Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Overview of the interoperability Regulation
U.S. Plans for ADS-B Briefing for
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
An Airline Perspective on the implementation of new systems SEMINAR ON THE IMPLEMENTATION OF DATALINK AND SATCOM COMMUNICATIONS Bangkok Thailand,
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
FANS (Future Air Navigation System) Flight Crew Procedures
Air / Ground Communications in Europe
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
Slide 1 NEWSKY – NEtWorking the SKY for aeronautical communications Michael Schnell, Sandro Scalise German Aerospace Center (DLR) Institute of Communications.
Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
1 ICAO WGN New Orleans Nov Programme Overview Incentives and a Mandate Issues Conclusion Contents.
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
1 PHARE Achievements Dr. H. Schröter PHARE Programme Manager EUROCONTROL version 1.1,
1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
Communication Domain Future Aeronautical Communications
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
Future Communications Roadmap
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
ATN99 International ConferencePage September 1999 London ATN99 INTERNATIONAL CONFERENCE September 1999 London Paul Hennig, United Airlines.
ATN2002 IEE, London Providing Communications Services to Support ATC Applications Akhil Sharma Senior Manager AIRCOM Service Development.
ATN 99 Service Technique de la Navigation Aérienne 1 ATN Activities & Plans ATN in FRANCE FOR SAFETY REASONS MAIN FUTURE DATA/LINK ATSC WILL BE ATN.
Rob Mead PETAL-II Trials Manager Eurocontrol, DIS/ATD
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
The Future of PETAL Technology
Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007.
International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
Mission Trajectory Step 1 From planning to deployment.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
18-19 September 2001ATN2001 (London)1 A Commitment to ATN Implementing Aeronautical Data Link Today Presented by Kevin Wohlers ACI Program Manager.
24/25 September 2002ATN2002 (London)1 Delivering CNS/ATM Services to the Aircraft Presented by Forrest Colliver A discussion of the FANS/ATN accommodation.
24 Sept '02Page 1 FANS-1/A Accommodation in an ATN Environment.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN/VDL Mode 2 Implementation Status
ATN Subnetwork Implementation:
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
CNS/ATM Overview Aramco 4/21/2017 1:46 AM
ARINC PETAL IIe VDL Mode 2, ATN …and beyond
ATN 2002, London - 24 Sep 02 1 OPERATIONAL DATA LINK AT MAASTRICHT UAC P2L PETAL TO LINK Gustaaf Janssens Maastricht UAC Project Manager P2L.
EEC-ATI (V2) 1 ATN2002 CONFERENCE LINK2000+ ATN2002 CONFERENCE LINK2000+ LINK2000+ European ATS Provider Benefits Real-time Simulation Results ATN2002.
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
International Cooperation
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Workshop on preparations for ANConf/12 − ASBU methodology
The Air Ground Datalink Server (AGDS)
ATN/VDL Mode 2 Implementation Status
Ground based ATN Router Requirements
Ground System implication for ASAS implementation
ICAO WGN New Orleans Nov 2004
DATA LINK IMPLEMENTATION IN EUROPE
ATN Subnetwork Implementation:
Presentation transcript:

Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC and ADS in Tahiti Future data-link services - Implementation Feasibility - System development - part of Link2000+

Page 2STNApresentation of data-link activities Departure Clearance and ATIS Departure clearance in use since 1993 –in Roissy CDG (93), Orly (95), and Lyon (95) Digital ATIS in use since 1994 –Orly (94) and Roissy CDG (98) ARINC 618 and 623 data-link with ACARS From trial basis to full operation –Eurocae ED78 methodology >> ED 85 (DCL) Interoperability, performance, safety requirement –Ground approval / Aircraft certification from data link to ATM safety

Page 3STNApresentation of data-link activities ADS/CPDLC in Tahiti VIVO system in Tahiti –CPDLC in use since February 96 –ADS in use since March 99 Interoperability –ARINC 622 protocols –Boeing FANS/1 and Airbus FANS/A –Eurocae WG53/RTCA Sc189 interoperability doc New communication means / new ATM –Dynamic routing (DARPS) –Separation standards reduction

Page 4STNApresentation of data-link activities Future services Feasibility study on future services –ACM (ATC Communication Management) Safety and capacity benefit related to sectorization service based on ATN CPDLC : safety and reliability –ACL (ATC Clearance) Strategic and non time critical, Initially as a backup of VHF voice service based on ATN CPDLC : safety and reliability –ATC microphone check Safety benefit

Page 5STNApresentation of data-link activities Future services Feasibility study on future services –CAP (Controller Access Parameters : IAS,Heading) Mode S Enhanced surveillance capability ADS/ATN depending on aircraft equippage –FLIPCY Flight Plan Consistency (FMS/FDPS) ADS projected profile or ACARS/Arinc 702 –DLIC (data-link initiation capability) enabling service flight plan association : safety issue

Page 6STNApresentation of data-link activities Technical and on line validation (beg ) –EOLIA (beg 2000) then PETAL/2 (2001) – specific flights with EOLIA, red label Aircraft (P2E, AAL) – Live connection to Reims center ( Reims ACC look-a-like) Operational evaluation –after civil military coordination HMI and RVSM ( ) –regular flights (AAL B767,others ?) Deployment : part of link implementation –depending on aircraft equipage –operational system and communication infrastructure end to end approval Impact on controller working methods Program phases

Page 7STNApresentation of data-link activities System development Datalink integration into CAUTRA architecture has started in 1998 –ODS-France data-link HMI –FDPS upgrade –Air ground data-link server : new component –development based on EOLIA and PRO-ATN Euro-AGDL project (Eurocontrol, DFS, NATS, STNA) –initial demonstration beg multiple aircraft simulator specific EOLIA flights

Page 8STNApresentation of data-link activities DL SERVER -DLIC -ACM - CIC -FLIPCY -CAP ES NETWORK architecture Flight Data Processing System (STPV) CAUTRA Environment Technical Supervisor Mode S

Page 9STNApresentation of data-link activities EOLIA/PRO-ATN EOLIA services : benefits for ATM –DLIC, ACM, CIC, FLIPCY Based on PRO-ATN –Compliant with CNS/ATM1 ICAO SARPS –Subnetwork VDL, Satellite Demonstration and Evaluation –Feasibility demonstration (98) + Le Bourget (99) –Pre-operational Evaluation (99/beg 2000) –Cessna Citation + A340 + Ground platforms

Page 10STNApresentation of data-link activities LINK2000+ Headlines Link services –DLIC, ACM, ACL, AMC, CAP, FLIPCY, DCL, ATIS, DSC European Implementation before 2007 –ATC Services and infrastructure with infrastructure support for AOC Geographical Area –European Core area to Start –Strong link to FAA Program Build 1/1A/2 Stakeholders commitment expected in 2000 –ATS Service providers, Eurocontrol –Airlines voluntary aircraft equipage : Link CBA

Page 11STNApresentation of data-link activities Conclusion From today To link : a big step ahead in Air Traffic Management –an encouraging experience from European projects (EOLIA, PETAL) –Evolution of working methods : controllers and pilots How to choose between voice and data-link ? Training –Safety in a very busy traffic environment has to be demonstrated –Aircraft equipage investment –Is there any other short medium term alternative ?