICD for AIDC structure and status (SP/09)
Military Use of Data Link Phil Platt ATN2001, IEE, London
Data-link Elements and Role of Stakeholders – Reflections of an ANSP
Federal Aviation Administration Performance-Based Communication and Surveillance (PBCS) Introductory remarks Date:13-14 May 2013 Presented to:ICAO Asia-Pacific.
PBCS Workshop Bangkok, Thailand, May, 2013
APAC PBN Seminar F.LECAT (ICAO)
Data Link Communications
Federal Aviation Administration PARC CWG Update Date:8-10 February 2012 Presented to:SOCM/2 By:Tom Kraft Arnold Oldach.
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
International Civil Aviation Organization May 2013, Bangkok 1 PBCS Workshop May 2013, Bangkok Introduction 1.
APAC PBN Seminar F.LECAT (ICAO)
PARC CWG Update Presented to: SOCM/2 By: Tom Kraft
PBCS Workshop May 2013, Bangkok
SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES
Performance-Based Communication and Surveillance (PBCS)
Required Communication Performance (RCP)
Performance Based Communication and Surveillance (PBCS)
Global Operational Data Link Document (GOLD)
GOLD GOLD Introduction Presented to: SOCM/2 Seminar
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
Performance-Based Communication and Surveillance (PBCS)
Safeguarding flight data and locating/recovering on-board recorders
Regional RAIM Prediction System – Progress Report
FANS (Future Air Navigation System) Flight Crew Procedures
FANS 1/A over Iridium (FOI)
GOLD GOLD Amendment Program Presented to: SOCM/2 Seminar
Oceanic and International Operations
Presentation transcript:

International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012

2 STRUCTURE Background FANS Inter-operability Team (FIT) Outcome ICAO NATSPG/47 Outcome APANPIRG Outcome Conclusion SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

ACARS Data Link for Aviation Started in 1978 with ACARS Initial data-link applications included Departure Clearance, ATIS etc. ACARS expanded to use INMARSAT AMSS in 1990 ACARS extended to IRIDIUM Satellites since 2007 through Short Burst Data transmission

ICAO DATA-LINK SERVICES ICAO ANC created FANS Committee in 1980s and FANS Committee recommended use of data links and satellite for CNS Installation FANS 1 by Boeing and FANS A by AIRBUS defined CPDLC and ADS-C ICAO AMSS Standards adopted in Standards specify standard ITU protocols for the provision of voice and data link services.

FANS INTEROPERABILITY TEAM Lessons learnt after investigating Performance Deficiencies: – Pilots: avoid sending multiple elements in downlink messages, avoid using free-text, continue to monitor HF – Air Traffic Controllers: priority for messages containing “DUE TO WEATHER”, avoid sending multiple elements System Performance Lessons Learnt: Performance requirements include a)Message Delay: <60 seconds 95% time b)Integrity: Undetected bit errors< per hour c)CPDLC System availability: > 99.9% d)Reliability: message delivery success rate > 99%

RECOMMENDATIONS PACIFIC DATA LINK OPERATORS CPDLC Procedures a) Communication initiated on voice to be completed on voice b) Include only single request in each CPDLC clearance request c) Free text to supplement formatted message only d) Pilot not to expect controller response to position report e) Conflict in messaged to be resolved using voice f) Read-back of clearance/instruction on CPDLC not reqd. g) For relay messages i) only a free text message to be used ii) First word of the message should be ‘Relay’

7 FIT/18 OUTCOME Network availability improved Performance measured against GOLD ANSPs improved their Automation systems Recommend ISPACG develop performance based framework for Comm./Surveillance All ANSPs encouraged to support system performance monitoring outlined in GOLD Current configuration, flight crew cannot cancel or modify crew reminder. Typing errors in logon request may result flight crew waiting for 10 minutes before airplane function times out Project title (Insert, Header & Footer)

8 INMARSAT IRIDIUM FAA agrees that IRIDIUM that meets appropriate requirements be allowed CPDLC/ADS-C – Approval of IRIDIUM SATCOM for use CPDLC/ADS-C still pending AIRBUS informed IRIDIUM SATCOM tested for voice/data. Results promising – Some interference with INMARSAT – Voice calls good quality IRIDIUM “NEXT” initial launch 2015, Operational SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

9 NATSPG NATSPG Conclusion 46/02 endorsing draft proposal to amend NAT SUPPs mandating carriage/use of CPDLC & ADS-C NAT DLMA providing service, but needs data in format from ATSUs for becoming operational Noted Satellite data-link met 95% criteria for RCP 240 SBB & oceanic safety trials planned for 2012 INMARSAT clarified I-3 Classic Aero equipped aircraft will gradually begin utilizing I4 network. SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

10 APANPIRG SAT DATA-LINK performance issues raised in APANPIRG Sub-Groups in 2008 APANPIRG/19 asks ICAO to organize meeting of stake-holders to develop solutions SOCM/1 organized from 26 to 28 August, 2009 – 56 participants from 13 States, International Organizations, Industry attended – 5 Working and 16 Information papers were presented and several presentations were made SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

11 SOCM/1 OUTCOME Communication and Surveillance specifications included in the GOLD as Appendices B and C States and IATA urged to provide information for Appendices E and F of the GOLD Document Satellite data-link critical requirement for the implementation of RNP-4 -- IATA ICAO views that multiple redundant connectivity has potential of improving availability SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

12 QUESTIONS RAISED Options available for Satellite data-link considering business model Service life left on I3 Network to recover investment after implementing upgrades PARC CWG investigating use of IRIDIUM Satellite Short Burst Data (SBD) Requirement of performance specs to support “longer term” operational initiatives. SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

13 SOCM/2 Following issues were recommended in SOCM/1 for discussion in SOCM/2 Review Status of Satellite Data-link Communication in the Region Develop common Outage/Maintenance Reporting Template for STATEs/ANSPs/CRAs Develop a common service level agreement between CSPs and States/ANSPs Mid/Long Term Strategy for Satellite Communication beyond 2016 Project title (Insert, Header & Footer)

14 DATALINK PERFORMANCE Data-link performance significantly improved, safety target being achieved, efficiency target to be met APANPIRG/22 noting the pre- and post- implementation system performance monitoring requirements, urged States in the APAC Region to ensure that the appropriate data link performance monitoring is undertaken and reported to CRAs/FITs, as required, in a timely manner. (APANPIRG Conclusion 22/12) SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

15 CONCLUSION Safety targets for RNP-4 met, Efficiency target yet to be met ICAO recommends use of two or more autonomous systems Mid/Long Term strategy to be developed in view of end of lifetime of satellites SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING

16SECOND SATELLITE OPERATIONAL DATA-LINK CONTINUITY MEETING